share_log

Press Release: Denison Reports Results from Q3 2021

Press Release: Denison Reports Results from Q3 2021

新聞稿:Denison報告2021年第三季度業績
Dow Jones Newswires ·  2021/11/04 17:31

Denison Reports Results from Q3 2021

Denison報告2021年第三季度業績

PR Newswire

美通社

TORONTO, Nov. 4, 2021

多倫多,2021年11月4日

TORONTO, Nov. 4, 2021 /PRNewswire/ - Denison Mines Corp. ('Denison' or the 'Company') (TSX: DML) (NYSE American: DNN) today filed its Condensed Interim Consolidated Financial Statements and Management's Discussion & Analysis ('MD&A') for the quarter ended September 30, 2021. Both documents will be available on the Company's website at www.denisonmines.com or on SEDAR (at www.sedar.com) and EDGAR (at www.sec.gov/edgar.shtml). The highlights provided below are derived from these documents and should be read in conjunction with them. All amounts in this release are in Canadian dollars unless otherwise stated. View PDF version

多倫多,2021年11月4日/美通社/--Denison Mines Corp.(“Denison”或“Company”)(多倫多證券交易所代碼:DML)(紐約證券交易所美國市場代碼:DNN)今天提交了截至2021年9月30日的季度的簡明中期合併財務報表和管理層討論與分析(“MD&A”)。這兩份文件均可在公司網站www.denisonmines.com或SEDAR(www.sedar.com)和Edgar(www.sec.gov/edgar.shtml)上查閲。下面提供的重點內容源自這些文檔,應結合這些文檔閲讀。除非另有説明,本新聞稿中的所有金額均以加元表示。查看PDF版本

David Cates, President and CEO of Denison commented, "Our recent In-Situ Recovery ('ISR') field test results reflect several years of progress made towards systematically de-risking the use of the ISR mining method at the high-grade Phoenix deposit -- culminating in the successful, and first of its kind, field test of a commercial-scale well pattern located in the expected first phase of the Phoenix orebody. Our accomplishments in the field and the laboratory have significantly increased our confidence in the use of the ISR mining method and support our landmark decision to advance the planned Phoenix ISR operation to the Feasibility Study design stage.

丹尼森公司總裁兼首席執行官David Cates評論説:“我們最近的現場回收(‘ISR’)現場測試結果反映了幾年來在系統降低高品位菲尼克斯礦藏使用ISR採礦方法風險方面取得的進展--最終成功地、也是第一次成功地進行了位於菲尼克斯礦體預期一期的商業規模井網的實地測試。我們在現場和實驗室取得的成就大大增強了我們對使用ISR採礦方法的信心,並支持了我們的里程碑。

With increased interest in the uranium market and a recent lift in both spot and long-term uranium prices, we are encouraged that future utility customers are returning to the market and looking at Denison's Wheeler River project as a potentially viable source of reliable and low-cost future supply. Taken together with our effective 95% interest in Wheeler River and strong balance sheet, which, as of today, includes 2.5M lbs U(3) O(8) of physical uranium holdings acquired at a price under US$30/lb U(3) O(8) , we believe Denison is well positioned to become an intermediate supplier of choice in the second half of the decade at a time when market fundamentals are predicted to be favourable as a result of growing demand for uranium and a relative shortage of advanced low-cost uranium development assets in stable jurisdictions.

隨着人們對鈾市場的興趣增加,以及最近現貨和長期鈾價格的上漲,我們感到鼓舞的是,未來的公用事業客户正在重返市場,並將Denison的惠勒河(Wheeler River)項目視為未來可靠和低成本供應的潛在可行來源。再加上我們在惠勒河95%的有效權益和強勁的資產負債表(截至今天,包括以低於30美元/磅U(3)O(8)的價格收購的250萬磅U(3)O(8)實物鈾持有量),我們相信Denison處於有利地位,將成為本十年後五年的中間供應商選擇,目前市場基本面預計將因鈾需求增長和穩定司法管轄區先進的低成本鈾開發資產的相對短缺而有利。

Our team is focused on advancing Phoenix in the coming months and years to realize on our vision of becoming the next new uranium producer in the Athabasca Basin region."

