VANCOUVER, BC / ACCESSWIRE / July 6, 2022 / Blue Lagoon Resources Inc. (the "Company") (CSE:BLLG); (FSE:7BL); (OTCQB:BLAGF) is pleased to announce significant mineralized intercepts from the last of the 2022 Phase One drill results on its all year-round and road accessible Dome Mountain Gold Project, located a short 50-minute drive from Smithers, British Columbia. Drill results include 124 g/t Au and 36.7 g/t Ag over 0.76 meters from the Argillite Vein in hole DM-22-233 and 31.67 g/t Au and 473 g/t Ag over 1.09 meters from the Boulder Vein in hole DM-22-229.
Drilling deep and on strike in the Boulder Vein encountered very significant mineralization which added over 200 m of strike length to the already deep intercepts 200 meters below the current 43-101 resource on the Boulder Vein System. Results include 31.67 g/t Au and 473.0 g/t Ag over 1.09 meters (including 86.20 g/t Au and 1280 g/t Ag over 0.39 meters) from DM-22-229 and 11.22 g/t Au and 15.4 g/t Ag over 0.94 meters and 6.99 g/t Au and 37.7 g/t Ag over 4.63 meters ( including 10.28 g/t Au and 37.7 g/t Ag over 1.88 meters) both from DM-22-231. True thicknesses of these intersections are estimated at 70% of the drill indicated length.
The 4.63 meter drill intercept (approximately 3.27 meter true thickness) in hole DM-22-231 is a thick intercept of the Boulder Vein that not only demonstrates that the Boulder Vein is robust at depth, it may in fact be swelling at depth.
Hole DM-22-233 intersected 124.4 g/t Au and 36.7 g/t Ag over 0.76 meters from the interpreted down-dip extension of the Argillite Vein. This intercept is 350 meters downdip of the current 43-101 resource. Insufficient structural data is available to determine true thickness. Table 1 summarizes the significant results from the Boulder Vein System drilling.
"Hole DM-22-229 provides a lot of confidence that mineralization on the Boulder Vein continues to depth", said Bill Cronk, Chief Geologist for Blue Lagoon Resources. "This hole was meant to step out along strike and target the Boulder Vein 200 meters along strike from the DM-20-139 intercept (17.69 g/t Au and 70.40 g/t Ag over 3.13 meters, see press release December 9, 2020). With this intercept we feel that drilling deep along strike will add significant value to the mineralized Boulder Vein System and, to the Dome Mountain Gold Project as a highly attractive regional gold development target," he added.
TABLE 1
Figure 1: Drill Hole Plan Map, Boulder Vein System
Figure 2: Cross Section, 653275E, Boulder Vein System. Note hatched zone in upper right denotes current resource. All stated intersection lengths are drill indicated lengths.
Further to the Boulder Vein System drilling, additional holes were drilled to the south into and around the historic 9800 Zone which features historic high grade surface exposure (see Figure 1)
Two holes were drilled into the area and both holes intersected high grade mineralization including 14.2 g/t Au, 92.9 g/t Ag and 5.4% Zn over 1.02 meters in hole DM-22-241. Table 2 highlights the significant results. This intercept is a new mineralized zone and will be followed up in the future. All intersection widths are drill indicated lengths as insufficient work has been done to determine orientations.
TABLE 2
Figure 3: Drill Hole Plan Map, 9800 Zone
Figure 4: Cross Section, 9800 Zone. All stated intersection lengths are drill indicated lengths.
QUALITY ASSURANCE AND CONTROL
Core selected for sampling was cut in half with a core saw or split with a hydraulic splitter with one half bagged for shipping. Strict chain of custody storing, and shipping protocol was maintained. All core preparation and analyses were completed by Activation Laboratories Ltd. located in Kamloops, BC. Core was crushed, split, and pulverized with 250 grams passing 200 mesh. Each sample was analyzed for gold by fire assay with ICP-OES finish (Act Labs Code 1A2-ICP) and for multi-elements by 4-acid total digestion ICP with OES finish.(Act Labs Code 1F2) Any gold overlimits (>30 ppm Au) were analyzed by gravimetricfire assay. Standards and blanks were inserted by Company staff. The sampling program was undertaken by Company personnel and under the direction of Ted Vanderwart, P.Geo.
The scientific and technical disclosure in this news release was approved by William Cronk, P.Geo, a Qualified Person as defined in NI 43-101 and a consultant to the Company.
For further information, please contact:
Rana Vig
President and Chief Executive Officer
Telephone: 604-218-4766
Email: rana@ranavig.com
The CSE has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.
Statement Regarding Forward-Looking Information: This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that Blue Lagoon Resources Inc. (the "Company") expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include results of exploration activities may not show quality and quantity necessary for further exploration or future exploitation of minerals deposits, volatility of gold and silver prices, and continued availability of capital and financing, permitting and other approvals, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.
SOURCE: Blue Lagoon Resources Inc.
