VANCOUVER, BC / ACCESSWIRE / March 17, 2022 / Blue Lagoon Resources Inc. (the "Company") (CSE:BLLG)(FSE:7BL)(OTCQB:BLAGF) is pleased to announce that recent assay results from the 2021 Phase Two drill program include new high-grade gold vein intercepts at the Company's 100% owned, year-round accessible, Dome Mountain Gold Project located a short 50-minute drive from Smithers, B.C.
Results from Holes DM-21-188, DM-21-188A and DM-21-200 continue to show that the Chance Structural Zone contains multiple high grade gold bearing veins thus confirming it as a highly prospective target for aggressive follow up drilling in 2022. These holes intercepted sulfide-bearing quartz carbonate veins with strong alteration disseminated sulfide zones in the footwall.
Highlights include:
- DM-21-200: 53.60 g/t Au and 55.46 g/t Ag over 0.55 meters within 33.08 g/t Au and 72.30 g/t Ag over 1.40 meters within 22.12 g/t Au and 47.95 g/t Ag over 2.14 meters.
- DM-21-188: 49.40 g/t Au and 56.90 g/t Ag over 0.32 meters followed 7.55 meters further down hole by 11.79 g/t Au and 61.50 g/t Ag over 0.47 meters.
"We are pleased to announce significant assay results once again for both gold and silver in new quartz carbonate veins drilled in the Chance Structural Zone. These sulfide-bearing veins are accompanied by intense alteration halos and bracketed by disseminated sulfide alteration which is unique to the Chance Structural Zone in the Dome Mountain Gold Project," stated Bill Cronk, Chief Geologist for Blue Lagoon Resources. "Sheeted quartz carbonate veins with up to 30 veins per meter, intense carbonate alteration and significant base metal mineralization associated with high grade gold assays support the Alkali Gold Model," he added.
"During our 2021 Phase 2 drill program, the Chance Structural Zone was drilled with 29 holes from five different pads over a northwest to southeast strike length of 500 meters. From our most northwest pad, the Chance Structural Zone extends at least another one kilometer to the northwest," said Rana Vig, President and CEO of Blue Lagoon Resources. "Every single pad drilled along this structural corridor in 2021 hit significant sulfide mineralization and we are very pleased to get such promising results back supporting our 2022 Chance Structural Zone exploration program, which is just one of several zones we are working on. This year will be very busy and exciting for us as we aggressively follow up on these results and more," he added.
TABLE 1
Hole | From (m) | To (m) | Length (m) | Au (g/t) | Ag (g/t) |
DM-21-188 | 26.98 | 27.30 | 0.32 | 49.40 | 56.87 |
34.85 | 35.32 | 0.47 | 11.79 | 61.50 |
includes | 34.85 | 35.04 | 0.19 | 25.90 | 100.77 |
86.00 | 87.00 | 1.00 | 4.03 | 8.20 |
89.00 | 90.25 | 1.25 | 3.96 | 2.31 |
93.30 | 96.50 | 3.20 | 1.37 | 2.47 |
DM-21-188A | 91.00 | 97.00 | 6.00 | 1.96 | 5.90 |
includes | 95.00 | 97.00 | 2.00 | 3.54 | 27.11 |
DM-21-200 | 60.03 | 60.45 | 0.42 | 16.80 | 202.00 |
77.50 | 79.64 | 2.14 | 22.12 | 47.95 |
includes | 77.50 | 78.90 | 1.40 | 33.08 | 72.31 |
includes | 77.50 | 78.00 | 0.50 | 28.00 | 94.65 |
and | 78.35 | 78.90 | 0.55 | 53.60 | 55.46 |
Hole DM-21-200 was drilled from a pad 150 meters west of the pad for holes DM-21-186 through DM-21-189. Hole 200 was drilled vertical (-85 degrees) and hit a sulfide rich quartz carbonate vein at a depth of 77.5 meters to 78.9 meters. This 1.40 meter interval contains 10% pyrite, trace to 2% arsenopyrite and grades 33.08 g/t Au and 72.3 g/t Ag. Elevated base metals, especially Zn and Pb, accompany high-grade gold veins.
Geological, geochemical and structural data as well as recent observations support Dome Mountain being a carbonate-base metal-gold deposit, a type of alkali gold deposit.
Figure 1
Further to the significance of the high-grade gold values in these sulfide bearing quartz-carbonate veins is the fact that disseminated sulfide mineralization was logged in surrounding volcaniclastic host rock for the first time on the property. It is common to see sulfides in narrow halos around quartz carbonate veins, but the Chance Structural Zone is so far unique in displaying 1-2% sulfides and anomalous gold values extending many meters from vein boundaries. These broad gold enriched halos generally run less than 5 g/t Au and do not display elevated base metal values typical of the high-grade gold (>10 g/t Au) veins.
This may represent an early phase of mineralization overprinted by the base metal-rich and high-grade gold vein event associated with late-stage tectonism along the Chance Structural Zone.
Assay results for 43 holes remain outstanding including 27 holes drilled during the 2021 Phase 2 program and 16 holes drilled during the current 2022 Phase 1 program.
QUALITY ASSURANCE AND CONTROL
Core selected for sampling was cut in half with a core saw or split with a hydraulic splitter with one half bagged for shipping. Strict chain of custody storing, and shipping protocol was maintained. All core preparation and analyses were completed by Bureau Veritas Minerals, located in Vancouver, BC. Core was crushed, split, and pulverized with 250 grams passing 200 mesh. Each sample was analyzed for gold by fire assay with ICP-MS finish (BVM code FA350) and for multi-elements by 4-acid digestion ICP with ES finish (BVM code MA250). Gold overlimits (>10 ppm Au) were analyzed with by gravimetric fire assay (BVM code FA550). Standards and Blanks were inserted by Company staff. The sampling program was undertaken by Company personnel by and under the direction of Lorie Farrell P.Geo.
The scientific and technical data contained in this news release was approved by William Cronk, P.Geo., a qualified person as defined in NI 43-101 and a consultant to the Company.
For further information, please contact:
Rana Vig
President and Chief Executive Officer
Telephone: 604-218-4766
Email: rana@ranavig.com
The CSE has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. Statement Regarding Forward-Looking Information: This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that Blue Lagoon Resources Inc. (the "Company") expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include results of exploration activities may not show quality and quantity necessary for further exploration and exploitation of minerals deposits, market prices, and continued availability of capital and financing, permitting and other approvals, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.
SOURCE: Blue Lagoon Resources Inc.
View source version on accesswire.com:
バンクーバー、卑詩省/ACCESSWIRE/2022年3月17日/ブルーラグーン資源会社()“会社(CSE:BLG)(証券取引所株式コード:7 BL)(場外取引市場コード:BLAGF)2021年の第2段階掘削計画の最新の分析結果は、ブリティッシュコロンビア州スミソニアンから車で50分で取得した、会社が100%所有し、年間到達可能なドーム頂山黄金プロジェクトで新たな高品位金鉱脈を取得することを含むことを喜んで発表した
DM-21-188、DM-21-188 AおよびDM-21-200孔の結果は、Chance構造帯が複数の高品位含有金鉱脈を含み、それによって2022年の積極的な後続掘削の極めて将来性のある目標であることが確認されたことを引き続き示した。これらの孔は下盤エッチングが強くなる硫化物含有石英炭酸塩脈と浸染状硫化物帯を遮断した。
ハイライトは:
- DM-21-200: 53.60 g/トン金および55.46 g/トン銀0.55メートル以上の範囲で33.08 g/トン、銀72.30 g/トン1.40メートル以上の範囲で22.12 g/トン金と47.95 g/トン銀2.14メートル以上です
- DM-21-188: 49.40 g/トン金および56.90 g/トン銀0.32メートルを超えた後、7.55メートル下に降ります11.79 g/トン金および61.50 g/トン銀0.47メートルを超える。
ブルーラグーン資源会社の首席地質学者であるBill Cronk氏は、“Chance構造帯で掘削された新しい石英炭酸塩脈における金と銀の重要な検査結果を再び発表することができて嬉しい。これらの硫黄含有鉱脈は強い腐食と酔いを伴い、浸染状硫化物エッチングに囲まれている。これはドーム頂山金鉱プロジェクトChance構造帯独自のものである”と述べた。“1メートル当たり30本もの鉱脈のシート状石英炭酸塩鉱脈,強い炭酸塩エッチング,高品位金分析に関する著しい卑金属鉱化は塩基性金鉱モデルを支持している”と補足した
藍潟湖資源公司のラナ·ヴィグ最高経営責任者兼最高経営責任者は、“2021年の2期掘削計画では、Chance構造区の北西から南東方向への走行長さは500メートルで、5つの異なるマットに29個の穴を開けた。私たちの最北西のマットから、Chance構造区は北西方向に少なくとも1キロ延びている”と述べた。彼は補足した:2021年にこの構造廊下に沿って掘削したすべてのマットは重大な硫化物鉱化に遭遇して、私たちはこのような有望な結果を得ることができて、私たちの2022年の機会構造区探査計画を支持することができて、これは私たちが努力しているいくつかの地域の一つにすぎない。今年は私たちにとって非常に忙しくてエキサイティングな年になるだろう。私たちはこれらの結果とより多くを積極的にフォローしているからだ。
表1
穴穴 | 送信者(M) | (M)まで | 長さ(メートル) | Au(g/トン) | 銀(g/トン) |
DM-21-188 | 26.98 | 27.30 | 0.32 | 49.40 | 56.87 |
34.85 | 35.32 | 0.47 | 11.79 | 61.50 |
含まれています | 34.85 | 35.04 | 0.19 | 25.90 | 100.77 |
86.00 | 87.00 | 1.00 | 4.03 | 8.20 |
89.00 | 90.25 | 1.25 | 3.96 | 2.31 |
93.30 | 96.50 | 3.20 | 1.37 | 2.47 |
DM-21-188 A | 91.00 | 97.00 | 6.00 | 1.96 | 5.90 |
含まれています | 95.00 | 97.00 | 2.00 | 3.54 | 27.11 |
DM-21-200 | 60.03 | 60.45 | 0.42 | 16.80 | 202.00 |
77.50 | 79.64 | 2.14 | 22.12 | 47.95 |
含まれています | 77.50 | 78.90 | 1.40 | 33.08 | 72.31 |
含まれています | 77.50 | 78.00 | 0.50 | 28.00 | 94.65 |
そして | 78.35 | 78.90 | 0.55 | 53.60 | 55.46 |
DM−21−200孔は、マットから西150 mまで掘削され、DM−21−186~DM−21−189孔に用いられる。200号孔は垂直(-85度)で掘削され、深さ77.5メートル~78.9メートルの硫化物に富む石英炭酸塩鉱脈に当たった。この1.40 mの地層には黄鉄鉱10%、微量毒砂2%、Au品位33.08 g/t、Ag品位72.3 g/tを含む。高品位金鉱脈は高卑金属、特に亜鉛と鉛を伴う。
地質、地球化学と構造資料及び最近の観測資料は円頂山が1つの炭酸塩基金に属する金鉱床であり、塩基性金鉱床に属することを支持した。
図1
また,これらの硫化物含有石英−炭酸塩鉱脈における高品位金値の意義は,この鉱体が初めて火山屑囲岩に浸染状硫化物鉱化を記録したことである。石英炭酸塩鉱脈周囲の狭窄ハローには硫化物がよく見られるが,Chance構造帯はこれまで唯一1−2%の硫化物と鉱脈境界から数メートル延びる異常金値を示してきた。これらの広い金酔いは通常金含有量は5 g/tAuより低く、高品位金脈(>10 g/tAu)の典型的な卑金属値を示さなかった。
これはChance構造帯晩期構造作用に関与する富卑金属と高品位金脈事件を重ね合わせた早期鉱化段階を表している可能性がある
43個の孔の検出結果は、2021年の第2段階計画中に掘削された27個の孔と、現在の2022年の第1段階計画中に掘削された16個の孔とを含む、依然として優れている。
品質保証と管理
選択的にサンプリングした岩芯は岩心のこぎりで半分に切ったり、油圧分割器で半分を袋詰めして輸送したりした。厳格な保管、貯蔵、そして輸送協定は維持された。すべての岩心準備と分析はブリティッシュコロンビア州バンクーバーにあるBureau Veritas Mineralsによって行われた。芯子は粉砕され、割れ、粉砕され、250 gは200目を通過する。各試料に対して金の火炎分析および4酸分解誘導結合プラズマスペクトル分析(BVMコードMA 250)を行った。金超過(>10 ppm Au)は重量法(BVMコードFA 550)を用いて分析した。基準と空白は会社の従業員によって挿入された。サンプリング計画は会社員がLorie Farrell P.Geoの指導の下で行った。
本プレスに含まれる科学と技術データはWilliam Cronk,P.Geoによって承認され,NI 43-101で定義された合格者であり,会社のコンサルタントでもある.
もっと情報が必要でしたら、ご連絡ください
ラナ·ヴィグ
社長と最高経営責任者
電話:604-218-4766
メール:raa@ranavigg.com
CSEは本ニュース原稿の十分性や正確性を審査しておらず,何の責任も負わない.展望的情報に関する陳述:本プレスリリースは、いくつかの“前向きな陳述”と見なすことができる陳述を含む。本プレスリリースでは,歴史的事実に関する陳述を除いて,Blue Lagoon Resources Inc.(以下,“会社”と略す)で予想される出来事や発展に関するすべての陳述が前向き陳述である.前向きな陳述は、歴史的事実の陳述ではないが、一般的には、常に“予想”、“計画”、“予想”、“信じる”、“意図”、“推定”、“プロジェクト”、“可能”および同様の表現、またはイベントまたは条件が“将”、“将”、“可能”、“可能”または“すべき”で発生するわけではない。会社はこれらの展望性陳述で表現された期待は合理的な仮定に基づいていると考えているが、これらの陳述は未来の業績を保証することはできず、実際の結果は展望性陳述中の結果と大きく異なる可能性がある。実際の結果と展望性表現中の結果と大きく異なる要素を招く可能性がある要素は、探査活動の結果が、さらなる探査と鉱蔵採掘に必要な品質と数量、市場価格、資本と融資の持続可能性、許可およびその他の承認、ならびに一般経済、市場または商業条件を示していない可能性がある。投資家は、どのような陳述も未来の業績の保証ではなく、実際の結果或いは発展は展望性陳述中の予測と大きく異なる可能性があることに注意してください。前向きな陳述は、会社経営陣が発表の日に述べた信念、見積もり、意見に基づいている。適用される証券法には別の規定があるほか, 経営陣の信念、見積もり又は意見又はその他の要因が変化した場合、会社はこれらの前向き陳述を更新する義務を負わない。
資料源:ブルーラグーン資源会社です。
Accesswire.comでソースコードバージョンを表示する: