share_log

Kraken Energy Executes Definitive Option Agreement for the Harts Point Uranium Property, Utah

Kraken Energy Executes Definitive Option Agreement for the Harts Point Uranium Property, Utah

Kraken Energy執行猶他州哈茨角鈾礦產的最終期權協議
newsfile ·  2023/05/23 08:00

Vancouver, British Columbia--(Newsfile Corp. - May 23, 2023) - Kraken Energy Corp. (CSE: UUSA) (OTCQB: UUSAF) (the "Company" or "Kraken") is pleased to announce the execution of a definitive option agreement (the "Option Agreement" or the "Agreement") to acquire up to a 75% interest in the Harts Point Uranium Property (Figures 1 & 2) in San Juan County, southeast Utah ("Harts Point" or the "Property"). This news follows the previously announced binding letter of agreement (see May 2nd, 2023 press release).

溫哥華,不列顛哥倫比亞省-(Newsfile Corp.-2023年5月23日)-克拉肯能源公司(CSE:美國)(OTCQB:USAF)(“公司“或”海怪“)很高興地宣佈簽署了一項最終期權協定(”期權協定“或”協定收購位於猶他州東南部聖胡安縣的Harts Point鈾礦(圖1和圖2)高達75%的權益(哈茨點“或”屬性這一消息是在先前宣佈的具有約束力的協議書(見5月2日)之後發佈的發送,2023年新聞稿)。

Harts Point is located in the center of the Colorado Plateau, referred to by some as "the Athabasca Basin of the US" and is 64 kilometers ("km") (40 miles) north of the White Mesa Uranium Mill, the only fully licensed and operating conventional uranium mill in the United States. The Property consists of 324 lode mining claims on Bureau of Land Management ("BLM") ground that covers an area of 2,622 hectares ("ha") (6,480 acres) and drill permits are in place for up to 25 exploration drill holes upon payment of the US$58,000 bond to the BLM.

Harts Point位於科羅拉多高原的中心,被一些人稱為“美國的阿薩巴斯卡盆地”,位於懷特梅薩鈾廠以北64公里(“公里”)(40英里),懷特梅薩鈾廠是美國唯一一家獲得完全許可並正在運營的常規鈾廠。該物業包括土地管理局(“土地管理局”)佔地2,622公頃(6,480英畝)土地上的324個礦脈採礦權,並在向土地管理局支付58,000美元保證金後,擁有最多25個勘探鑽孔的鑽探許可證。

Garrett Ainsworth, Chairman of Kraken, stated, "We are very pleased to have executed the option agreement on Harts Point, which has strong potential to host a uranium deposit trend along the east flank of an anticline feature within the well-known Chinle Formation in the Colorado Plateau. Historical uranium mining to the east and west of Harts Point along with historic off-scale radioactivity in the Chinle Formation on Harts Point have significantly de-risked our upcoming drill program where the majority of permitting has already been completed."

Kraken公司董事長加勒特·安斯沃思表示:“我們非常高興能夠簽署關於Harts Point的期權協定,該專案有很強的潛力在科羅拉多高原著名的欽勒地層內的背斜地段東側蘊藏鈾礦。Harts Point東部和西部歷史上的鈾礦開採,以及Harts Point上Chinle地層歷史上的大規模放射性活動,大大降低了我們即將進行的鑽探計劃的風險,因為大部分許可已經完成。”

Harts Point Property Highlights:

Harts Point特性亮點:

  • World class uranium jurisdiction: located in the center of the Colorado Plateau, which has produced over 328 million ("M") pounds ("lbs") U3O8 at 0.2 to 0.4% U3O8 since the 1950s1.

  • Harts Point Anticline is Analogous to the Lisbon Valley Anticline: where the Lisbon Valley Uranium District (Figure 1) hosted 17 large uranium mines which produced approximately 80M lbs U3O8 at 0.34% U3O8 from 1948 to 19882.

    • The dimensions of these tabular sandstone-hosted uranium deposits range from 2 to 13 meters ("m") (7 to 43 feet) thick, 100 to 3,048 m (328 to 10,000 feet) long, and 31 to 427 m (100 to 1,400 feet) wide3.

  • Significant Historic Uranium Production:

    • Several historic mines located 11 km (7 miles) west of the Harts Point Property produced approximately 280,000 lbs U3O8 at 0.3% U3O8 from the favorable Chinle Formation host rock4.

    • The Lisbon Valley Anticline is located 31 km (19 miles) to the east of the Harts Point Property (Figure 1) produced approximately 80M lbs U3O8 0.34% U3O82.

  • Historic Exploration: Three wide-spaced historic oil and gas wells on the Property (Figure 2) along the east flank of the Harts Point Anticline show 'off-scale' radioactivity within the favorable Chinle Formation host rock.

  • Excellent Infrastructure: located approximately 64 km (40 miles) north of the White Mesa uranium processing facility.

    • There is excellent access throughout the Property, which is situated 45 km (28 miles) from the town of Monticello, Utah.

  • 世界級鈾礦管轄權:位於科羅拉多州高原的中心,它產生了超過3.28億磅(“磅”)U3.O8個在0.2%至0.4%U3.O8個自20世紀50年代以來1

  • Harts Point背斜類似於里斯本谷背斜:里斯本谷鈾區(圖1)的舉辦地17個大型鈾礦,產量約8000萬磅鈾3.O8個在0.34%U3.O8個從1948年到1988年2.

    • 這些以砂岩為主的板狀鈾礦床的尺寸從厚2至13米(7至43英尺),長100至3,048米(328至10,000英尺),寬31至427米(100至1,400英尺)3.

  • 歷史上重要的鈾產量:

    • 位於Harts Point地產以西11公里(7英里)處的幾個歷史悠久的礦山產生了大約28萬磅U3.O8個在0.3%U3.O8個有利的欽勒組賦存巖4.

    • 里斯本谷背斜位於Harts Point地產(圖1)以東31公里(19英里)處,大約8000萬磅U3.O8個0.34%U3.O8個2.

  • 歷史探索: 該物業內有三口大間距的歷史油氣井(圖2)沿哈茨角背斜東側在有利的欽樂組主巖中顯示了“非標度”的放射性。

  • 卓越的基礎設施:位於大約位於懷特梅薩鈾加工設施以北64公里(40英里)。

    • 整個酒店交通便利,距離猶他州蒙蒂塞洛鎮45公里(28英里)。

Matthew Schwab, CEO of Kraken, commented, "Harts Point is perfectly situated for a discovery between previously producing operations to the east and west and has historic drilling that shows 'off-scale' radioactivity within the property. With the significant upside potential at Harts Point and drill permits in place, our team is now finalizing the remaining details to begin drilling on the property as soon as possible."

Kraken的首席執行官Matthew Schwab評論說:“Harts Point的地理位置非常適合在之前東西兩側的生產作業之間進行發現,並且擁有歷史性的鑽探活動,顯示了該礦區內的‘非規模’放射性活動。隨著Harts Point的巨大上升潛力和鑽探許可的到位,我們的團隊現在正在敲定剩餘的細節,以便儘快開始在該礦區進行鑽探。”

Figure 1: Harts Point Location Map within Colorado Plateau

圖1:科羅拉多高原內的Harts點位置地圖

Figure 2: Harts Point Property with Regional Uranium Occurrences

圖2:Harts Point Property與區域鈾礦床位

Terms of the Agreement:

協定條款:

Under the terms of the Agreement, the parties have entered into a definitive option agreement (the "Option Agreement"), pursuant to which the Company may acquire up to 75% of the Harts Point Property from Atomic Minerals Corporation (TSXV: ATOM) ("Atomic") by meeting the following requirements:

根據該協定的條款,雙方已訂立最終購股權協定(“購股權協定”),根據該協定,本公司可向IAEA Minerals Corporation收購Harts Point物業最多75%的權益(TSXV:Atom)(“原子“)符合以下要求:

  • Kraken will be the operator and must incur US$1.5 million of eligible expenditures within 18 months from the date of the Option Agreement to earn a 65% interest.

  • Kraken has the option to increase interest in the Property from 65% to 75% by incurring an additional US$2.0 million of eligible expenditures within 30 months from the date of the Option Agreement and issuing Atomic 2.0 million common shares of Kraken.

  • Kraken will grant Atomic a 2.0% net smelter royalty (subject to a buy down to 1.0% for US$5.0 million).

  • After the initial option (Kraken 65%: Atomic 35%) or the extended option (Kraken 75%: Atomic 25%), a definitive Joint Venture Agreement will be formed.

  • Kraken將成為運營商,必須在期權協定簽署之日起18個月內產生150萬美元的合格支出,才能獲得65%的利息。

  • Kraken有權將該物業的權益從65%提高到75%,方法是在期權協定之日起30個月內額外產生200萬美元的符合條件的支出,併發行Atom 200萬股Kraken的普通股。

  • Kraken將向IAEA授予2.0%的冶煉廠淨特許權使用費(前提是以500萬美元的價格收購至1.0%)。

  • 在初始期權(克拉肯65%:原子35%)或延長期權(克拉肯75%:原子25%)之後,將形成最終的合資協定。

As consideration for identifying the Harts Point Property and facilitating completion of the proposed transaction, a "non-arm's length party" to the Company will be issued 110,000 common shares in the capital of the Company as a finder's fee (the "Finder's Fee Shares"). The Finder's Fee Shares will be subject to a hold period of four months and one day.

作為確認Harts Point物業及促進完成建議交易的代價,本公司將獲發行110,000股本公司股本中的普通股(“Finder‘s Feed股份”)作為找回費。發現者的費用股票將受到四個月零一天的持有期的限制。

References

參考文獻

1 Holger Albrethsen, Jr. and Frank E. McGinley (1982). Summary History of Domestic Procurement Under U.S. Atomic Energy Commission Contracts, September 1982.

1小霍爾格·阿爾佈雷森和Frank E.McGinley(1982)。《美國原子能委員會合同下的國內採購簡史》,1982年9月。

2 Chenoweth, W.L. (1990). Lisbon Valley, Utah's Premier Uranium Area, a Summary of Exploration and Ore Production. Utah Geological Survey Open File Report 188, July 1990.

2.陳諾威,W.L.(1990)。里斯本山谷,猶他州的主要鈾區,勘探和礦石生產摘要。猶他州地質調查開放檔案報告188,1990年7月。

3 Gordon W. Weir and Willard P. Puffett (1981). Incomplete manuscript on stratigraphy and structural geology and uranium-vanadium and copper deposits of the Lisbon Valley area, Utah-Colorado. Open-File Report 81-39. Pages 153 to 163. United States Department of the Interior

3.戈登·W·韋爾和威拉德·P·帕菲特(1981)。猶他州-科羅拉多州里斯本山谷地區的地層學和構造地質學以及鈾-釩和銅礦床的不完整手稿。開放--檔案報告81-39。第153至163頁。美國內政部

Geological Survey.

地質調查局。

4 Chenoweth, W.L. (1993): The geology and Production History of the Uranium deposits in the White Canyon Mining District, San Juan County, Utah, Utah Geological Survey Miscellaneous Publication 93-3.

4.陳諾威(1993):猶他州聖胡安縣白色峽谷礦區鈾礦的地質和生產歷史。地質調查雜刊93-3。

Technical Information:

技術資訊:

All scientific and technical information in this news release has been prepared by or reviewed and approved by Matthew Schwab, P.Geo., President and CEO of the Company, and Garrett Ainsworth, P.Geo., Chairman of the Company. Each of Mr. Schwab and Mr. Ainsworth is a Qualified Person for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

本新聞稿中的所有科學技術資訊均由公司首席執行官兼首席執行官馬修·施瓦布和公司董事長加勒特·安斯沃思準備或審閱和批准。施瓦布先生和安斯沃思先生均符合《國家文書43-101-礦產專案披露標準》的要求。

The data disclosed in this news release is related to historical drilling results. Kraken has not undertaken any independent investigation of the sampling, nor has it independently analyzed the results of the historical exploration work in order to verify the results. Kraken considers these historical drill results relevant as the Company is using this data as a guide to plan exploration programs. The Company's current and future exploration work includes verification of the historical data through drilling.