我們的團隊正專注於在未來幾個月和幾年內推進菲尼克斯公司的發展,以實現我們成為阿薩巴斯卡盆地地區下一家新的鈾生產商的願景。“

HIGHLIGHTS

高光


-- Successful completion of ISR field test activities at Phoenix The
initial results of the 2021 ISR field test program ('2021 ISR Field
Test') completed at the Phoenix uranium deposit ('Phoenix') include (1)
the achievement of commercial-scale production flow rates consistent with
those assumed in the pre-feasibility study ('PFS') prepared for the
Wheeler River Project ('Wheeler River' or the 'Project') in 2018; (2) the
demonstration of hydraulic control of injected solution during the ion
tracer test; and (3) the establishment of breakthrough times between
injection and recovery wells, spaced 5 to 10 metres apart, that are
consistent with the hydrogeological model prepared by Petrotek
Corporation ('Petrotek') in 2020 demonstrating "proof of concept". In
addition, the Company completed the clean-up phase following the tracer
test, demonstrating the ability to remediate the commercial scale well
('CSW') test pattern, reducing tracer concentrations to as low as 4% of
peak test levels, with eight days of remediation.
-- Advancement of Phoenix to feasibility study ('FS') stage and selection
Wood PLC as independent lead authorIn September 2021, the Wheeler River
Joint Venture ('WRJV') approved the initiation of an independent FS for
the ISR mining operation proposed for Phoenix. The completion of the FS
is a critical step in the progression of the project and is intended to
advance de-risking efforts to the point where the Company and the WRJV
will be able to make a definitive development decision. The Company also
selected leading global consulting and engineering firm Wood PLC to lead
and author the FS in accordance with Canadian Securities National
Instrument 43-101 ('NI 43-101').
-- Initiated exploration drilling programs at Wheeler River and Moon Lake
South In early September, Denison's exploration team initiated diamond
drilling exploration programs at Wheeler River, and the Moon Lake South
project. Approximately 6,500 m of diamond drilling is planned for Wheeler
River, with regional exploration drilling expected to be focused on
expanding mineralization encountered in 2020 at K West and M Zone, plus
additional exploration drilling at Phoenix Zone A to test the extents of
high-grade mineralization encountered in drill hole GWR-045. Moon Lake
South is a Denison-operated joint venture with CanAlaska Uranium Ltd., in
which Denison holds a 75% interest. Drilling planned for Moon Lake South
is expected to consist of 2,400 metres focused on testing geophysical
targets.
-- Completed acquisition of 50% of JCU (Canada) Exploration Company, Limited
('JCU') for $20.5 million In August 2021, Denison completed the
acquisition of 50% of JCU from UEX Corporation ('UEX') for cash
consideration of $20.5 million, following UEX's acquisition of 100% of
JCU from Overseas Uranium Resources Development Co., Ltd. for $41
million. JCU holds a portfolio of 12 uranium project joint venture
interests in Canada, including a 10% interest in Wheeler River, a 30.099%
interest in the Millennium project (Cameco Corporation 69.901%), a
33.8123% interest in the Kiggavik project (Orano Canada Inc. 66.1877%),
and a 34.4508% interest in the Christie Lake project (UEX 65.5492%).
-- Completed the sale of shares and warrants of GoviEx Uranium Limited
('GoviEx) for proceeds of up to $41,600,000In October, the Company sold,
by private agreement, 32,500,000 common shares of GoviEx, held by Denison
for investment purposes, and 32,500,000 common share purchase warrants,
entitling the holder of the warrant to acquire one additional common
share of GoviEx owned by Denison at an exercise price of $0.80 for a term
of up to 18 months. Denison received gross proceeds of $15,600,000 on the
sale of the shares and warrants and continues to hold 32,644,000 common
shares of GoviEx. If the GoviEx warrants are exercised in full, Denison
will receive further gross proceeds of $26,000,000 and will transfer a
further 32,500,000 GoviEx common shares to the warrant holders.
-- Recorded significant mark-to-market fair value gains on the Company's
long-term investments in uranium During the nine months ending September
30, 2021, the Company acquired 2,400,000 pounds of uranium at a weighted
average cost of $36.59 (US$29.62) per pound U3O8 to be held as a
long-term investment. Due to significant activity in the uranium spot
market in the third quarter, the spot price appreciated from US$32.10 per
pound U3O8 to US$43.00 per pound U3O8 resulting in mark-to-market gains
for the three months ended September 30, 2021 of $36,138,000 on these
uranium investments.
--圓滿完成鳳凰城ISR現場測試活動2021年ISR現場測試計劃(‘2021年ISR現場)的初步結果測試“)在菲尼克斯鈾礦(”菲尼克斯“)完成,包括(1)商業規模生產流量的實現與在為該計劃擬備的前期可行性研究(“PFS”)中所作的假設惠勒河項目(“惠勒河”或“惠勒河項目”)在2018年;(2)惠勒河項目(“惠勒河”或“惠勒河項目”);離子注入溶液的液壓控制論證示蹤劑試驗;(3)確定兩次試驗之間的突破時間。注水井和採油井,相距5至10米,即與Petrotek編制的水文地質模型一致巴西國家石油公司(“Petrotek”)在2020年展示了“概念證明”。在……裏面此外,公司還完成了示蹤劑之後的清理階段測試,展示了很好地修復商業規模的能力(‘CSW’)測試模式,將示蹤劑濃度降低到低至4%峯值檢測水平,需要8天的補救時間。--推進鳳凰衞視進入可行性研究(FS)階段和遴選伍德公司作為獨立的牽頭機構於2021年9月,惠勒河合營公司(“WRJV”)批准成立一個獨立的財務處為鳳凰城提議的ISR採礦作業。財政司司長的完成是項目進程中的關鍵一步,其目的是將降低風險的努力推進到公司和WRJV將能夠做出明確的發展決策。該公司還選定全球領先的諮詢和工程公司Wood PLC領導並根據加拿大國家證券公司的要求撰寫金融服務43-101號儀器(‘NI 43-101’)。-在惠勒河和月亮湖啟動勘探鑽探計劃9月初,丹尼森的勘探團隊在南方啟動了鑽石惠勒河和月亮湖南部的鑽探計劃項目。惠勒計劃進行約6500米的鑽石鑽探河流,預計將專注於區域勘探鑽探2020年在K West和M區遇到的不斷擴大的礦化,加上在鳳凰城A區進行額外的勘探鑽探,以測試GWR-045鑽孔遇到的高品位礦化月亮湖南方鈾公司是丹尼森公司與加拿大阿拉斯加鈾業有限公司的合資企業。丹尼森持有該公司75%的權益。計劃在月亮湖南部鑽探預計將由2400米組成,重點是測試地球物理目標。-完成收購JCU(加拿大)勘探公司50%的股份(JCU)2021年8月,丹尼森以2050萬美元完成了以現金從UEX Corporation(“UEX”)手中收購JCU 50%的股份對價2,050萬美元,此前UEX收購了100%的海外鈾資源開發有限公司的JCU,41美元百萬美元。JCU持有12個鈾項目合資企業的投資組合在加拿大的權益,包括惠勒河10%的權益,30.099%對千年項目的興趣(Cameco公司69.901%),a基加維克項目33.8123%的權益(奧拉諾加拿大公司66.1877%),以及克里斯蒂湖項目34.4508%的權益(UEX 65.5492%)。-完成出售GoviEx鈾礦有限公司的股份和認股權證(‘GoviEx)10月份,該公司以高達4160萬美元的收益出售了,根據私下協議,丹尼森持有32,500,000股GoviEx普通股作投資用途,以及三千二百五十萬份普通股認購權證,使認股權證持有人有權額外取得一份普通股丹尼森持有的GoviEx股份,行權價為0.80美元,期限為長達18個月。丹尼森獲得了15,600,000美元的毛收入出售股份及認股權證,並繼續持有32,644,000股普通股GoviEx的股票。如果GoviEx的認股權證全部行使,丹尼森將進一步獲得26,000,000美元的毛收入,並將向再向認股權證持有人出售32,500,000股GoviEx普通股。--公司股票按市值計價的公允價值大幅增加截至9月底的9個月內對鈾的長期投資2021年3月30日,該公司按加權價格收購了240萬磅鈾每磅U3O8的平均成本為36.59美元(29.62美元),作為長期投資。由於鈾礦點的重大活動第三季度市場上,現貨價格從每桶32.10美元升值英鎊U3O8跌至每磅43.00美元U3O8導致按市值計價的漲幅截至2021年9月30日的三個月,這些費用為36,138,000美元鈾投資。

About Wheeler River

關於惠勒河

Wheeler River is the largest undeveloped uranium project in the infrastructure rich eastern portion of the Athabasca Basin region, in northern Saskatchewan and is a joint venture between Denison and Denison's 50%-owned JCU. Denison is the operator of the project and holds an effective 95% ownership interest. The project is host to the high-grade Phoenix and Gryphon uranium deposits, discovered by Denison in 2008 and 2014, respectively, estimated to have combined Indicated Mineral Resources of 132.1 million pounds U(3) O(8) (1,809,000 tonnes at an average grade of 3.3% U(3) O(8) ), plus combined Inferred Mineral Resources of 3.0 million pounds U(3) O(8) (82,000 tonnes at an average grade of 1.7% U(3) O(8) ).

惠勒河是薩斯喀徹温省北部阿薩巴斯卡盆地地區基礎設施豐富的東部地區最大的未開發鈾項目,是Denison和Denison持有50%股份的JCU的合資企業。丹尼森是該項目的運營商,並持有有效的95%的所有權權益。該項目是Denison分別於2008年和2014年發現的菲尼克斯和格里豐高品位鈾礦牀的所在地,據估計,這兩個礦牀的指示礦產資源量合計為1.321億磅U(3)O(8)(1,809,000噸,平均品位為3.3%U(3)O(8)),加上綜合推斷礦產資源量為300萬磅U(3)O(8)(82,000噸,平均品位為1.7%U(3)O(8))。

The PFS was completed in late 2018, considering the potential economic merit of developing the Phoenix deposit as an ISR operation and the Gryphon deposit as a conventional underground mining operation. Taken together, the project is estimated to have mine production of 109.4 million pounds U(3) O(8) over a 14-year mine life, with a base case pre-tax net present value ('NPV') of $1.31 billion (8% discount rate), Internal Rate of Return ('IRR') of 38.7%, and initial pre-production capital expenditures of $322.5 million. The Phoenix ISR operation is estimated to have a stand-alone base case pre-tax NPV of $930.4 million (8% discount rate), IRR of 43.3%, initial pre-production capital expenditures of $322.5 million, and industry leading average operating costs of US$3.33/lb U(3) O(8) . The PFS was prepared on a project (100% ownership) and pre-tax basis, as each of the partners to the Wheeler River Joint Venture are subject to different tax and other obligations.

加油站於2018年底完工,考慮到將菲尼克斯礦藏作為ISR運營開發,將鷹頭鷹礦藏作為常規地下采礦運營開發的潛在經濟優勢。總而言之,該項目估計在14年的礦山壽命內的礦山產量為1.094億英鎊U(3)O(8),基本税前淨現值(NPV)為13.1億美元(8%貼現率),內部回報率(IRR)為38.7%,初步投產前資本支出為3.225億美元。據估計,菲尼克斯ISR業務的獨立税前淨現值為9.304億美元(折現率為8%),內部收益率為43.3%,初始生產前資本支出為3.225億美元,行業領先的平均運營成本為3.33美元/磅U(3)O(8)。PFS是在項目(100%所有權)和税前的基礎上編制的,因為惠勒河合資企業的每個合作伙伴都要繳納不同的税收和其他義務。

Further details regarding the PFS, including additional scientific and technical information, as well as after-tax results attributable to Denison's ownership interest, are described in greater detail in the NI 43-101 Technical Report titled "Pre-feasibility Study for the Wheeler River Uranium Project, Saskatchewan, Canada" dated October 30, 2018 with an effective date of September 24, 2018. A copy of this report is available on Denison's website and under its profile on SEDAR at www.sedar.com and on EDGAR at www.sec.gov/edgar.shtml.

關於加油站的更多細節,包括其他科學技術信息,以及Denison所有權權益的税後結果,在2018年10月30日題為“加拿大薩斯喀徹温省惠勒河鈾項目的預可行性研究”的NI 43-101技術報告中有更詳細的描述,該報告的生效日期為2018年9月24日。這份報告的副本可在丹尼森公司的網站和SEDAR網站(www.sedar.com)和埃德加公司(www.sec.gov/edgar.shtml)的個人資料下獲得,網址為www.sec.gov/edgar.shtml。

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論