View source version on accesswire.com:
バンクーバー,BC/ACCESSWIRE/2022年7月6日/ブルーラグーン資源会社()“会社(CSE:BLG);(FSE:7 BL);(OTCQB:BLAGF)は、ブリティッシュコロンビア州スミソニアンから車で50分の2022年の第1段階掘削の結果、DM-22-233孔からのArgillite鉱脈が0.76メートルを超えるDM-22-233孔のAuと36.7 g/t AgおよびDM-22-229孔からのBoulder鉱脈が1.09メートルを超えるDm-22-229孔のBoulder鉱脈が1.09メートルを超えるDome Mountain Gold項目で重要な鉱化切片が発見されたことを喜んで発表した。
Boulder鉱脈の掘削深さと走行は非常に重要な鉱化に遭遇しており,Boulder鉱脈システムでは現在43−101資源の200メートル以下ではすでに深い切片が200メートル以上の走行長さを増加させている。その結果、DM-22-229とDM-22-231のAu含有量はそれぞれ31.67 g/tと473.0 g/t(その中、Au含有量はそれぞれ86.20 g/tと1280 g/t)であり、銀含有量はそれぞれ15.4 g/tと6.99 g/tであった。これらの交差点の真の厚さは、ドリルが示す長さの70%と推定される。
DM−22−231井の4.63 mドリルピッチ(約3.27 m真の厚さ)は、Boulder鉱脈の厚さ切断であり、これは、Boulder鉱脈が深さにおいて堅固であるだけでなく、実際に深さで膨張する可能性があることを示している。
DM-22-233孔は、説明されたアギーリー岩脈から下方に延在する0.76 mで交差して124.4 g/t Auおよび36.7 g/t Agである。このタックルは現在の43-101資源より350メートル低い。真の厚さを決定するのに十分な構造データがない。表1にBoulder鉱脈システム掘削の重要な成果をまとめた。
ブルーラグーン資源会社の首席地質学者ビル·クランク氏は、“DM-22-229洞は大きな自信を提供し、巨石鉱脈上の鉱化は引き続き深くなると信じている”と述べた。彼は“この穴の目的は走行に沿って出て、DM-20-139切片から200メートルに沿ってBoulder鉱脈(3.13メートル、Au 17.69 g/tとAg 70.40 g/tを超え、2020年12月9日の新聞記事参照)を狙うことである。この切片を通じて、深い掘削に沿って鉱化されたBoulder脈システムに重大な価値を増加させ、ドーム頂山金鉱プロジェクトを極めて魅力的な地域的金鉱開発目標とすると考えられる”と補足した。
表1
図1:掘削平面図、Boulder鉱脈システム
図2:断面,653275 E,Boulder静脈系。注意:右上の斜線領域は、現在のリソースを表します。すべての所定の交叉点長はドリル指示長である.
Boulder鉱脈システム掘削の後,歴史の長い9800区とその周囲により多くの穴が掘削され,9800区は歴史的な高レベルの地表露出を有している(図1参照)
DM−22−241孔1.02 mに2つの孔が掘削され,両孔とも高品位鉱化と交差し,金14.2 g/t,銀92.9 g/t,亜鉛5.4%であった。表2に重要な成果を強調して示す.この切片は新しい鉱化帯であり,今後も追跡していく。方向を決定するのに十分な作業が行われていないため,すべての交差点幅はドリルが示す長さである.
表2
図3:9800エリア穿孔平面図
図4:9800領域の断面。すべての所定の交叉点長はドリル指示長である.
品質保証と管理
選択的にサンプリングした岩芯は岩心のこぎりで半分に切ったり、油圧分割器で半分を袋詰めして輸送したりした。厳格な保管、貯蔵、そして輸送協定は維持された。すべての核心準備と分析はブリティッシュコロンビア州カンループスにある活性化実験室有限会社によって完成された。芯子は粉砕され、割れ、粉砕され、250 gは200目を通過する。各サンプルは火炎試金分析金(Act Labs Code 1 A 2-ICP)を用い、4酸全分解で多元素(ACT Labs Code 1 F 2)を分析した。どの金の基準超過(>30 ppm Au)も重火法で分析した。基準と空白は会社員が記入します。サンプリング計画はテッド·ファンデルワルトの指導の下で会社員が行ったものですそうだな。
本プレスリリースの技術開示はウィリアム·クランクの承認を得たP.GeoNI 43-101に定義されている適格者および会社のコンサルタント。
もっと情報が必要でしたら、ご連絡ください
ラナ·ヴィグ
社長と最高経営責任者
電話:604-218-4766
メール:raa@ranavigg.com
CSEは本ニュース原稿の十分性や正確性を審査しておらず,何の責任も負わない.
展望的情報に関する陳述:本プレスリリースは、いくつかの“前向きな陳述”と見なすことができる陳述を含む。本プレスリリースでは,歴史的事実に関する陳述を除いて,Blue Lagoon Resources Inc.(以下,“会社”と略す)で予想される出来事や発展に関するすべての陳述が前向き陳述である.前向きな陳述は、歴史的事実の陳述ではないが、一般的には、常に“予想”、“計画”、“予想”、“信じる”、“意図”、“推定”、“プロジェクト”、“可能”および同様の表現、またはイベントまたは条件が“将”、“将”、“可能”、“可能”または“すべき”で発生するわけではない。会社はこれらの展望性陳述で表現された期待は合理的な仮定に基づいていると考えているが、これらの陳述は未来の業績を保証することはできず、実際の結果は展望性陳述中の結果と大きく異なる可能性がある。実際の結果と展望性表現が大きく異なる可能性がある要素は、探査活動の結果が、さらなる探査或いは未来の鉱蔵採掘に必要な品質と数量、金銀価格の変動、資本と融資の持続可能性、許可とその他の承認、及び一般経済、市場或いは商業状況を示していない可能性がある。投資家は、どのような陳述も未来の業績の保証ではなく、実際の結果或いは発展は展望性陳述中の予測と大きく異なる可能性があることに注意してください。前向きな陳述は、会社経営陣が発表の日に述べた信念、見積もり、意見に基づいている。適用される証券法の要件がない限り,会社は経営陣の信念,推定,または意見が変化した場合にこれらの前向き陳述を更新する義務はない, 他の要素も変えなければなりません
資料源:ブルーラグーン資源会社です。
Accesswire.comでソースコードバージョンを表示する: