share_log

Condor Gold Plc ("Condor", "Condor Gold" or the "Company") 3.60m True Width @ 29.1 g/t gold intercept and 4.10m True Width @ 15.23 g/t gold Drill Update at the Mestiza Open Pit

Condor Gold Plc ("Condor", "Condor Gold" or the "Company") 3.60m True Width @ 29.1 g/t gold intercept and 4.10m True Width @ 15.23 g/t gold Drill Update at the Mestiza Open Pit

禿鷹黃金公司(“禿鷹”、“禿鷹黃金”或“公司”)3.60m真寬@29.1g/t黃金截獲和4.10m真寬@15.23g/t黃金鑽機在Mestiza露天礦更新
Accesswire ·  2021/09/24 03:12

SURREY, UK / ACCESSWIRE / September 24, 2021 / Condor Gold (AIM:CNR)(TSX:COG) is pleased to announce that the first phase of infill drilling of 39 drill holes for 3371.58 metres using diamond core drilling has been completed on the Mestiza Open Pit and all assay results received. The results of the infill drilling are consistent with previous drilling grades and widths, demonstrating good continuity in gold mineralization between adjacent drill holes in the high grade zones and add confidence to the geological model. The total drilling programme on Mestiza Open Pit is approximately 7800 metres, 2 drill rigs are operating on site, the drilling should be completed within 6 weeks. The primary objective of the drill programme is to convert the Inferred Mineral Resource to a higher level of confidence Indicated Mineral Resource for inclusion in an economic Mineral Reserve and prepare the permitted Mestiza Open Pit for extraction.

英國薩裏/ACCESSWIRE/2021年9月24日/禿鷹黃金公司(多倫多證券交易所股票代碼:COG)高興地宣佈,梅斯蒂扎露天礦使用鑽石巖心鑽探完成了39個3371.58米鑽孔的第一階段加密鑽探,並收到了所有化驗結果。加密鑽探結果與以往的鑽探品位和寬度一致,表明高品位帶相鄰鑽孔間金礦化具有良好的連續性,增加了地質模型的可信度。Mestiza露天礦的總鑽井計劃約為7800米,2臺鑽機在現場作業,鑽井應在6周內完成。鑽探計劃的主要目標是將推斷礦產資源轉換為更高水平的可信度指示礦產資源,以納入經濟礦產儲備,並準備允許開採的Mestiza露天礦。

Highlights

亮點

  • 4.1 m true width at 15.23 g/t gold from 47.80 m (drill hole LIDC514) approximately 40 m below surface.
  • 3.6 m true width at 29.1 g/t gold from 105.70 m (drill hole LIDC471) approximately 85 m below surface
  • Assay results demonstrate good continuity in gold mineralization between adjacent drill holes in the high grade zones and add confidence to the geological model.
  • The total drilling programme on Mestiza Open Pit is approximately 7800 metres, 2 drill rigs are operating on site, the drilling should be completed within 6 weeks.
  • Mestiza Open Pit has currently estimated fully diluted feed mill feed in the September 2021 PEA of 499Kt at 5.37g/t gold for 86,000 oz gold and is targeted for early extraction.
  • 4.1米真寬 每噸黃金15.23克從47.80米(LIDC514號鑽孔)開始,距地面約40米。
  • 3.6米真寬 每噸黃金29.1g從地面以下約85米處的105.70米(LIDC471號鑽孔)開始
  • 化驗結果表明,高品位帶相鄰鑽孔間金礦化具有良好的連續性,增加了地質模型的可信度。
  • Mestiza露天礦的總鑽井計劃約為7800米,2臺鑽機在現場作業,鑽井應在6周內完成。
  • Mestiza Open Pit目前估計,2021年9月的PEA為499Kt,黃金為5.37g/t,可提煉86,000盎司黃金,目標是提早提取飼料廠飼料。

Mark Child, Chairman and CEO commented:

董事長兼首席執行官馬克·蔡爾德(Mark Child)評論道:

"I am delighted with the initial results of the 7800 metre infill drilling programme on our permitted high grade Mestiza Open Pit, which is targeted for early production. The high grade drill intercepts announced today of 4.1 m true width at 15.23 g/t gold and 3.6 m true width at 29.1 g/t gold, approximately 40 m and 85 m respectively below surface may add to our mineral resource inventory at Mestiza and possibly improve the Project's economics, although this will only be confirmed at the conclusion of this drilling campaign.

“我很高興我們允許的高品位Mestiza露天礦7800米加密鑽探計劃的初步結果,該計劃的目標是早期生產。今天宣佈的高品位鑽頭截獲4.1米真寬(15.23克/噸黃金)和3.6米真寬(29.1g/噸黃金),分別在地表以下約40米和85米處,可能會增加我們在梅斯蒂薩的礦產資源庫存,並可能改善項目的經濟性,儘管這一點只有在本次鑽探活動結束後才能得到證實。”

The September 2021 PEA estimated the Mestiza Open Pit can currently deliver a fully diluted mill feed of 499Kt at 5.37g/t gold for 86,000 oz gold. The tighter drill spacing has delivered relatively shallow, high grade drill intercepts which add considerable confidence to the existing monthly mine schedules".

2021年9月的PEA估計,Mestiza露天礦場目前可以提供499Kt的完全稀釋磨礦原料,黃金價格為5.37g/t,黃金產量為8.6萬盎司。更緊湊的鑽探間距提供了相對較淺的高品位鑽探截距,這為現有的月度採礦計劃增加了相當大的信心“。

About the Mestiza Open Pit

關於梅斯蒂扎露天礦

The Mestiza Open Pit sits within the La Mestiza Vein Set, which host a high grade open pit Mineral Resource Estimate ("MRE") of 432kt at 8.6g/t gold (92kt at 12.1g/t gold for 36,000 oz gold in the Indicated Category and 341kt at 7.7 g/t gold for 85,000 oz gold in the in the Inferred Category), and an underground Mineral Resource of 118kt at 5.5g/t gold in the Indicated category and 984kt at 5.3 g/t gold for 169,000 oz gold in the Inferred category (see RNS dated 28 January 2019 and Table 1 below). The Mestiza Vein Set is part of Condor's 100% owned La India Project (the "Project").

梅斯蒂扎露天礦位於La Mestiza礦脈內,該礦脈擁有432kt的高品位露天礦產資源估計,8.6g/t黃金(指示類別中的3.6萬盎司黃金為92kt,12.1g/t黃金;推斷類別中的8.5萬盎司黃金為341 kt,7.7g/t黃金),地下礦產資源量為118kt,指示類別中的黃金價格為5.5g/tMestiza礦脈套裝是禿鷹100%擁有的La India項目(“項目”)的一部分。

On 9 September 2021, Condor announced the key findings of a technical report on the Project prepared by SRK Consulting (UK) Limited ("SRK"). This technical report (the "Technical Report") presents the results of a strategic mining study to Preliminary Economic Assessment ("PEA") standards completed on the Project in 2021 (See RNS dated 9 September 2021). The 2021 PEA Technical Report will be issued within 45 days of the public disclosure to NI 43-101 standards. The PEA includes open pit mining scenarios containing mill feed from the Mestiza Open Pit. The estimated fully diluted feed mill feed for the PEA is 499Kt at 5.37g/t gold for 86,000 oz gold. Assuming a 91% metallurgical recovery and a gold price of US$1700 per oz, gold production would be 78,260 oz gold and revenues US$133M.

2021年9月9日,禿鷹宣佈了由SRK諮詢(英國)有限公司(“SRK”)編寫的關於該項目的技術報告的主要結果。本技術報告(“技術報告”)介紹了根據2021年完成的項目初步經濟評估(“PEA”)標準進行的戰略性採礦研究的結果(見2021年9月9日的RNS)。2021年PEA技術報告將在按照NI 43-101標準公開披露後45天內發佈。PEA包括露天採礦方案,其中包含來自Mestiza露天礦的磨礦飼料。據估計,PEA的完全稀釋飼料廠飼料為499Kt,黃金為5.37g/t,黃金為86,000盎司。假設91%的冶金回收率和每盎司1700美元的金價,黃金產量將為78260盎司黃金,收入為1.33億美元。

The Mestiza Vein Set is located only 3 km from the permitted processing plant on Condor's La India Project, comprises of several gold-bearing quartz veins spread across an 800 m wide corridor, and striking for 1500 m to 2000 m in north-northwest to south southeast direction along the top of a broad ridge (see Figure 1). The gold mineralised veins are contained within steep-dipping faults and to a lesser extent as breccia and stockwork veinlets within fracture zones on the walls of the faults. The gold mineralisation is best developed where the host rock on both sides of the fault is a hard, welded volcanic tuff. The high-grades occur with the faults where early quartz veins and quartz breccias have been ground to fault breccia, quartz sands or even fault clays by movement along the fault planes. A later stage, post-fault quartz mineralisation is recognised in some places overprinting the fault breccias and sands. The gold mineralisation is interpreted to be associated with both phases of quartz development.

Mestiza礦脈位於距離禿鷹La India項目許可加工廠僅3公里的地方,由幾個含金石英脈組成,橫跨800米寬的走廊,沿着寬闊的山脊頂部由北向西北向南延伸1500米至2000米(見圖1)。金礦化礦脈包含在陡峭的斷層中,在斷層壁上的破碎帶中,在較小程度上是角礫巖和網狀細脈。在斷層兩側的寄主巖石是堅硬的、焊接的火山凝灰巖時,金礦化最發育。高品位與早期石英脈和石英角礫巖通過沿斷層面運動被磨碎成斷層角礫巖、石英砂甚至斷層粘土的斷層伴生。後期,在一些地方發現了斷層後石英礦化,疊加了斷層角礫巖和砂巖。金礦化被解釋為與石英發育的兩個階段有關。

The La Mestiza Vein Set is open along strike and down dip and has parallel veins identified by rock chip sampling, which are outside the area of Mestiza Vein Set's MRE. The MRE of the deposit can potentially be increased in size with further drilling.

La Mestiza礦脈沿走向和向下傾角開放,巖屑取樣識別出平行礦脈,位於Mestiza礦脈羣的MRE區域之外。隨着進一步鑽探,礦牀的MRE可能會增加。

Figure 1. The Location of the Fully Permitted Mestiza Open Pits in Relation to the Permitted Mine Infrastructure. Open Pit Mineral Resources Shown in Blue.

圖1完全許可露天礦坑相對於許可礦山基礎設施的位置打開以藍色顯示的礦坑礦產資源。

About the Infill Drilling

關於加密鑽井

The first phase of 3371.58 m of infill drilling has 'tightened-up' the drill spacing from a mix of 50 m to 100 m spacing to a regular 50 m along strike and 50 m down-dip grid. A second phase of approximately 4500 m of infill drilling to 25 m along strike and 50 m down-dip spacing is currently underway in the area of the principal open pit resource on the Tatiana Vein. The objective of the drilling program is to further improve the confidence of the geological model and future mine schedules, aiming to upgrade a significant proportion of the 85,000 oz gold open pit MRE in the Inferred category to the Indicated category.

第一階段的3371.58米加密鑽井已經將鑽頭間距從50米到100米的混合間距“收緊”為沿走向和50米下傾網格的常規50米。在Tatiana礦脈的主要露天礦資源區域,目前正在進行第二階段約4500米的加密鑽探,沿走向鑽至25米,下傾間距為50米。鑽探計劃的目標是進一步提高地質模型和未來採礦計劃的可信度,目標是將推斷類別中85,000盎司黃金露天MRE的相當大比例提升到指示類別。

Discussion of the Assay Results

對化驗結果的討論

Assay results are generally consistent with the previous wider spaced drilling. High-grade gold intercepts have been returned from the drill holes that infill between previous high-grade intercepts, and are interpreted to demonstrate good continuity of gold mineralization in the area. (Table 1 below shows the top 8 drill intercepts to-date). The Company notes that the best drill intercept from Mestiza Open Pit to-date has been of returned at the base of the principal open pit with 3.90 m (3.6 m true width) at 29.1 g/t gold from 105.70 m in drill hole LIDC471. This is supported approximately 50 m up-dip and 25 m along strike by an intercept of 4.5m (4.11m true width) at 15.23g/t gold from 47.8m drill depth (drill hole LIDC514). The second phase of infill drilling to 25 m along strike by 50 m down-dip drill sample spacing in the areas of the open pits is underway with the goal to add further confidence to the geological model and mineral resource estimate.

化驗結果與之前的大間距鑽井大體一致。高品位金的截留物已從以前高品位截留物之間的鑽孔中返回,並被解釋為顯示了該地區金礦化的良好連續性。(下面的表1顯示了到目前為止最大的8個鑽探截獲)。本公司注意到,到目前為止,Mestiza露天礦的最佳鑽探截距是在主露天礦底部3.90米(3.6米真寬) 每噸黃金29.1g從105.70米處的LIDC471號鑽孔。從47.8米的鑽探深度(LIDC514鑽孔)以15.23g/t的黃金截距4.5米(4.11米實際寬度),支撐了大約50米的上傾角和25米的走向。露天礦地區正在進行沿走向25米、向下傾斜50米的加密鑽探,目的是進一步增強地質模型和礦產資源估算的信心。

Table 1. Top eight gold intercepts from drilling at Mestiza's Tatiana vein.

表1.在梅斯蒂薩的塔蒂亞納礦脈鑽探截獲的前八大黃金。

 

Drill hole ID

Intercept From (m)

Intercept To (m)

Interval (m)

True Width (m)

Au (g/t)

Ag (g/t)

True grade-width (gm/t)

1

LIDC471

105.70

109.60

3.90

3.6

29.09

51

104.4

2

LIDC344

76.70

80.00

3.30

2.4

28.34

39

68.4

3

LIDC514

47.80

52.30

4.50

4.1

15.23

23

62.6

4

LIDC358

160.50

164.05

3.55

2.6

23.34

67

60.6

5

LIDC365

142.60

146.20

3.60

3.3

13.72

14

45.5

6

LIDC523

21.20

22.35

1.15

1.0

43.40

34

45.2

7

LIDC360

40.30

43.40

3.10

2.6

14.44

29

38.0

8

LIDC500

206.05

208.92

2.87

2.7

13.91

15

37.7

鑽孔ID

從(M)截取

截取到(M)

間隔(M)

真寬度(米)

Au(克/噸)

AG(克/噸)

真實坡面寬度(Gm/t)

1

LIDC471

105.70

109.60

3.90

3.6

29.09

51

104.4

2

LIDC344

76.70

80.00

3.30

2.4

28.34

39

68.4

3

LIDC514

47.80

52.30

4.50

4.1

15.23

23

62.6

4

LIDC358

160.50

164.05

3.55

2.6

23.34

67

60.6

5

LIDC365

142.60

146.20

3.60

3.3

13.72

14

45.5

6

LIDC523

21.20

22.35

1.15

1.0

43.40

34

45.2

7

LIDC360

40.30

43.40

3.10

2.6

14.44

29

38.0

8

LIDC500

206.05

208.92

2.87

2.7

13.91

15

37.7

Table 2 Mineral Resource Estimate - Mestiza Vein Set (January 2019)

表2礦產資源預估--Mestiza礦脈套裝(2019年1月)

SRK MESTIZA MINERAL RESOURCE STATEMENT SPLIT PER VEIN as of January 2019 (3),(4),(5)

 

Category

Area Name

Vein Name

Cut-Off

gold

silver

 

Tonnes (kt)

Gold Grade (g/t)

Gold (Koz)

Silver Grade (g/t)

Silver (Koz)

 

Indicated

Mestiza veinset

Tatiana

0.5 g/t (OP)

92

12.1

36

19.5

57

 

Tatiana

2.0 g/t (UG)

118

5.5

21

11.3

43

 

Inferred

Mestiza veinset

Tatiana(1)

0.5 g/t (OP)

220

6.6

47

13.6

97

 

Tatiana(2)

2.0 g/t (UG)

615

3.9

77

8.8

174

 

Buenos Aires(1)

0.5 g/t (OP)

120

9.8

38

     

Buenos Aires(2)

2.0 g/t (UG)

188

7.1

43

     

Espenito(2)

2.0 g/t (UG)

181

8.4

49

     
(1) The Mestiza pits are amenable to open pit mining and the Mineral Resource Estimates are constrained within Whittle optimised pits, which SRK based on the following parameters: A Gold price of USD1,500 per ounce of gold with no adjustments. Prices are based on experience gained from other SRK Projects. Metallurgical recovery assumptions of 96% for gold are based on testwork conducted to date. Marginal costs of USD19.36/t for processing, USD5.69/t G&A and USD2.35/t for mining, slope angles defined by the Company Geotechnical study of 45°, haul cost of USD1.25/t was added to the Mestiza ore tonnes to consider transportation to the plant.  
(2) Underground mineral resources beneath the open pit are reported at a cut-off grade of 2.0 g/t over a minimum width of 1.0m. Cut-off grades are based on a price of USD1,500 per ounce of gold and gold recoveries of 91 percent for resources, costs of USD19.36/t for processing, USD4.55/t G&A and USD50.0/t for mining, without considering revenues from other metals.  
(3) Mineral Resources are not Ore Reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate and have been used to derive sub-totals, totals and weighted averages. Such calculations inherently involve a degree of rounding and consequently introduce a margin of error. Where these occur, SRK does not consider them to be material. All composites have been capped where appropriate. The Concession is wholly owned by and exploration is operated by Condor Gold plc  
(4) The reporting standard adopted for the reporting of the MRE uses the terminology, definitions and guidelines given in the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Standards on Mineral Resources and Mineral Reserves (May 2014) as required by NI 43-101.  
(5) SRK Completed a site inspection to the deposit by Mr Benjamin Parsons, MSc (MAusIMM(CP), Membership Number 222568, an appropriate "independent qualified person" as this term is defined in National Instrument 43-101.  

SRK Mestiza礦產資源表截至2019年1月按礦脈拆分(3)、(4)、(5)

類別

區域名稱

靜脈名稱

截斷

黃金

白銀

公噸(Kt)

黃金等級(克/噸)

黃金(科茲)

銀級(克/噸)

銀色(科茲)

指示

Mestiza vinset

塔蒂亞娜

0.5克/噸(OP)

92

12.1

36

19.5

57

塔蒂亞娜

2.0 g/t(UG)

118

5.5

21

11.3

43

推論

Mestiza vinset

塔蒂亞娜(1)

0.5克/噸(OP)

220

6.6

47

13.6

97

塔蒂亞娜(2)

2.0 g/t(UG)

615

3.9

77

8.8

174

布宜諾斯艾利斯(1)

0.5克/噸(OP)

120

9.8

38

布宜諾斯艾利斯(2)

2.0 g/t(UG)

188

7.1

43

埃斯佩尼託(2)

2.0 g/t(UG)

181

8.4

49

(1)Mestiza礦場可進行露天開採,而礦產資源量估計受制於惠特爾優化礦場,其SRK基於以下參數:黃金價格為每盎司黃金1,500美元,不作任何調整。價格是基於從其他SRK項目中獲得的經驗。黃金冶煉回收率為96%的假設是基於迄今進行的測試工作。加工的邊際成本為19.36美元/噸,採礦的邊際成本為5.69美元/噸,採礦的邊際成本為2.35美元/噸,根據本公司的巖土研究定義的坡度為45°,運輸成本為1.25美元/噸的Mestiza礦石噸已考慮運往工廠。
(2)露天礦地下礦產資源的邊際品位為2.0g/t,最小寬度為1.0m。截止品位是基於每盎司黃金1500美元的價格,黃金資源回收率為91%,加工成本為19.36美元/噸,G&A成本為4.55美元/噸,採礦成本為50.0美元/噸,不考慮其他金屬的收入。
(三)礦產資源不是礦石儲量,不具備經濟可行性。所有數字都經過四捨五入,以反映估計的相對準確性,並已用於計算小計、總計和加權平均數。這樣的計算本身就涉及到一定程度的舍入,因此引入了誤差幅度。在這些情況下,SRK並不認為它們是實質性的。在適當的地方,所有的複合材料都有封頂。該特許權由禿鷹黃金公司全資擁有,勘探業務由禿鷹黃金公司運營。
(4)根據NI 43-101的要求,報告MRE所採用的報告標準使用了加拿大采礦、冶金和石油學會(CIM)關於礦產資源和礦產儲量的標準(2014年5月)中給出的術語、定義和指南。
(5)SRK完成了本傑明·帕森斯先生(MAUSIMM(CP),會員編號222568)對礦藏的現場視察,他是National Instrument 43-101中定義的適當的“獨立合格人士”。

Table 3. New drill intercepts on the Tatiana vein from the 2021 infill drilling campaign.

表3.2021年加密鑽探行動在塔蒂亞納礦脈上截獲的新鑽探。

True width is an interpretation based on the current interpretation of the veins and may be revised in the future.

真寬度是基於當前對紋理的解釋進行的解釋,將來可能會修改。

*Note: Bureau Veritas Mineral Laboratories, Canada. www.bureauveritas.com/um was used for the drill assay results.

*注:加拿大礦物局Veritas實驗室。鑽探化驗結果採用www.breauveritas.com/um。

Notes:

備註:

  1. The sample chain of custody is managed by the Condor's Geology Team on site. Reported results are from diamond drilled core samples. Intervals of core to be analysed are split into half using a mechanized core cutter, with one half sent to the Laboratory for geochemical analysis and the remaining half kept in storage for future reference and uses. Diamond drilled core has been a HQ size and recoveries are consistently 100% across all drill holes intercept reported.
  2. Sampling and analytical procedures are subject to a comprehensive quality assurance and quality control program. The QAQC program involves insertion of duplicate samples, blanks and certified reference materials in the sample stream. Gold analyses are performed by standard fire assaying protocols using a 50-gram charge with atomic absorption (AAS) finish and a gravimetric finish performed for assays greater than 10 grams per tonne.
  3. Sample preparation and analysis are performed by the independent Bureau Veritas Laboratories, Canada. Samples are crushed and prepared in Managua and pulp samples for fire assay are dispatched to Vancouver, Canada. The Laboratory meets the requirements of ISO/IEC 17025 & ISO 9001, and employs a Laboratory Information Management System for sample tracking, quality control and reporting.
  1. 樣本監管鏈由禿鷹的地質團隊在現場管理。報道的結果來自鑽石鑽探的巖心樣本。要分析的巖心間隔用機械化巖心切割機一分為二,一半送到實驗室進行地球化學分析,剩下的一半保存起來,供將來參考和使用。據報道,鑽石鑽探的巖心一直是總部大小,所有鑽孔截獲的採收率都保持在100%。
  2. 取樣和分析程序要經過全面的質量保證和質量控制程序。QAQC計劃包括在樣品流中插入重複樣品、空白和經認證的標準物質。金的分析通過標準的火試金方案進行,使用50克裝藥和原子吸收(AAS)完成,對於每噸超過10克的分析執行重量分析完成。
  3. 樣品準備和分析由加拿大的獨立機構Veritas實驗室進行。樣品在馬那瓜粉碎和準備,紙漿樣品被送往加拿大温哥華進行火災檢測。實驗室符合國際標準化組織/國際電工委員會17025和ISO9001的要求,並採用實驗室信息管理系統進行樣品跟蹤、質量控制和報告。

- Ends -

-結束-

For further information please visit www.condorgold.com or contact:

欲瞭解更多信息,請訪問www.condorgold.com或聯繫:

Condor Gold plc

Mark Child, Chairman and CEO

+44 (0) 20 7493 2784

 

Beaumont Cornish Limited

Roland Cornish and James Biddle

+44 (0) 20 7628 3396

 

SP Angel Corporate Finance LLP

Ewan Leggat

+44 (0) 20 3470 0470

 

H&P Advisory Limited

Andrew Chubb and Nilesh Patel

+44 207 907 8500

 

Blytheweigh

Tim Blythe and Megan Ray

+44 (0) 20 7138 3204

 

禿鷹黃金公司

馬克·蔡爾德,董事長兼首席執行官

+44 (0) 20 7493 2784

博蒙特康尼什有限公司

羅蘭·科尼什和詹姆斯·比德爾

+44 (0) 20 7628 3396

SP Angel Corporation Finance LLP

伊萬·萊格特

+44 (0) 20 3470 0470

惠普諮詢有限公司

安德魯·丘布和尼萊什·帕特爾

+44 207 907 8500

BlytheWeight

蒂姆·布萊斯和梅根·雷

+44 (0) 20 7138 3204

About Condor Gold plc:

關於禿鷹黃金公司:

Condor Gold plc was admitted to AIM in May 2006 and dual listed on the TSX in January 2018. The Company is a gold exploration and development company with a focus on Nicaragua.

禿鷹黃金公司於2006年5月獲準進入AIM,並於2018年1月在多倫多證交所雙重上市。該公司是一家專注於尼加拉瓜的金礦勘探開發公司。

In August 2018, the Company announced that the Ministry of the Environment in Nicaragua had granted the Environmental Permit ("EP") for the development, construction and operation of a processing plant with capacity to process up to 2,800 tonnes per day at its wholly-owned La India gold project ("La India Project"). The EP is considered the master permit for mining operations in Nicaragua.

2018年8月,本公司宣佈尼加拉瓜環境部已授予環境許可證(“極壓“)在其全資擁有的La India金礦項目(”La India項目“)開發、建設和運營一個日處理能力高達2800噸的加工廠(”La India項目“)。EP被認為是尼加拉瓜採礦作業的總許可證。

La India Project contains a Mineral Resource of 9,850 Kt at 3.6 g/t gold for 1.14 M oz gold in the Indicated category and 8,479 Kt at 4.3 g/t gold for 1.18 M oz gold in the Inferred category. A gold price of $1,500/oz and a cut-off grade of 0.5 g/t and 2.0 g/t gold were assumed for open pit and underground resources, respectively. A cut-off grade of 1.5 g/t gold was furthermore applied within a part of the Inferred Resource. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that any part of the Mineral Resources will be converted to Mineral Reserves.

La India項目的礦產資源為9850千噸,指示類別的1.14百萬盎司黃金為3.6g/噸黃金,推斷類別的1.18百萬盎司黃金為8,479千噸,4.3g/t黃金。假設露天資源的金價為1500美元/盎司,截止品位為0.5g/t黃金,地下資源的截止品位為2.0g/t黃金。此外,在推斷資源的一部分內還應用了1.5g/t黃金的截止品位。礦產資源不是礦產儲量,沒有證明的經濟可行性。目前尚不能確定礦產資源的任何部分將被轉換為礦產儲備。

Environmental Permits were granted in April and May 2020 for the Mestiza and America open pits respectively, both located close to La India. The Mestiza open pit hosts 92 Kt at a grade of 12.1 g/t gold (36,000 oz contained gold) in the Indicated Mineral Resource category and 341 Kt at a grade of 7.7 g/t gold (85,000 oz contained gold) in the Inferred Mineral Resource category. The America open pit hosts 114 Kt at a grade of 8.1 g/t gold (30,000 oz) in the Indicated Mineral Resource category and 677 Kt at a grade of 3.1 g/t gold (67,000 oz) in the Inferred Mineral Resource category. Following the permitting of the Mestiza and America open pits, together with the La India open pit Condor has 1.12 M oz gold open pit Mineral Resources permitted for extraction.

2020年4月和5月,梅斯蒂扎和美國露天礦場分別獲得了環境許可證,這兩個礦場都位於拉印附近。梅斯蒂扎露天礦在指示礦產資源類別中擁有92千噸的黃金品位(3.6萬盎司),在推斷礦產資源類別中擁有341千噸的黃金品位為7.7克/噸(85,000盎司)的黃金。. 美國露天礦在指示礦產資源類別擁有114千噸黃金品位為8.1g/t(30,000盎司),在推斷礦產資源類別擁有677千噸黃金品位為3.1克/噸黃金(67,000盎司)。在Mestiza和America露天礦獲得許可後,連同La India露天礦禿鷹,已允許開採1.12億盎司的黃金露天礦產資源。

Disclaimer

免責

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) is incorporated into, or forms part of, this announcement.

本公告既不包含本公司網站的內容,也不包含可從本公司網站(或任何其他網站)的超鏈接訪問的任何網站的內容,也不構成本公告的一部分。

Qualified Persons

合格人員

The Mineral Resource Estimate has been completed by Ben Parsons, a Principal Consultant (Resource Geology) with SRK Consulting (U.S.) Inc, who is a Member of the Australian Institute of Mining and Metallurgy, MAusIMM(CP). He has some nineteen years' experience in the exploration, definition and mining of precious and base metals. Ben Parsons is a full-time employee of SRK Consulting (U.S.), Inc, an independent consultancy, and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to the type of activity which he is undertaking to qualify as a "qualified person" as defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") of the Canadian Securities Administrators and as required by the June 2009 Edition of the AIM Note for Mining and Oil & Gas Companies. Ben Parsons consents to the inclusion in the announcement of the matters based on their information in the form and context in which it appears and confirms that this information is accurate and not false or misleading.

礦產資源評估由SRK Consulting(美國)首席顧問(資源地質學)Ben Parsons完成。Inc.是澳大利亞礦業和冶金研究所MAusIMM(CP)的成員。他在貴金屬和賤金屬的勘探、定義和開採方面有大約十九年的經驗。本·帕森斯是獨立諮詢公司SRK Consulting(U.S.),Inc.的全職僱員,他對正在考慮的礦化類型和礦牀類型,以及他正在從事的符合National Instrument 43-101定義的“合格人士”的活動類型具有足夠的經驗。礦產項目信息披露標準根據加拿大證券管理人(“NI 43-101”)的要求和2009年6月版的AIM Note for Mining and Oil&Gas Companies(“AIM Note for Mining and Oil&Gas Companies”)的要求。本·帕森斯同意根據他們的信息以其出現的形式和上下文在公告中包含這些事項,並確認這些信息是準確的,不是虛假或誤導性的。

The Qualified Persons responsible for the Technical Report are Dr Tim Lucks of SRK Consulting (UK) Limited, and Mr Fernando Rodrigues, Mr Stephen Taylor and Mr Ben Parsons of SRK Consulting (U.S.) Inc. Mr Parsons assumes responsibility for the MRE, Mr Rodrigues the open pit mining aspects, Mr Taylor the underground mining aspects and Dr Lucks for the oversight of the remaining technical disciplines and compilation of the report.

負責技術報告的合格人員是SRK Consulting(UK)Limited的Tim Lucks博士,以及SRK Consulting(美國)的Fernando Rodrigues先生、Stephen Taylor先生和Ben Parsons先生。Parsons先生負責MRE,Rodrigues先生負責露天採礦方面,Taylor先生負責地下采礦方面,Lucks博士負責監督其餘技術規程和編寫報告。

The technical and scientific information in this press release has been reviewed, verified and approved by Gerald D. Crawford, P.E., who is a "qualified person" as defined by NI 43-101 and is the Chief Technical Officer of Condor Gold plc.

本新聞稿中的技術和科學信息經傑拉爾德·D·克勞福德(Gerald D.Crawford,P.E.)審核、核實和批准,他是NI 43-101定義的“合格人士”,也是禿鷹黃金公司(Condor Gold Plc)的首席技術官。

The technical and scientific information in this press release has been reviewed, verified and approved by Andrew Cheatle, P.Geo., who is a "qualified person" as defined by NI 43-101.

本新聞稿中的技術和科學信息已由P.Geo的Andrew Cheatle審核、核實和批准,他是NI 43-101定義的“合格人員”。

Forward Looking Statements

前瞻性陳述

All statements in this press release, other than statements of historical fact, are 'forward-looking information' with respect to the Company within the meaning of applicable securities laws, including statements with respect to: the ongoing mining dilution and pit optimisation studies, and the incorporation of same into any mining production schedule, future development and production plans at La India Project. Forward-looking information is often, but not always, identified by the use of words such as: "seek", "anticipate", "plan", "continue", "strategies", "estimate", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", "could", "might", "will" and similar expressions. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made including, among others, assumptions regarding: future commodity prices and royalty regimes; availability of skilled labour; timing and amount of capital expenditures; future currency exchange and interest rates; the impact of increasing competition; general conditions in economic and financial markets; availability of drilling and related equipment; effects of regulation by governmental agencies; the receipt of required permits; royalty rates; future tax rates; future operating costs; availability of future sources of funding; ability to obtain financing and assumptions underlying estimates related to adjusted funds from operations. Many assumptions are based on factors and events that are not within the control of the Company and there is no assurance they will prove to be correct.

除有關歷史事實的陳述外,本新聞稿中的所有陳述均屬適用證券法所指的有關該公司的“前瞻性信息”,包括有關正在進行的採礦稀釋和礦坑優化研究,以及將其納入La India Project的任何採礦生產時間表、未來開發和生產計劃的陳述。前瞻性信息通常(但並非總是)通過使用諸如“尋求”、“預期”、“計劃”、“繼續”、“戰略”、“估計”、“預期”、“項目”、“預測”、“潛在”、“目標”、“打算”、“相信”、“潛在”、“可能”、“可能”、“將會”和類似的表達方式來識別。前瞻性信息不是對未來業績的保證,而是基於作出陳述之日管理層的一系列估計和假設,其中除其他外,包括以下假設:未來大宗商品價格和特許權使用費制度;可獲得熟練勞動力;資本支出的時間和金額;未來貨幣匯率和利率;競爭加劇的影響;經濟和金融市場的總體狀況;鑽井和相關設備的可用性;政府機構監管的影響;所需許可證的接收;特許權使用費費率;未來税率;未來運營成本;未來資金來源的可獲得性;許多假設都基於公司無法控制的因素和事件,不能保證它們將被證明是正確的。

Such forward-looking information involves known and unknown risks, which may cause the actual results to be materially different from any future results expressed or implied by such forward-looking information, including, risks related to: mineral exploration, development and operating risks; estimation of mineralisation and resources; environmental, health and safety regulations of the resource industry; competitive conditions; operational risks; liquidity and financing risks; funding risk; exploration costs; uninsurable risks; conflicts of interest; risks of operating in Nicaragua; government policy changes; ownership risks; permitting and licencing risks; artisanal miners and community relations; difficulty in enforcement of judgments; market conditions; stress in the global economy; current global financial condition; exchange rate and currency risks; commodity prices; reliance on key personnel; dilution risk; payment of dividends; as well as those factors discussed under the heading "Risk Factors" in the Company's annual information form for the fiscal year ended December 31, 2020 dated March 31, 2021 and available under the Company's SEDAR profile at www.sedar.com.

這類前瞻性信息涉及已知和未知風險,可能導致實際結果與此類前瞻性信息明示或暗示的任何未來結果大不相同,這些風險包括:礦產勘探、開發和經營風險;礦化和資源評估;資源行業的環境、健康和安全法規;競爭狀況;運營風險;流動性和融資風險;資金風險;勘探成本;不可保風險;利益衝突;在尼加拉瓜經營的風險;政府政策變化;所有權風險;許可和許可風險;手工採礦者和當前的全球財務狀況;匯率和貨幣風險;大宗商品價格;對關鍵人員的依賴;稀釋風險;股息的支付;以及在截至2021年3月31日的公司年度信息表中“風險因素”標題下討論的那些因素,這些因素可在公司SEDAR簡介中獲得,網址為:Www.sedar.com.

Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise unless required by law.

儘管公司試圖找出可能導致實際行動、事件或結果與前瞻性信息中描述的大不相同的重要因素,但也可能有其他因素導致行動、事件或結果與預期、估計或預期的不同。不能保證這些信息將被證明是準確的,因為實際結果和未來事件可能與此類聲明中預期的大不相同。除非法律要求,否則公司不會因為新信息、未來事件或其他原因而更新或修改任何前瞻性信息,也不承擔任何義務。

Technical Glossary

技術術語表

Assay The laboratory test conducted to determine the proportion of a mineral within a rock or other material. Usually reported as parts per million which is equivalent to grams of the mineral (i.e. gold) per tonne of rock
Ag Silver
Au Gold
Breccia A fragmental rock, composed of rounded to angular broken rock fragments held together by a mineral cement or in a fine-grained matrix. They can be formed by igneous, tectonic, sedimentary or hydrothermal processes.
Down-dip Further down towards the deepest parts of an ore body or zone of mineralisation.
Epithermal Mineral veins and ore deposited from fluids at shallow depths at low pressure and temperatures ranging from 50-300°C.
Fault The plane along which two rock masses have moved or slide against each other in opposing directions.
Foot wall Originally a miner's term to refer to the rock below the mineralised zone that they exploited. Now often used to the rock adjacent to and below an ore or mineralised body or geological fault. Note that on steeply-dipping tabular ore or mineralised bodies the foot wall will be inclined nearer to the vertical than horizontal.
Grade The proportion of a mineral within a rock or other material. For gold mineralisation this is usually reported as grams of gold per tonne of rock (g/t)
g/t grams per tonne
Indicated Mineral Resource That part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.
Inferred Mineral Resource That part of a Mineral Resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that may be limited, or of uncertain quality and reliability,
Hanging wall Originally a miner's term to refer to the rock above the mineralised zone that they exploited. Now often used to refer to the rock adjacent to and above an ore or mineralised body or geological fault. Note that on steeply-dipping tabular ore or mineralised bodies the hanging wall will be inclined nearer to the vertical than horizontal.
Kt Thousand tonnes
Mineral Resource A concentration or occurrence of material of economic interest in or on the Earth's crust in such a form, quality, and quantity that there are reasonable and realistic prospects for eventual economic extraction. The location, quantity, grade, continuity and other geological characteristics of a Mineral Resource are known, estimated from specific geological knowledge, or interpreted from a well constrained and portrayed geological model.
NI 43-101 Canadian National Instrument 43-101 a common standard for reporting of identified mineral resources and ore reserves
Open pit mining A method of extracting minerals from the earth by excavating downwards from the surface such that the ore is extracted in the open air (as opposed to underground mining).
Quartz veins Deposit of quartz rock that develop in fractures and fissures in the surrounding rock. They are deposited by saturated geothermal liquids rising to the surface through the cracks in the rock and then cooling, taking on the shape of the cracks that they fill.
Stockwork Multiple connected veins with more than one orientation, typically consisting of millimetre to centimetre thick fracture-fill veins and veinlets.
Strike length The longest horizontal dimension of an ore body or zone of mineralisation.
Vein A sheet-like body of crystallised minerals within a rock, generally forming in a discontinuity or crack between two rock masses. Economic concentrations of gold are often contained within vein minerals.
測定法 測定巖石或其他材料中礦物比例的實驗室試驗。通常報告為百萬分之幾,相當於每噸巖石含有的礦物(即黃金)克。
白銀
Au 黃金
角礫巖 碎石一種碎石,由圓形到稜角的碎石碎片組成,由礦物水泥或細粒基質粘合在一起它們可以由火成巖、構造、沉積或熱液作用形成。
向下傾斜 進一步向下延伸至礦體或礦化帶的最深部位。
超熱 在50-300°C的低壓和温度範圍內,從淺層流體中沉積的礦脈和礦石。
斷層 兩個巖石相互朝相反方向移動或滑動的平面。
山腳牆 最初是礦工的術語,指的是他們開採的礦化帶下面的巖石。現在通常用來指礦石、礦化體或地質斷層附近和下面的巖石。請注意,在陡峭傾斜的板狀礦石或礦化體上,腳壁將更接近垂直,而不是水平。
等級 礦物在巖石或其他材料中的比例。對於金礦化,通常以每噸巖石含金量(克/噸)來報告。
克/噸 每噸克
指示礦產資源 礦產資源的一部分,其噸位、密度、形狀、物理特徵、品位和礦物含量可以合理地估計。它是基於通過適當的技術從露頭、戰壕、礦井、工作面和鑽孔等地點收集的勘探、採樣和測試信息。這些位置太寬或間距不適當,無法確認地質和/或坡面的連續性,但間距足夠近,不足以假定連續性。
推斷的礦產資源 礦產資源的一部分,其噸位、品位和礦物含量可以以較低的置信度進行估計。它是從地質證據中推斷出來的,假定但沒有證實地質和/或品位的連續性。它是基於通過適當的技術從露頭、戰壕、礦井、工作面和鑽孔等位置收集的信息,這些位置可能是有限的,或者是質量和可靠性不確定的,
掛牆 最初是礦工的術語,指的是他們開採的礦化帶上方的巖石。現在經常用來指礦石、礦化體或地質斷層附近或之上的巖石。請注意,在陡峭傾斜的板狀礦石或礦化體上,上盤將更接近垂直,而不是水平。
KT 千噸
礦產資源 地殼中或地殼上有經濟價值的物質的集中或賦存,其形式、質量和數量使最終的經濟開採具有合理和現實的前景。礦產資源的位置、數量、品位、連續性和其他地質特徵是已知的,可以根據特定的地質知識進行估計,也可以通過嚴格約束和刻畫的地質模型來解釋。
NI 43-101 加拿大國家文書43-101-報告已查明礦產資源和礦石儲量的通用標準
露天採礦 一種從地面向下挖掘礦物質的方法,這樣礦石就可以在露天開採(與地下開採相反)。
石英脈 發育在圍巖裂縫和裂隙中的石英巖沉積。它們是由飽和的地熱液體通過巖石的裂縫上升到地表,然後冷卻,形成它們填充的裂縫的形狀而沉積的。
鐵絲網 具有多個方向的多個相連靜脈,通常由毫米到釐米厚的裂縫填充靜脈和小靜脈組成。
走向長度 礦體或礦化帶的最長水平維度。
巖石中的片狀結晶礦物質,通常在兩塊巖石之間的不連續或裂隙中形成。經濟上集中的金通常包含在脈狀礦物中。

SOURCE: Condor Gold plc

資料來源:禿鷹黃金公司


View source version on accesswire.com:
在accesswire.com上查看源代碼版本:

https://www.accesswire.com/665409/Condor-Gold-Plc-Condor-Condor-Gold-or-the-Company-360m-True-Width-291-gt-gold-intercept-and-410m-True-Width-1523-gt-gold-Drill-Update-at-the-Mestiza-Open-Pit
Https://www.accesswire.com/665409/Condor-Gold-Plc-Condor-Condor-Gold-or-the-Company-360m-True-Width-291-gt-gold-intercept-and-410m-True-Width-1523-gt-gold-Drill-Update-at-the-Mestiza-Open-Pit

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論