本新聞稿披露的數據與歷史鑽探結果有關。Kraken沒有對抽樣進行任何獨立調查,也沒有為了核實結果而對歷史勘探工作的結果進行獨立分析。Kraken認為這些歷史鑽探結果是相關的,因為公司正在使用這些數據作為計劃勘探計劃的指南。公司目前和未來的勘探工作包括通過鑽井核實歷史數據。

About Kraken Energy Corp.:

關於克拉肯能源公司:

Kraken Energy Corp. is a new energy company advancing its portfolio of high-grade uranium properties in the Unites States. The Company is advancing its 100%-owned Apex Uranium Property, located 280 km (174 miles) east from Reno, Nevada which is recognized as Nevada's largest past-producing uranium mine. The Company has additionally entered into an option agreement to earn 100% of the Garfield Hills Uranium Property. The past-producing Garfield Hills Uranium Property covers 1,238 ha (3,060 acres) and is located 19 km (12 miles) east of Hawthorne in Mineral County, Nevada. The Company has also recently staked the Huber Hills Uranium Property, located 136 km (85 miles) north of Elko, Nevada which covers 1,044 ha (2,580 acres) and encompasses the historic Race Track open pit mine.

Kraken Energy Corp.是一家新能源公司,正在推進其在美國的高品位鈾礦資產組合。該公司正在推進其100%擁有的Apex鈾礦,該鈾礦位於內華達州里諾以東280公里(174英里),被公認為內華達州最大的過去生產的鈾礦。此外,該公司還簽訂了一項期權協定,以獲得加菲爾德山鈾礦的100%權益。過去生產的加菲爾德山鈾礦佔地1238公頃(3060英畝),位於內華達州礦產縣霍桑以東19公里(12英里)處。該公司最近還收購了胡伯山鈾礦,該鈾礦位於內華達州埃爾科以北136公里(85英里)處,佔地1,044公頃(2,580英畝),包括歷史悠久的Race Track露天礦。

For more information about the Company, please visit; .

欲瞭解更多有關該公司的資料,請瀏覽;。

On Behalf of the Board of Kraken Energy Corp.

我代表克拉肯能源公司董事會發言。

Matthew Schwab
President & Chief Executive Officer

馬修·施瓦布
總裁&首席執行官

Corporate Office:
Suite 907 - 1030 West Georgia Street
Vancouver, British Columbia
V6E 2Y3
T: (604) 377-1212

公司辦公室:
西喬治亞街907-1030號套房
溫哥華,不列顛哥倫比亞省
V6E 2Y3
電話:(604)377-1212

For investor relations inquiries, contact:
Kin Communications Inc.
T: (604) 684-6730
E: uusa@kincommunications.com

如需投資者關係諮詢,請聯繫:
KIN通信公司
電話:(604)684-6730
電子郵箱:uusa@kiniciations.com

This news release contains forward-looking information which is subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ from those projected in the forward-looking statements. Forward-looking statements in this press release include our plans for exploration at the properties. These forward-looking statements are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. Risks that could change or prevent these statements from coming to fruition include changing costs for mining and processing; increased capital costs; the timing and content of upcoming work programs; geological interpretations based on drilling that may change with more detailed information; potential process methods and mineral recoveries assumption based on limited test work and by comparison to what are considered analogous deposits that with further test work may not be comparable; the availability of labour, equipment and markets for the products produced; and despite the current expected viability of the project, conditions changing such that the minerals on our property cannot be economically mined, or that the required permits to build and operate the envisaged mine can be obtained. The forward-looking information contained herein is given as of the date hereof and the Company assumes no responsibility to update or revise such information to reflect new events or circumstances, except as required by law.

本新聞稿包含前瞻性資訊,這些資訊受到各種風險、不確定因素和其他因素的影響,這些因素可能導致實際事件或結果與前瞻性陳述中預測的不同。本新聞稿中的前瞻性陳述包括我們在這些物業的勘探計劃。這些前瞻性陳述會受到各種風險、不確定因素和其他因素的影響,這些因素可能會導致實際事件或結果與前瞻性資訊中預測的大不相同。可能改變或阻止這些陳述取得成果的風險包括:採礦和加工成本的變化;資本成本增加;即將出臺的工作計劃的時間和內容;基於鑽探的地質解釋可能隨更詳細的資訊而變化;潛在的加工方法和礦物回收率假設;基於有限的測試工作以及與被視為類似礦藏的假設相比,這些礦藏在進一步的測試工作中可能無法進行比較;生產的產品可獲得勞動力、設備和市場;儘管目前預計該專案具有可行性,但條件發生了變化,使得我們財產上的礦物不能進行經濟開採,或者獲得建造和運營設想中的礦場所需的許可證。本文中包含的前瞻性資訊是截至本文發佈之日的前瞻性資訊,公司不承擔更新或修改此類資訊以反映新事件或新情況的責任,除非法律另有要求。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論