VANCOUVER, BC / ACCESSWIRE / January 30, 2023 / Aztec Minerals Corp. (AZT:TSX-V)(OTCQB:AZZTF), announces plans to resume drilling at the Contention open pit gold-silver target in the famous Tombstone Silver Mining District located in southeastern Arizona early this year. The planned 2,500m core drilling program is expected to be a continuation of the prior, very successful, 2020-21 Reverse Circulation ("RC") drill programs, and will be focused on expanding the oxide gold-silver (Au-Ag) mineralization in width and to depth. Every one of the 44 drill holes in 2020-21 programs intersected shallow oxidized Au-Ag mineralization over substantial widths, several drill holes encountered visible gold, and all drill holes bottomed in mineralization, indicating the main mineralized zones are still open to depth as well as laterally. Aztec holds a 75% JV interest in the Tombstone property which includes many of the original patented mining claims in the district. View: Tombstone Property Location Map
Aztec Minerals CEO Simon Dyakowski commented, "At a time of sustained resurgence in precious metals prices and investor sentiment, Aztec is well-positioned to drill expansion targets in the high-grade heart of the famous Tombstone Silver Mining District in Southeast Arizona. Core drilling will test an expansion of mineralization at depth and laterally in the Contention open pit and follow up on the impressive high grade, oxide, gold and silver intersections of our 2020-2021 shallow RC drilling campaigns. The core drilling program will add valuable data to our existing RC drillhole database as we advance the shallow gold-silver mineralized Contention zone toward a maiden 43-101 compliant resource estimate."
The planned drilling program was designed with data obtained from surveys and modelling completed over 2022, following the conclusion of Aztec's previous RC drilling program in late 2021. Aztec has recently completed an ortho-topo drone survey to construct detailed maps, surveyed all drill hole collars from 2020-21, sampled for Terraspec alteration analysis half of the North Contention pit, completed Terraspec analysis on all the 2020-21 RC chips, and advanced the construction of a wire-frame 3-D Leapfrog model of the historic, extensive, underground mine workings, with drilling, mineralization, geology, alteration, geophysics, and multi-element geochemistry.
View: Tombstone 2023 Core Drilling Plan
View: Tombstone Idealized 2023 Drill Plan Cross Section
The planned Tombstone core drilling program is expected to consist of 10 - 12 holes at approximately 225m depth as inclined step-outs along the 900m length of the Contention pit to both sides (East, West) and at depth, with a target of potentially expanding the volume of the known Au-Ag mineralization. The core drilling program is expected to commence in the first quarter of 2023 for a period of 60 days and is subject to available funds and Tombstone JV management committee approval. Planned drill core diameters are PQ, HQ and NQ to 225m, noting that multiple core diameters will be required to complete through the historic underground mine workings.
To date the review of exploration data has defined the following target types for exploration at Tombstone:
- Shallow, bulk tonnage, "heap leachable"-type mineralization typical of Tombstone, composed of mesothermal Au-Ag oxides associated with the enrichment of sediment hosted mineralization on favorable horizons and structures, and with crosscutting, mineralized Qfp dikes and sills, mesothermal veins and hydrothermal breccias. This is the target type of Aztec's exploration focus since 2019.
- Sub-water table (below ~200m depth) extensions of the typical Tombstone Au-Ag mineralization, composed mostly of secondary enrichment minerals and focused by the same horizon and structure types as the extensively mined shallow deposits above.
- Deeper, high grade, "Taylor"- style carbonate replacement silver-lead-zinc-copper-gold deposits (CRD) in the extensive carbonate section (~ 2 kms estimated thickness) below the Bisbee formation.
- The potential for a mineralized porphyry-type deposit as a source of the Tombstone mineralization.
Data obtained from the core drill holes is expected to supplement the previous, shallow RC drilling by providing extensive knowledge of geological relationships and testing at the depth of the water table and below the Contention system across its width and along its length. Notably, Aztec's previous drilling terminated above the water table where typically the enrichment of Ag occurs, and that the main host horizons of the Tombstone district are found at this depth in the Contention target.
Upon the completion of diamond drilling, Aztec plans additional work including:
- Examining multi-element results for correlative, spatial, and geologic relationships.
- Terraspec analysis of the drill core.
- Detailed mapping of the Contention Open Pit, accompanied with Terraspec.
- Update the drilling data into the Leapfrog model, and update known district drilling, geology (lithology, structural, alteration, mineralogy, mineralization age-dating), geophysics, geochemistry, and UG workings to identify mineralization trends to help target the shallow and deep-CRD drilling.
