share_log

Probe Metals Infill Drilling Confirms Strong Continuity of Resource, Including Intercepts of up to 3.4g/t Au Over 25.3 Metres at Monique, Val-d’Or East Project

Probe Metals Infill Drilling Confirms Strong Continuity of Resource, Including Intercepts of up to 3.4g/t Au Over 25.3 Metres at Monique, Val-d’Or East Project

探測金屬填充鑽探證實了資源的強大連續性,包括在Val-d‘Or East項目Monique的25.3米處截獲高達3.4克/噸的Au
GlobeNewswire ·  2022/09/07 06:39

Figure 1

圖1

Surface Map – Monique Gold Trend new drilling
地形圖-莫尼克黃金趨勢新鑽探

Highlights:

重點:

  • Results of the infill and expansion drill campaign continue to show growth and improvement of the Monique Deposit and mine planupdated resource for Monique deposit expected by year end, and for Pascalis and Courvan trends in Q1 2023
  • Infill drilling continues to strengthen resource and returned significant new intersections grading up to 1.5 g/t Au over 70.7 metres, including 3.4 g/t Au over 25.3 metres, and 1.2 g/t Au over 40.2 metres
  • Expansion drilling cut new intercepts grading up to 2.6 g/t Au over 13.7 metre and 1.3 g/t Au over 22.1 metres nearby the existing resource
  • Resource growth and conversion to date supports simplification of mine plan into a smaller number of larger open pits
  • Over 123,000 metres of drilling completed year-to-date at Val-d'Or East 
  • 6 drills active at the Val-d'Or East project – divided between the Pascalis and Courvan gold trends
  • 填充和擴展演習活動的結果繼續展示莫尼克礦牀和採礦計劃的增長和改進, 更新的資源莫尼克礦牀預期日期年終,為了.2023年第一季度帕斯卡利斯和庫爾萬的趨勢
  • 加密鑽探繼續加強資源,並返回重要的新交叉口 70.7米以上1.5克/噸Au,包括25.3米以上3.4克/噸Au, 40.2米以上1.2克/噸Au
  • 膨脹鑽進切斷新的截取品位高達2.6克/噸Au超過13.7米現有資源附近22.1米以上的1.3克/噸Au
  • 資源增長和轉換到目前為止支持礦山平面圖的簡化變成數量較少的較大露天礦坑
  • 今年到目前為止,Val-d‘Or East完成了超過12.3萬米的鑽井
  • 6次演習正在進行中在Val-d‘Or East項目-在帕斯卡利斯和庫爾萬黃金趨勢之間劃分

TORONTO, Sept. 07, 2022 (GLOBE NEWSWIRE) -- Probe Metals Inc. (TSX-V: PRB) (OTCQB: PROBF) ("Probe" or the "Company") is pleased to provide the fourth set of results from the 2022 drill program on its 100%-owned Val-d'Or East Monique property (the "Property") located near Val-d'Or, Quebec. Results from twenty-two (22) new holes demonstrate continued strike and depth expansion with significant gold intercepts along the Monique gold zones. The 2022 drill program aimed to convert, expand, and discover new gold resources within and surrounding the conceptual pits from the 2021 PEA report (see figure 1). Results from 176 holes drilled since the beginning of 2022 at Monique are still pending and will be released as they are received. Selected highlights from the current results are presented below. The Company is also pleased to provide an update on the continuing engineering and development activities on the Property.

多倫多,9月2022年7月7日(環球通訊社)--Probe Metals Inc.(多倫多證券交易所股票代碼:PRB) (OTCQB:PROBF) ("測頭“或”公司“)很高興在其100%擁有的Val-d‘Or East Monique地產(The”)上提供2022年鑽探計劃的第四組結果。屬性)位於魁北克省Val-d‘Or附近。二十二(22)個新鑽孔的結果表明,Monique金礦帶沿線繼續走向和深度擴張,截獲大量金礦。2022年鑽探計劃旨在轉換、擴大和發現2021年PEA報告中概念礦坑內和周圍的新金礦資源(見圖1)。自2022年初以來在Monique鑽探的176個孔的結果仍在等待中,將在收到結果後公佈。以下是當前結果的精選亮點。公司還高興地提供該礦產持續工程和開發活動的最新情況。

David Palmer, President and CEO of Probe, states: "The drilling results on Monique have steadily showed an improvement in all aspects of the deposit, and particularly with the following: the expansion drilling results show that this project has tremendous upside for growth based on the remarkably consistent assay results; the infill drilling results show we are converting more of our resource into higher confidence ounces, which acts to de-risk the resource and the project; and as we step out and expand the previous resource boundaries we are growing our pits and potentially reducing the overall number of pits, which will make a much more efficient, and attractive mining project.  Taken individually, the drill results have been great, taken together they have been exceptional and have been responsible for building size, improving confidence, de-risking and increasing value.  To begin to quantify this value we are initiating the next resource update for the project in October and hope to have new numbers for Monique before the end of the year, and for Pascalis and Courvan in the first quarter of 2023.  These will provide a very clear demonstration of the benefits of our drilling programs and will form the basis for our pre-feasibility study, which we expect in the second half of 2023.  These are exciting times for Val-d'Or East and the project has done nothing but improve with the work we have undertaken and we expect to see continued improvement as we advance the project further."

Probe首席執行官總裁兼首席執行官David Palmer表示:“Monique的鑽探結果穩步顯示出礦牀各方面的改善,尤其是在以下方面:擴展鑽探結果表明,基於非常一致的分析結果,該項目具有巨大的增長潛力;加密鑽探結果表明,我們正在將更多的資源轉換為更高置信度的盎司,這有助於降低資源和項目的風險;隨着我們逐步擴大以前的資源邊界,我們正在擴大礦坑,潛在地減少了礦坑的總體數量,這將使一個效率更高、更具吸引力的採礦項目變得更加高效。單獨來看,鑽探結果很好,綜合來看,它們非常出色,對擴大規模、增強信心、降低風險和增加價值負有責任。為了開始量化這一價值,我們正在10月份啟動該項目的下一次資源更新,希望在今年年底之前有新的Monique數字,並在2023年第一季度有Pascalis和Courvan的新數字。這些將非常清楚地展示我們鑽探計劃的好處,並將構成我們預可行性研究的基礎,我們預計將在2023年下半年進行預可行性研究。對於Val-d‘Or East來説,現在是令人興奮的時期,該項目除了隨着我們所做的工作而有所改善外,什麼都沒有做,我們預計隨着項目的進一步推進,我們將看到持續的改善。“

Infill drilling – Eleven (11) holes released today are from the resource conversion drilling program designed to test the continuity of A, J, G, I and Q zones inside the conceptual pits between surface to approximately 300 metres depth and one hole to test the G zone around 425 metres depth. All holes returned intercepts with gold grades above the 0.42 g/t Au cut-off grade used in the PEA report and confirmed the current block model with respect to grades and thicknesses. The 2022 infill drill program over the Monique gold zones has been successful, to date, in achieving an approximate 30 metres drill spacing over the mineralization in the PEA's conceptual pits and down to 500 metres within the proposed underground resource areas.

加密鑽井-今天發佈的11個孔來自資源轉換鑽井計劃,旨在測試地表至約300米深的概念性凹坑內A、J、G、I和Q區的連續性,以及一個孔以測試約425米深的G區。所有鑽孔返回的截獲金品位高於PEA報告中使用的0.42g/t Au截止品位,並確認了當前關於品位和厚度的區塊模型。到目前為止,Monique金礦帶上的2022年加密鑽探計劃已經成功地在PEA概念性礦坑的礦化上實現了大約30米的鑽探間距,並在擬議的地下資源區內實現了500米的鑽探間距。

Expansion drilling - Eleven (11) holes are from the expansion drilling program designed to test the extension of the G, I, J, K, S and Q zones laterally and at depth. Six (6) of these expansion drilling holes intersected gold structures with grade times thickness above 15.0 g/t Au-metre.

膨脹鑽進-十一(11)個孔來自擴展鑽井計劃,旨在測試G、I、J、K、S和Q區的橫向和深度延伸。這些膨脹鑽孔中有6個與品位倍數大於15.0g/t Au-m的金礦構造相交。

Based on the drilling completed along the Monique Gold Trend since the PEA, the results demonstrate a strong continuity of the sub-parallel to parallel gold zones over a volume of more than 2 kilometres long by 1 kilometre wide and locally up to 600 metres depth. The Monique Gold Trend zones are all open along strike and at depth.

基於自PEA以來沿着Monique Gold Trend完成的鑽探,結果表明,平行於平行金礦帶的次平行金礦帶具有很強的連續性,其體積超過2公里長,1公里寬,局部深度達600米。莫尼克黃金趨勢區沿着走向和深度都是開放的。

In addition to drilling activities, Probe is advancing rock mechanics, ground geotechnical, metallurgical and baseline studies on the project, and has initiated community and social engagement activities. Beginning this month, a first phase of geotechnical test holes aimed to characterize the overburden over the PEA's conceptual pits and under proposed infrastructure will commence. This phase will be completed this fall.

除鑽探活動外,Probe正在推進該項目的巖石力學、地面巖土、冶金和基線研究,併發起了社區和社會參與活動。從本月開始,第一階段的巖土測試洞將開始,旨在表徵PEA概念性坑洞和擬議基礎設施下的覆蓋層。這一階段將於今年秋天完成。

Selected drill results from holes MO-22-352 to 373 at the Monique Area drilling program are, as follows:

莫尼克地區鑽探計劃的MO-22-352至373孔的精選鑽探結果如下:

Hole Number From (m) To (m) Length (m) Gold (g/t) Zone / Resource
MO-22-354 56.5 70.2 13.7 2.6 I / Expansion
MO-22-355 140.1 147.3 7.2 1.9 I / Expansion
MO-22-356 250.9 272.8 21.9 0.7 S / Expansion
MO-22-356 455.5 477.6 22.1 1.3 J / Expansion
Including 462.2 466.8 4.6 4.0 J / Expansion
MO-22-358 294.3 312.0 17.7 1.4 Q / Infill
MO-22-358 330.0 334.0 4.0 4.6 J / Infill
MO-22-359 169.1 170.1 1.0 15.4 Q / Expansion
MO-22-359 265.5 336.2 70.7 1.5 J / Infill
Including 283.7 309.0 25.3 3.4 J / Infill
Including 285.7 286.7 1.0 32.7 J / Infill
Including 307.4 305.8 1.0 17.2 J / Infill
MO-22-360 315.4 339.8 24.4 0.9 Q / Expansion
MO-22-360 353.3 369.2 15.9 1.4 J / Infill
Including 360.0 364.2 4.2 3.5 J / Infill
MO-22-363 140.8 160.4 19.6 0.7 A / Infill
MO-22-366 475.1 515.3 40.2 1.2 G / Infill
Including 490.0 493.4 3.4 6.7 G / Infill
MO-22-372 356.0 398.0 24.0 1.0 G / Infill
MO-22-373 516.8 528.0 11.2 1.3 G / Expansion
孔數 發件人(M) 至(M) 長度(米) 黃金(克/噸) 區域/資源
Mo-22-354 56.5 70.2 13.7 2.6 I/擴展
Mo-22-355 140.1 147.3 7.2 1.9 I/擴展
Mo-22-356 250.9 272.8 21.9 0.7 S/Expansion
Mo-22-356 455.5 477.6 22.1 1.3 J/擴展
包括 462.2 466.8 4.6 4.0 J/擴展
Mo-22-358 294.3 312.0 17.7 1.4 Q/填充
Mo-22-358 330.0 334.0 4.0 4.6 J/填充
Mo-22-359 169.1 170.1 1.0 15.4 Q/擴展
Mo-22-359 265.5 336.2 70.7 1.5 J/填充
包括 283.7 309.0 25.3 3.4 J/填充
包括 285.7 286.7 1.0 32.7 J/填充
包括 307.4 305.8 1.0 17.2 J/填充
Mo-22-360 315.4 339.8 24.4 0.9 Q/擴展
Mo-22-360 353.3 369.2 15.9 1.4 J/填充
包括 360.0 364.2 4.2 3.5 J/填充
Mo-22-363 140.8 160.4 19.6 0.7 A/內嵌
Mo-22-366 475.1 515.3 40.2 1.2 G/填充
包括 490.0 493.4 3.4 6.7 G/填充
Mo-22-372 356.0 398.0 24.0 1.0 G/填充
Mo-22-373 516.8 528.0 11.2 1.3 G/擴展

(1) All the new analytical results reported in this release and in this table, are presented in core length and cut to 100 g/t Au when needed. True width is estimated between 65 to 95 % of core length. Only grade times thickness above 15.0 g/t Au * m is reported

(1)本新聞稿和此表中報告的所有新分析結果均以巖心長度表示,並在需要時切割為100克/噸Au。實際寬度估計在巖心長度的65%到95%之間。僅報告了等級乘厚度超過15.0g/t Au*m的情況

Figure 1: Surface Map – Monique Gold Trend new drilling

圖1:地面圖-Monique Gold Trend新鑽探

Probe also announces the appointment of Independent Trading Group ("ITG") to provide market making services in accordance with the policies of the TSX Venture Exchange ("TSXV"). Under the market making services agreement dated July 7, 2022 (the "Agreement"), ITG will trade securities of the Company on the TSXV and all other trading venues with the objective of maintaining a reasonable market and improving the liquidity of the Company's common shares.

Probe亦宣佈委任獨立交易集團(“ITG”)根據多倫多證券交易所創業板(“多倫多證券交易所”)的政策提供莊家服務。根據日期為2022年7月7日的莊家服務協議(“該協議”),ITG將在多倫多證券交易所及所有其他交易場所買賣本公司的證券,目的是維持合理的市場及改善本公司普通股的流動性。

The Company will pay ITG a monthly cash fee of C$5,000 for a minimum term of three months, which will automatically extend for successive one-month terms unless terminated by either party on thirty days' prior notice. ITG acts at arm's length to the Company and none of ITG nor its affiliates or associates has any interest directly or indirectly in the Company or its securities, or any right or intent to acquire such an interest. ITG will not receive shares or options as compensation. The capital used for market making will be provided by ITG. The services provided by ITS pursuant to the Agreement commenced on July 7, 2022.

本公司將向ITG支付每月5,000加元的現金費用,最短期限為三個月,除非任何一方提前30天通知終止,否則該費用將自動連續延長一個月。ITG與本公司保持一定距離,且ITG及其聯屬公司或聯營公司概無直接或間接於本公司或其證券中擁有任何權益,亦無任何權利或意圖收購該等權益。ITG將不會獲得股份或期權作為補償。用於做市的資金將由ITG提供。ITS根據該協議提供的服務於2022年7月7日開始。

About the Monique Property:
The Monique property is located 25 km east of Val-d'Or, in Quebec, and consists of 21 claims and one mining lease covering a total area of 5.5 square kilometres in Louvicourt township. The property hosts a current measured and indicated mineral resource of 13,619,000 tonnes at a grade of 1.54 g/t for 672,800 ounces of gold and inferred mineral resource of 11,733,000 tonnes at a grade of 1.78 g/t for 671,400 ounces of gold (source: Probe Metals NI 43-101 Technical Report Val-d'Or East Project – June 2021). The Property is part of the Company's Val-d'Or East Project, and the consolidated land package stands at 436 square kilometres. Val-d'Or East is situated in a politically stable and low-cost mining environment that hosts numerous active producers and mills.

關於Monique地產:
Monique地產位於魁北克省Val-d‘Or以東25公里處,由21項索賠和一項採礦租約組成,涉及Louvicourt鎮總面積5.5平方公里。該礦區目前測量和指示的礦產資源量為13,619,000噸,品位為1.54克/噸,黃金為672,800盎司,推斷礦產資源量為11,733,000噸,品位為1.78克/噸,黃金為671,400盎司(來源:Probe Metals NI 43-101 Technology Report Val-d‘Or East Project,2021年6月)。該物業是該公司Val-d‘Or East項目的一部分,合併後的土地套餐面積為436平方公里。Val-d‘Or East位於政治穩定、低成本的採礦環境中,擁有眾多活躍的生產商和鋼廠。

Geology
Gold mineralization on the Monique property is mainly associated with three deformation zones that cross the property with an orientation of 280° and a 75°- 80° dip to the north. Gold mineralization is defined by a network of quartz/carbonate/albite/±tourmaline veins and veinlets with disseminated pyrite in the altered wall rocks. A total of 16 parallel gold zones have been discovered on the property, to-date. Some mineralized zones have been defined from surface to a depth of 600 metres and vary in width from 1 metre to up to 100 metres. Mineralized structures extend laterally up to 1,500 metres.

地質學
莫尼克金礦牀上的金礦化主要與三條變形帶有關,這三條變形帶橫跨該礦體,方位為280°,北傾角為75°-80°。金礦化是由蝕變圍巖中含黃鐵礦的石英/碳酸鹽/鈉長石/±電氣石礦脈和細脈組成的網絡。到目前為止,在該地產上總共發現了16個平行的金礦帶。一些礦化帶的範圍從地表到深度為600米,寬度從1米到100米不等。礦化構造橫向延伸長達1500米。

Past Production
The Monique open pit mine began commercial production in 2013 and ceased production at the end of January 2015. A total of 0.58 Mt of mineralized material was extracted at a grade of 2.53 g/t Au, from the surface to 100 metres depth for a total of 45,694 ounces of gold.

過去的生產
莫尼克露天礦於2013年開始商業生產,並於2015年1月底停產。從地表到100米深處共提取了0.58公噸礦化物質,品位為2.53克/噸金,總共開採了45,694盎司黃金。

Qualified Person:
The scientific and technical content of this press release has been reviewed, prepared, and approved by Mr. Marco Gagnon, P.Geo, who is a "Qualified Person" within the meaning of NI 43-101, and Executive Vice-President and a director of Probe.

合格人員:
本新聞稿的科技內容已由P.Geo的Marco Gagnon先生審閲、準備並批准,他是NI 43-101所指的“合格人士”,常務副主任總裁和董事的一名探查人員。

Quality Control:
During the last drilling program, assay samples were taken from the NQ core by sawing the drill core in half, with one-half sent to a certified commercial laboratory and the other half retained for future reference. A strict QA/QC program was applied to all samples, which includes insertion of mineralized standards and blank samples for each batch of 20 samples. The gold analyses were completed by fire-assays with an atomic absorption finish on 50 grams of materials. Repeats were carried out by fire-assay followed by gravimetric testing on each sample containing 3.0 g/t gold or more. Total gold analyses (Metallic Sieve) were carried out on the samples which presented a great variation of their gold contents or the presence of visible gold.

質量控制:
在最後一次鑽探程序中,通過將鑽芯鋸成兩半,從NQ巖芯中提取化驗樣本,一半送到經過認證的商業實驗室,另一半保留以備將來參考。所有樣品都採用了嚴格的QA/QC程序,包括每批20個樣品插入礦化標準和空白樣品。金的分析是通過對50克材料進行原子吸收的火試金法完成的。對每個含金量為3.0g/t或更高的樣品進行重複性測定。對含金量變化較大或存在可見金的樣品進行了總金分析(金屬篩)。

About Probe Metals:

關於Probe Metals:

Probe Metals Inc. is a leading Canadian gold exploration company focused on the acquisition, exploration and development of highly prospective gold properties. The Company is committed to discovering and developing high-quality gold projects, including its key asset the multimillion-ounce Val-d'Or East Gold Project, Québec. The Company is well-funded and controls a strategic land package of approximately 1,500-square-kilometres of exploration ground within some of the most prolific gold belts in Québec. The Company was formed as a result of the $526M sale of Probe Mines Limited to Goldcorp. Eldorado Gold Corporation currently owns approximately 10% of the Company.

Probe Metals Inc.是一家加拿大領先的黃金勘探公司,專注於收購、勘探和開發極具前景的金礦。該公司致力於發現和開發高質量的黃金項目,包括其關鍵資產魁北克省數百萬盎司的Val-d‘Or East黃金項目。該公司資金雄厚,控制着魁北克一些最多產金礦帶內約1,500平方公里的戰略土地組合。該公司是以5.26億美元將Probe Mines Limited出售給Goldcorp的結果。Eldorado Gold Corporation目前擁有該公司約10%的股份。

On behalf of Probe Metals Inc.,

代表Probe Metals Inc.,

Dr. David Palmer,
President & Chief Executive Officer

大衞·帕爾默醫生,
總裁&首席執行官

For further information:

有關更多信息,請訪問:

Please visit our website at or contact:

請訪問我們的網站或聯繫:

Seema Sindwani
Director of Investor Relations
info@probemetals.com
+1.416.777.9467

西馬·辛德瓦尼
投資者關係的董事
郵箱:Info@proproemetals.com
+1.416.777.9467

Forward-Looking Statements

前瞻性陳述

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This News Release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to: failure to identify mineral resources; failure to convert estimated mineral resources to reserves; the inability to complete a feasibility study which recommends a production decision; the preliminary nature of metallurgical test results; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; political risks; inability to fulfill the duty to accommodate First Nations and other indigenous peoples; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets, inflation, changes in exchange rates; fluctuations in commodity prices; delays in the development of projects; capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry; the results of the PEA being as announced, including future operating and capital costs, closure costs, AISC, the projected NPV, IRR, timelines, permit timelines and future Project opportunities; the ability to obtain the requisite permits, economics and associated returns of the Project as determined by the PEA, and all assumptions in the PEA regarding the technical viability of the Project, the market and future price of and demand for gold, the environmental impact of the Project, and the ongoing ability to work cooperatively with stakeholders, including the local levels of government; an inability to predict and counteract the effects of COVID-19 on the business of the Company, including but not limited to the effects of COVID-19 on the price of commodities, capital market conditions, restriction on labour and international travel and supply chains, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law

多倫多證券交易所風險交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。本新聞稿包括一些不包含歷史事實的“前瞻性陳述”。前瞻性陳述包括描述公司未來計劃、目標或目標的估計和陳述,包括公司或管理層預期將出現的情況或結果的表述。前瞻性陳述可以用“相信”、“預期”、“預期”、“估計”、“可能”、“將”或“計劃”等術語來識別。由於前瞻性陳述以假設為基礎,涉及未來的事件和情況,因此它們本身就具有內在的風險和不確定性。雖然這些陳述是基於公司目前掌握的信息,但公司不能保證實際結果將符合管理層的期望。前瞻性信息涉及的風險、不確定性和其他因素可能導致實際事件、結果、業績、前景和機會與此類前瞻性信息明示或暗示的情況大不相同。本新聞稿中的前瞻性信息包括但不限於公司的目標、目標或未來計劃、聲明、勘探結果、潛在礦化、礦產資源的估計、勘探和礦山開發計劃、開始運營的時間和對市場狀況的估計。可能導致實際結果與前瞻性信息大相徑庭的因素包括, 但不限於:未能查明礦產資源;未能將估計的礦產資源轉換為儲量;無法完成建議生產決定的可行性研究;冶金測試結果的初步性質;延遲獲得或未能獲得所需的政府、環境或其他項目批准;政治風險;無法履行容納原住民和其他土著人民的義務;與未來所需融資的可獲得性和成本有關的不確定因素;股票市場的變化、通貨膨脹、匯率變化;商品價格的波動;項目開發的延遲;資本和運營成本與礦產勘探和開發行業涉及的估計和其他風險有很大差異;公佈的PEA結果,包括未來運營和資本成本、關閉成本、AISC、預測的淨現值、內部收益率、時間表、許可時間表和未來的項目機會;獲得項目所需的許可證、經濟狀況和相關回報的能力,以及項目評估中關於項目技術可行性、黃金市場和未來價格及需求、項目對環境的影響以及持續與利益攸關方(包括地方政府)合作的能力的所有假設;無法預測和抵消新冠肺炎對公司業務的影響,包括但不限於新冠肺炎對商品價格、資本市場狀況、對勞動力和國際旅行以及供應鏈的影響, 以及該公司在SEDAR上提交的公開文件中列出的那些風險。儘管本公司認為在準備本新聞稿中的前瞻性信息時使用的假設和因素是合理的,但不應過度依賴這些信息,因為這些信息僅適用於本新聞稿發佈之日,並且不能保證此類事件將在披露的時間框架內發生或根本不會發生。除法律要求外,公司沒有任何更新或修改任何前瞻性信息的意圖或義務,無論是由於新信息、未來事件或其他原因


声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論