share_log

PureGold Files Independent Technical Report With Updated Mineral Resource Estimate for PureGold Mine

PureGold Files Independent Technical Report With Updated Mineral Resource Estimate for PureGold Mine

普雷戈爾德檔案獨立技術報告與普雷戈爾德礦最新礦產資源估算
GlobeNewswire ·  2022/09/26 06:35

VANCOUVER, British Columbia, Sept. 26, 2022 (GLOBE NEWSWIRE) -- Pure Gold Mining Inc. (TSX-V:PGM, LSE:PUR) ("PureGold" or the "Company"), is pleased to announce that following the release of an updated Mineral Resource Estimate ("MRE") on August 10th 2022, the Company has filed a National Instrument 43-101 Technical Report entitled "Independent NI 43-101 Technical Report and Updated Mineral Resource Estimate for the PureGold Mine, Canada", prepared by SRK Consulting, dated September 23rd, 2022, with an effective date of December 31st, 2021. The report is available on SEDAR at and has also been posted on the Company's website at

温哥華,不列顛哥倫比亞省,9月2022年2月26日(Global Newswire)--Pure Gold Mining Inc.(多倫多證券交易所股票代碼:PGM,倫敦證券交易所代碼:PUR)(“Puregold”或“公司”)高興地宣佈,繼8月10日發佈最新的礦產資源評估(“MRE”)後這是2022年,公司已經提交了由SRK諮詢公司於9月23日編寫的題為《加拿大普雷戈爾德礦獨立NI 43-101技術報告和更新的礦產資源估計》的National Instrument 43-101技術報告研發,2022年,生效日期為12月31日ST,2021年。該報告可在SEDAR網站上查閲,也可在公司網站上發佈,網址為

2022 Mineral Resource Estimate Highlights:

2022年礦產資源評估要點:

The PureGold Mine MRE includes1,2:

普雷戈爾德煤礦的MRE包括1,2:

1.65 million ounces of gold at 7.4 grams per tonne ("g/t") within 6.9 million tonnes in the Indicated Mineral Resource category, and

165萬盎司黃金,每噸7.4克(“克/噸”),屬於690萬公噸的指示礦產資源類別,以及

0.37 million ounces of gold at 6.3 g/t within 1.8 million tonnes in the Inferred Mineral Resource category.

推斷礦產資源類別中37.7萬盎司黃金,6.3g/噸,180萬噸內。

The updated MRE will form the basis of a new Pre-Feasibility Study (PFS) and updated Life of Mine plan, which is being led by SRK and expected to be released in the fourth quarter of 2022. This updated PFS will incorporate several ongoing trade-off studies and will identify the best value-maximizing operational path forward for the Company.

更新的MRE將構成新的預可行性研究(PFS)和更新的礦山壽命計劃的基礎,該計劃由SRK牽頭,預計將於2022年第四季度發佈。這份最新的PFS將納入幾項正在進行的權衡研究,並將確定公司未來實現價值最大化的最佳運營路徑。

  1. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the Mineral Resources estimated will be converted into Mineral Reserves. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. The Canadian Institute of Mining, Metallurgy and Petroleum definitions were followed for the classification of Indicated and Inferred Mineral Resources. The quantity and grade of reported Inferred Mineral Resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred Mineral Resources as an Indicated Mineral Resource and it is uncertain if further exploration will result in upgrading them to an Indicated Mineral Resource category. All figures have been rounded to reflect the relative precision of the estimates. Mineral Resources are reported as constrained with an underground Mining Stope Optimizer tool which generated optimized stope shapes using an assumed gold price of US$1800/ounce, a mining recovery of 95.0%, metallurgical recovery of 95.0%, and successive MSO runs at stope heights of 3, 6, and 12 metres. Mineral Resources are stated as undiluted tonnes and gold grade above a 3.38 g/t cutoff.
  2. For further information, see the technical report titled "Independent NI 43-101 Technical Report and Updated Mineral Resource Estimate for the PureGold Mine, Canada" with an effective date of December 31, 2022, and dated September 23, 2022, for further information, available at puregoldmining.ca or under the Company's Sedar profile at 
  1. 礦產資源不是礦產儲量,沒有證明的經濟可行性。目前尚不能確定所估計的全部或任何部分礦產資源將被轉換為礦產儲量。礦產資源的估計可能會受到環境、許可、法律、所有權、税收、社會政治、營銷或其他相關問題的重大影響。指示和推斷礦產資源的分類遵循了加拿大采礦、冶金和石油學會的定義。本次評估中報告的推斷礦產資源的數量和品位在性質上是不確定的,沒有足夠的勘探將這些推斷礦產資源定義為指示礦產資源,也不確定進一步勘探是否會導致將其提升為指示礦產資源類別。所有數字都經過四捨五入,以反映估計的相對精確度。據報道,礦產資源受到地下采礦採場優化器工具的限制,該工具使用假設的金價為1800美元/盎司,採礦回收率為95.0%,冶金回收率為95.0%,並在3、6和12米的採場高度連續運行MSO,生成優化的採場形狀。礦產資源量為未稀釋噸,金品位高於3.38克/噸。
  2. 欲瞭解更多信息,請參閲題為《加拿大普雷戈爾德礦獨立NI 43-101技術報告和最新礦產資源評估》的技術報告,生效日期為2022年12月31日,日期為2022年9月23日。Puregoldmining.ca或在公司的Sedar個人資料下,

Qualified Persons and NI 43-101 Disclosure

合格人員和NI 43-101披露

Terrence Smith, P.Eng. Chief Operating Officer for the Company, is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same.

特倫斯·史密斯,P.Eng公司首席運營官是國家儀器43-101所指的本新聞稿的指定合格人員,並已審查和核實本新聞稿中包含的技術信息是準確的,並批准對其進行書面披露。

About Pure Gold Mining Inc.

Pure Gold礦業公司簡介

PureGold is a Canadian gold mining company, located in Red Lake, Ontario, Canada. The Company owns and operates the PureGold Mine, which began gold production in 2021 after the successful construction of an 800 tpd underground mine and processing facility. The PureGold Mine is centered on a forty-seven square kilometre property with significant discovery potential.

Puregold是一家加拿大金礦公司,位於加拿大安大略省紅湖。該公司擁有並運營Puregold礦,該礦在成功建設日產量800噸的地下礦山和加工設施後,於2021年開始生產黃金。普雷戈爾德礦以一塊47平方公里的土地為中心,具有巨大的發現潛力。

Additional information about the Company and its activities may be found on the Company's website at  and under the Company's profile at 

欲瞭解更多有關本公司及其活動的信息,請瀏覽本公司網站及本公司簡介,網址為

ON BEHALF OF THE BOARD
"Mark O'Dea"           
Mark O'Dea, President & CEO
Investor inquiries:
Adrian O'Brien,
Director, IR & Communications
Tel: 604-809-6890
aobrien@puregoldmining.ca

我代表董事會
"馬克·奧迪亞"
馬克·奧迪亞,總裁&首席執行官
投資者諮詢:
禤浩焯·奧布萊恩,
董事、IR和通信
電話:604-809-6890
郵箱:aobrien@puregoldmining.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

All statements in this press release, other than statements of historical fact, are "forward-looking information" with respect to PureGold within the meaning of applicable securities laws, including, but not limited to statements with respect to those that address proposed timing of development plans for the PureGold Mine, including the proposed updated NI 43-101 Technical Report and timing and content of such Technical Report, including the life of mine plan; expectations regarding the effectiveness of new initiatives to improve stope access and result in increased throughput, improved grades and reduced costs in 2022; achievement of minimum targets with respect to ore production, average head grade and reduction in monthly operating costs by the end of 2022 compared to 2021; potential for extending the mine life of the PureGold Mine; the timing and results of the new Pre-Feasibility Study and updated Life of Mine Plan; the potential to convert resources to reserves; the transition of mining from the McVeigh Zone to the South Austin and Austin Zones; and potential for additional resources and expansion of known deposits and potential for making new discoveries and the focus of the Company in the coming months. Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "progress", "confirms", "continue", "planned", "expect", "expectations", "expand", "enhanced", "increasing", "optimize", "project", "predict", "potential", "supports", "targeting", "intends", "believe", "improved", "potential", and similar expressions, or describes a "goal", or variation , of such words and phrases or state that certain actions, events or results "may", "should", "confirms", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made including, among others, assumptions about future prices of gold and other metal prices, currency exchange rates and interest rates, favourable operating conditions, political stability, obtaining governmental approvals and financing on time, obtaining renewals for existing licences and permits and obtaining required licences and permits, labour stability, stability in market conditions, availability of equipment, accuracy of any mineral resources, successful resolution of disputes and anticipated costs and expenditures. Many assumptions are based on factors and events that are not within the control of PureGold and there is no assurance they will prove to be correct.

除有關歷史事實的陳述外,本新聞稿中的所有陳述均為適用證券法所指的有關Puregold的“前瞻性信息”,包括但不限於涉及Puregold礦開發計劃的擬議時間安排的陳述,包括擬議的最新NI 43-101技術報告和此類技術報告的時間和內容,包括礦山計劃的壽命;有關改善採場通道和2022年產量增加、品位提高和成本降低的新舉措的有效性的預期;與2021年相比,到2022年底實現礦石產量、平均頭品位和每月運營成本的最低目標的可能性;延長Puregold礦採礦壽命的潛力;新的預可行性研究和更新的礦山壽命計劃的時間和結果;將資源轉換為儲量的潛力;從McVeigh區到南奧斯汀和奧斯汀區的採礦過渡;以及額外資源的潛力和已知礦藏的擴大,以及未來幾個月新發現和公司的重點。前瞻性信息常常,但並非總是,通過使用諸如“尋求”、“預期”、“計劃”、“進展”、“確認”、“繼續”、“計劃”、“預期”、“預期”、“擴大”、“增強”、“增加”、“優化”、“項目”、“預測”、“潛在”、“支持”、“目標”、“打算”、“相信”、“改進”、“潛在”、“支持”、“目標”、“打算”、“相信”、“改進”、“潛在”等詞語來識別。以及類似的表達,或描述這些詞語和短語的“目標”或變體,或陳述某些行動、事件或結果“可能”、“應該”、“確認”、“可能”、“將”、“可能”或“將”被採取, 發生或被實現。前瞻性信息並不是對未來業績的保證,基於陳述日管理層的一系列估計和假設,包括但不限於對未來黃金和其他金屬價格、貨幣匯率和利率、有利的經營條件、政治穩定、按時獲得政府批准和融資、獲得現有牌照和許可證的續簽和獲得所需牌照和許可證、勞動力穩定性、市場條件的穩定性、設備可獲得性、任何礦產資源的準確性、成功解決糾紛和預期成本與支出等的假設。許多假設是基於不在普雷戈爾德控制範圍內的因素和事件,也不能保證它們會被證明是正確的。

Such forward-looking information, involves known and unknown risks, which may cause the actual results to be materially different from any future results expressed or implied by such forward-looking information, including, risks related to liquidity and the Company's ability to continue as a going concern; mine closure and rehabilitation; failure to achieve estimates or material increases in costs; history of net losses and negative operating cash flow, indebtedness; interpretation of results at the PureGold Mine complex, including reserve and resource estimates may prove to be incorrect; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; the costs and timing of the development of new deposits; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; the timing and success of exploration and development activities generally; delays in permitting; possible claims against the Company; the timing of future economic studies; labour disputes and other risks of the mining industry; delays in obtaining governmental approvals, financing or in the completion of exploration as well as those factors discussed in the Annual Information Form of the Company dated March 30, 2022 in the section entitled "Risk Factors", under PureGold's SEDAR profile at .

此類前瞻性信息涉及已知和未知風險,可能導致實際結果與此類前瞻性信息明示或暗示的任何未來結果大不相同,這些前瞻性信息包括:與流動資金和公司繼續經營的能力有關的風險;礦山關閉和修復;成本未能達到估計或實質性增加;淨虧損和負經營現金流、負債;對普雷戈爾德綜合礦場結果的解釋,包括儲量和資源估計可能被證明是不正確的;隨着計劃的不斷完善,項目參數的變化;當前的經濟狀況;商品的未來價格;品位或回收率可能的變化;開發新礦藏的成本和時機;設備或流程未能按預期運作;合同方未能履行職責;勘探和開發活動的總體時機和成功程度;許可的延誤;可能對公司提出的索賠;未來經濟研究的時機;勞資糾紛和採礦業的其他風險;在獲得政府批准、融資或完成勘探方面的延誤,以及在公司於2022年3月30日的年度信息表中“風險因素”一節討論的那些因素,在Puregold的SEDAR簡介下,.

Although PureGold has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. PureGold disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise unless required by law.

儘管普雷戈爾德試圖確定可能導致實際行動、事件或結果與前瞻性信息中描述的大不相同的重要因素,但可能還有其他因素導致行動、事件或結果與預期、估計或預期的不同。不能保證這些信息將被證明是準確的,因為實際結果和未來事件可能與這類聲明中預期的大不相同。普雷戈爾德公司沒有任何更新或修改任何前瞻性信息的意圖或義務,無論是由於新信息、未來事件或其他原因,除非法律要求。


声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論