- Examine the possibility of using seismic geophysics for identifying the overthrusts, faults and folding in the carbonates at depth.
- Potential 43-101 compliant resource estimation
Tombstone Project Overview
The Tombstone project is located 100 kilometers (km) southeast of Tucson, Arizona and covers much of the historic Tombstone silver district. Tombstone is renowned for its high grade, oxidized, silver-gold-lead-zinc-copper mesothermal and CRD mineralization hosted in veins, mantos, pipes and disseminated orebodies that were mined in the late 1800's and early 1900's.
Host rocks to the mineralization were primarily the clastic sediments of the Cretaceous Bisbee Formation. Below 200 meters (m) in depth, the Bisbee is underlain by the same Paleozoic limestone formations that host the Taylor zinc-lead-silver deposit located 60 km southwest of Tombstone. Taylor was discovered by Arizona Mining in 2015 and they accepted a takeover bid from South32 Limited in 2018.
Although the historic silver mines at Tombstone were generally small, Aztec believes they could be related to much larger mesothermal and CRD orebodies below the old mines. Since 2017, Aztec has completed geological mapping, geochemical sampling and geophysical surveying to identify the most prospective areas for Au-Ag mineralization around and below the Contention open pit, and CRD zinc-lead-copper-silver-gold mineralization below the entire district.
The 2021 drill holes were collared along the western rim and inside of the north and central parts of the Contention Pit and intersected mineralization over a north-south length of 600 meters by over 150 m of east-west width and to maximum depths of 175 m. The 2020 drilling had an area of mineralization of 850 m long by an average of 75 m wide and to maximum depths of 200 m deep. The combined 2020 and 2021 drilled area now spans 900 m long by over 230 m wide and to maximum depths of 200 m, with Au-Ag mineralization still open in all directions and at depth.
The low sulfidation epithermal gold-silver mineralization observed to date is impressive, marked by hydrothermal breccias, quartz veining and silicification associated with quartz-feldspar porphyry dikes and moderate to strong potassic, argillic and advanced argillic alteration and hornfels within the host Bisbee sandstones and siltstones. Areas of intense hematite, goethite and manganese wad are extensive, associated with quartz-calcite veins and localized skarn alteration in limestones. Cerargyrite (silver chloride) is observed in fractures, often with fine-grained visible gold. Most Au-Ag mineralized zones intersected in the 2020 and 2021 drill programs are proximal to the historic underground mine workings.
Tombstone 2020-21 Drilling Highlights:
- TR21-22: 2.44 gpt Au and 66.56 gpt Ag (3.39 gpt AuEq) over 65.5m
- TR21-10: 1.39 gpt Au and 56.40 gpt Ag (2.20 gpt AuEq) over 96.0m
- TR21-03: 5.71 gpt Au and 40.54 gpt Ag (6.28 gpt AuEq) over 32.0m
- TR21-13: 1.80 gpt Au and 36.90 gpt Ag (2.33 gpt AuEq) over 70.1m
- TR21-17: 1.73 gpt Au and 56.20 gpt Ag (2.53 gpt AuEq) over 64.0m
- TR21-08: 2.09 gpt Au and 47.1 gpt Ag (2.76 gpt AuEq) over 39.6m
- TR21-18: 0.76 gpt Au and 20.61 gpt Ag (1.05 gpt AuEq) over 64.0m
- TR20-02: 0.94 gpt Au and 42.1 gpt Ag (1.60 gpt AuEq) over 77.7m
- TR20-03: 0.77 gpt Au and 25.2 gpt Ag (1.07 gpt AuEq) over 97.5m
Gold equivalents are calculated using a 80:1 silver:gold ratio in 2020 and a 70:1 silver:gold ratio in 2021.Reported lengths are apparent widths, not true widths. The Contention Au-Ag mineralization zones are generally west dipping at around 60-80 degrees, associated with the quartz-feldspar porphyry dikes. However, these dikes also extend as sills in shallow angles out from the Contention fault along fold noses in the Bisbee clastic sediments so the full range of mineralization dips vary from 20 to 80 degrees. True widths for the apparent mineralization intersection widths of the five holes approximately range from 50 to 100% of the apparent widths, with the norm for the mineralized true widths being 60 to 90% of the apparent widths.
Tombstone Project Highlights
- Well located property on patented (42) and unpatented (42) claims (434.4 hectares/1,073.4 acres), covers much of the historic Tombstone silver mining district, great infrastructure, local town, road access, full services, water, power
- Historic silver district produced 32 million oz silver from 1878-1939, in high grade, oxidized, silver-gold-lead-zinc-copper vein and CRD deposits, and small open pit heap leach production in late 1980's
- Drilling by Aztec in 2020-21 has demonstrated that the Contention Pit target has significant Au-Ag mineralization which is open in all directions
- Multiple other prospective targets in Cretaceous and Paleozoic rocks related to major NW and NNE trending structures hosting porphyritic intrusions crosscutting a possible caldera ring structure
- A very important target is a potential bulk-tonnage carbonate replacement deposit in Paleozoic limestones similar to the Taylor discovery (100+ million tonnes of 10% Zinc Equivalent) located 60 km southwest of Tombstone (mineralization hosted on adjacent and/or nearby properties is not necessarily indicative of the mineralization hosted on the Company's property) whose presence is suggested by historic deep drilling intercepts for CRD mineralization returned multiple intersections grading up to 32 gpt silver, 0.61% copper, 6.5% lead and 2.6% zinc over 7.2m core length
- Distinct magnetic and AMT anomalies confirm multiple target areas, Contention pit hosts dikes along strongest district structure, excellent potential for CRD deposits with similar geology to the "Taylor" deposit
- Aztec high-grade samples in Contention Pit, grade up to 3,178 gpt silver and 23.5 gpt gold, epithermal stockwork mineralization open along strike. Out of 94 samples collected from within the pit, silver ranges between <0.1 and 3,178 gpt (114.5 average) and gold ranges <0.005 and 23.5 gpt (1.60 gpt average)
- Historic shallow mining at Contention pit for heap leachable Au-Ag mineralization, historic drilling by USMX around the pit returned multiple intersections including 1.61 gpt Au, 91.2 gpt Ag over 44.2m (see the Company's news release dated September 18, 2018 "Aztec Minerals Acquires Late 1980's-Early 1990's Drilling and Trenching Data for the Tombstone Project, Arizona" for further disclosure on USMX drilling)
Allen David Heyl, B.Sc., CPG., VP Exploration, is the Qualified Person overseeing the Tombstone exploration program. Mr. Heyl reviewed and approved the technical disclosures in this news release
"Simon Dyakowski"
Simon Dyakowski, Chief Executive Officer
Aztec Minerals Corp.
About Aztec Minerals - Aztec is a mineral exploration company focused on two emerging discoveries in North America. The Cervantes project is an emerging porphyry gold-copper discovery in Sonora, Mexico. The Tombstone project is an emerging gold-silver discovery with high grade CRD silver-lead-zinc potential in southern Arizona. Aztec's shares trade on the TSX-V stock exchange (symbol AZT) and on the OTCQB (symbol AZZTF).
Contact Information - For more information, please contact:
Simon Dyakowski, President & CEO, Director
Tel: (604) 619-7469
Fax: (604) 685-9744
Email: simon@aztecminerals.com
Website:
Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.
Forward-Looking Statements:
Certain statements contained in this press release may constitute forward-looking statements under Canadian securities legislation. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "expects" or "it is expected", or variations of such words and phrases or statements that certain actions, events or results "will" occur. These forward-looking statements are subject to a number of risks and uncertainties. Actual results may differ materially from results contemplated by the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. When relying on forward-looking statements to make decisions, investors and others should carefully consider the foregoing factors and other uncertainties and should not place undue reliance on such forward-looking statements. The Company does not undertake to update any forward-looking statements, except as may be required by applicable securities laws.
SOURCE: Aztec Minerals Corp.
View source version on accesswire.com:
バンクーバー、BC/ACCESSWIRE/2023年1月30日/Aztec Minerals Corp.(AZT:TSX-V)(OTCQB:AZZTF)今年初めにアリゾナ州南東部にある有名な墓石銀鉱鉱区の競争露天金銀目標の掘削を再開する計画を発表した。計画中の2,500メートル岩心掘削計画は,これまで非常に成功していた2020−21年度の反循環(“RC”)掘削計画の継続となり,幅と深さで酸化金−銀(Au−Ag)の鉱化に専念する予定である2020-21年度計画の44個の掘削孔のうち、どれも浅部酸化の金銀鉱化と交差し、幅が大きいいくつかの掘削孔に見える金が発見され,すべての掘削孔が鉱化中に底を打っており,主な鉱化帯が依然として深部と横方向に開放されていることが示唆された。アズテック社は墓石鉱の75%の合弁会社の権益を持っており、その中にはこの地域の多くの原始的な特許採鉱主張が含まれている観点:墓石物件位置図
Aztec Minerals最高経営責任者のSimon Dyakowski氏は“貴金属価格と投資家の感情が回復し続けた時点で、Aztecはアリゾナ州南東部の有名な墓石銀鉱鉱区の高品位心臓地帯で拡張目標を掘削することができる有利な地位にある。岩心掘削計画は、深さと横方向の掘削拡張を競争し、2020-2021年の浅層RC掘削活動で印象的な高品位、酸化物、金、銀の交差点を追跡する。岩心掘削計画は既存のRC掘削データベースに価値のあるデータを増加させる。浅層金銀鉱化論争区を初の43-101基準に適合する資源量推定に進めるからだ”とコメントしている
計画中の掘削計画は2022年に完成した調査とモデリングで得られたデータに基づいて設計されており、これまでのアズテックのRC掘削計画は2021年末に終了した。アズテック社は最近正射地形無人機の測量を完成し、詳細な地図を構築し、2020-21年の間のすべての掘削岩領を調査し、北競争坑の半分の区域に対してTerraspec腐食分析サンプリングを行い、すべての2020-21 RCチップのTerraspec分析を完成し、そして歴史上広範な地下鉱山井巷の線枠三次元ジャンプモデルの構築を推進し、掘削、鉱化、地質、エッチング、地球物理と多元地球化学を含む
観点:墓石2023年岩心掘削計画
観点:墓石理想化2023年掘削計画横断面
計画中のTombstone岩心掘削計画は,競争坑の両側(東,西)900メートルの長さに沿った傾斜階段と深さとして,既知の金銀鉱化の体積を潜在的に拡大することを目標とした10−12個の深さ約225メートルの掘削を含む予定である。コア掘削計画は2023年第1四半期から60日間の予定で、資金とTombstone合弁会社管理委員会の承認を待たなければならない。計画のコア径はPQ,HQ,NQから225メートルであり,歴史の長い地下鉱山を完成させるためには複数のコア径が必要であることを指摘した
これまで、探査データの審査は墓石探査の以下の目標タイプを決定した
- “堆積”型浅層バルクトン数典型的な墓石鉱化は、堆積物の濃縮と関連する中温Au-Ag酸化物からなり、有利な層位と構造に存在し、そして横切、鉱化したQFP岩脈と岩床、中熱液脈と熱液角礫岩からなる。これは2019年以来のアズテック社の探査の重点の目標タイプだ。
- 地下水位(深さ約200メートル以下)典型的な墓石金銀鉱化の延長は、主に二次濃縮鉱物から構成され、上で広く採掘されている浅部鉱床と同じ層位と構造タイプを持っている。
- より深く高品位な“テイラー”式炭酸塩置換銀−鉛−亜鉛−銅−金鉱床(CRD)はビスビー群の下方に広い炭酸塩岩段(推定厚さ約2キロ)に位置する。
- 鉱化斑岩型の潜在力墓石鉱化の源となる鉱床。
岩心掘削から得られたデータは、豊富な地質関係知識を提供し、従来の浅層RC掘削を補完するために、地下水位深さとその幅および長さに沿った競合システムの下方でテストを行う予定である。注目すべきはアズテック以前の掘削は地下水位で終了し、通常銀の濃縮は地下水位以上で発生したしかし、ターゲットを争うこの深さで墓石地域の主な宿主層位が発見された。
ダイヤモンド掘削が完了した後、アズテック社は他の仕事を計画している
- 相関、空間と地質関係の多元素結果を検査した。
- コアのTerraspec分析。
- Terraspecと一緒に描かれた争い用露天鉱の詳細地図。
- 掘削データをLeapFrogモデルに更新し、既知の地区の掘削、地質(岩性、構造、腐食、鉱物学、鉱化年齢測定)、地球物理、地球化学とUG作業を更新し、鉱化傾向を確定し、浅層と深層CRD掘削の目標の決定を助ける。
- 地震地球物理法を用いて深層炭酸塩岩中の逆沖,断層としわを識別する可能性を検討した。
- 43-101規格に準拠する潜在的なリソース評価
墓石プロジェクトの概要
墓石項目はアリゾナ州ツーソン市の南東100キロに位置し、歴史ある墓石銀区の大部分を覆っている。墓石は高品位な酸化銀−金−鉛−亜鉛−銅中温鉱化とCRD鉱化で知られており,これらの鉱化は19世紀末と20世紀初頭に採掘された鉱脈,カマキリ,管,浸染鉱体に付与されている。
成鉱の賦鉱岩は主に白亜紀ビスビス組の砕屑堆積である。200メートル以下の深さでは,ビス比は同じ古生代石灰岩で覆われており,そこには墓石の南西60キロに位置するテイラー亜鉛鉛銀鉱床がある。テイラーは2015年にアリゾナ州鉱業会社に発見され、2018年にSouth 32 Limitedの買収契約を受けた.
墓石の歴史の長い銀鉱は一般的に小さいにもかかわらず、アズテックは古い鉱下のより大きな中温熱液とCRD鉱体と関係があるかもしれないと考えている。2017年以来、アズテックはすでに地質充填図、地球化学サンプリングと地球物理調査を完成し、露天鉱周囲と下方で最も金銀鉱化遠景を競争する地区、及び全区域以下のCRD亜鉛鉛銅銀金鉱化を確定した
2021年の掘削に沿って争奪坑の西縁と北部と中部の内側、南北長600メートル、東西幅150メートル以上、最大深さ175メートルで交差鉱化を形成する。2020年に掘削された鉱化区の長さは850メートル、平均幅は75メートル、最深は200メートル。2020年と2021年の共同掘削区域の現在のスパンは900メートルを超え、幅は230メートル、最大深さは200メートルで、金銀鉱化は依然として各方向と深さで開放されている
これまで観察されてきた低硫化浅成低温熱液金銀鉱化が印象的であり,そのマーカーは石英−長石斑岩岩脈と共生する熱液角礫岩,石英脈と珪化,寄主比スビ砂岩と粉砂岩中の中−強カリウム質,泥質と高級泥質侵食と角質岩である。赤鉄鉱,針鉄鉱とマンガン鉱が密集している地域は広く,石英方解石鉱脈や石灰岩中の局所的な珪カル岩エッチングに関与している。亀裂には珪銀鉱(塩化銀)が観察された通常は細粒に見える金を使いますそれは.2020年と2021年の掘削計画で交わった金銀鉱化帯の多くは歴史ある地下鉱山の近くに位置している。
墓石2020-21掘削ハイライト:
- TR 21−22:2.44 gpt Auおよび66.56 gpt Ag(3.39 Gpt AuEq)65.5メートルを超える
- TR 21−10:1.39 gpt Auと56.40 gpt Ag(2.20 Gpt AuEq)96.0 mを超える
- TR 21-03:5.71 gpt Auと40.54 gpt Ag(6.28 Gpt AuEq)32.0メートルを超える
- TR 21−13:1.80 gpt Auと36.90 gpt Ag(2.33 Gpt AuEq)70.1 mを超える
- TR 21-17:1.73 gpt Auと56.20 gpt Ag(2.53 Gpt AuEq)64.0 mを超える
- TR 21-08:2.09 gpt Auおよび47.1 gpt Ag(2.76 Gpt AuEq)39.6メートルを超える
- TR 21-18:0.76 gpt Auと20.61 gpt Ag(1.05 Gpt AuEq)64.0 mを超える
- TR 20-02:0.94 gpt Auと42.1 gpt Ag(1.60 Gpt AuEq)77.7万を超える
- TR 20−03:0.77 gpt Auと25.2 gpt Ag(1.07 Gpt AuEq)97.5メートルを超える
2020年の金当量は80:1、2021年の金当量は70:1である。報告されている長さは見かけの幅であり、実際の幅ではない。論争性金銀鉱化帯は一般的に60-80度程度で西に傾斜し、石英-長石斑岩脈に伴う。しかし,ビスビー屑堆積物では,これらの岩脈も論争断層からひだ鼻部に沿って浅い角で延びているため,成鉱傾斜角は20度から80度まで様々である。5つの孔の見かけ鉱化交差幅の真の幅は、見かけの幅の約50%~100%であり、鉱化真の幅の基準は、見かけの幅の60%~90%である
墓石計画はハイライトです
- 地理的位置が優れているホテル特許(42)と非特許(42)の主張(444.4 ha/1,073.4エーカー)については,歴史ある墓石銀鉱区の大部分,巨大なインフラ,現地町,道路通路,全面的なサービス,水,電気をカバーしている
- 歴史の長い銀色の街1878年から1939年まで、高品位、酸化銀-金-鉛-亜鉛-銅鉱脈とCRD鉱床で3200万オンスの白銀を生産し、80年代末に小型露天堆積浸漬を生産した
- 2020-21年度アズテック掘削競争坑標的区は明らかな金銀鉱化を有し、この鉱化は全方位的に開放されていることが証明された
- 複数の他の期待目標白亜紀と古生代岩石中のSは主要なNWやNNE向き構造に関係しており,これらの構造は横断可能な破火口環状構造の斑岩侵入体を担持している
- 非常に重要な目標です古生代石灰岩中の潜在的な大トン数炭酸塩置換鉱床であり、テイラーが発見した(1億トン以上の10%亜鉛当量)のように、Tombstone南西60キロに位置し(隣接および/または付近の財産上の鉱化は必ずしも会社の財産上の鉱化を表明するとは限らない)、歴史上深く掘削して得られたCRD鉱化は複数の交差点に戻り、7.2メートルの岩心長で品位は32 gpt銀、0.61%銅、6.5%鉛と2.6%亜鉛に達した
- 明らかな磁気異常とAMT異常多目標区を確定し、鉱床を奪い合い、最も強い区域構造に沿って岩脈を蓄積し、“テイラー”鉱床地質に似たCRD鉱床の良好な潜在力を持つ
- アズテック高級サンプル競合坑では,品位3178 gptに達する銀と23.5 gptの金が,浅成熱液メッシュ化に沿って開放されている。鉱山から採取した94個のサンプルのうち銀の範囲は
- 歴史の長い浅層採鉱金銀鉱化可能な競争坑では,USMXが坑周囲で行った歴史的掘削は1.61 gpt Au,91.2 gpt Agを含む44.2メートルを超える複数の交差点に戻った(社2018年9月18日のプレスリリース参照)アズテック鉱業は80年代末-90年代初頭アリゾナ州の墓石プロジェクトの掘削と掘削データを買収しましたUSMX掘削のさらなる開示について)
アラン·デヴィッド·ハイB.Sc CPG探査副社長墓石探査計画を監督する合格者ですハイアールさんは、本プレスリリースの技術的開示を検討し、承認しました
“サイモン·ダヤコフスキー”
サイモン·ダヤコフスキー最高経営責任者
アズテック鉱業会社
アズテック鉱業会社について-Aztecは、北米の2つの新興発見に集中する鉱物探査会社である。セバンティスプロジェクトはメキシコのソノラで新興の斑岩型金鉱-銅鉱発見である。墓石プロジェクトはアリゾナ州南部で新しく発見された高品位CRD銀鉛亜鉛の潜在力を持つ金銀鉱物である。アズテックの株はトロント証券取引所(コードAZT)と場外取引市場(コードAZZTF)で取引されている。
連絡情報-もっと情報が必要でしたら、ご連絡ください
サイモン·ディアコフスキー取締役CEO
電話:(604)619-7469
ファックス:(604)685-9744
メール:simon@aztecminals.com
ウェブサイト:
TSXVおよびその規制サービス提供者(この用語はTSXVのポリシーにおいて定義されている)は、本プレスリリースの十分性または正確性に責任を負わない。どの証券取引所、証券委員会、または他の規制機関も、本報告に記載されている情報を承認していないか、または承認していない。
前向きに述べた
カナダ証券法によると、本プレスリリースに含まれるいくつかの陳述は前向きな陳述を構成する可能性がある。一般に、前向き情報は、“予期される”または“予想される”、またはそのような語およびフレーズの変形、またはいくつかの行動、イベント、または結果が“起こる”という陳述のような前向き用語を使用することによって識別することができる。このような展望的な陳述は多くの危険と不確実な要素の影響を受ける。実際の結果は展望的陳述で予想された結果と大きく異なるかもしれない。実際の結果は展望的陳述の結果と大きく異なる要素をもたらす可能性がある。したがって、実際の事件は展望的陳述で予測されたものとは大きく異なるかもしれない。展望性陳述に依存して意思決定を行う時、投資家と他の人は上述の要素と他の不確定要素を慎重に考慮すべきであり、このような展望性陳述に過度に依存してはならない。適用された証券法が要求する可能性がある以外、会社はいかなる前向きな陳述も更新することを約束しない。
資料源:アズテック鉱業会社
Accesswire.comでソースコードバージョンを表示する: