share_log

Denison Reports Q3 Results

Denison Reports Q3 Results

丹尼森报告第三季度业绩
Benzinga Real-time News ·  2021/11/04 17:43

 Denison Mines Corp. ('Denison' or the 'Company') (TSX:DML) (NYSE:DNN) today filed its Condensed Interim Consolidated Financial Statements and Management's Discussion & Analysis ('MD&A') for the quarter ended September 30, 2021. Both documents will be available on the Company's website at www.denisonmines.com or on SEDAR (at www.sedar.com) and EDGAR (at www.sec.gov/edgar.shtml). The highlights provided below are derived from these documents and should be read in conjunction with them. All amounts in this release are in Canadian dollars unless otherwise stated. View PDF version

丹尼森矿业公司(Denison Mines Corp.)(“Denison”或“公司”)(多伦多证券交易所市场代码:DML)(纽约证券交易所市场代码:DNN)今天提交了截至2021年9月30日的季度的简明中期综合财务报表和管理层讨论与分析(“MD&A”)。这两份文件均可在公司网站www.denisonmines.com或SEDAR(www.sedar.com)和Edgar(www.sec.gov/edgar.shtml)上查阅。下面提供的重点内容源自这些文档,应结合这些文档阅读。除非另有说明,本新闻稿中的所有金额均以加元表示。查看PDF版本

David Cates, President and CEO of Denison commented"Our recent In-Situ Recovery ('ISR') field test results reflect several years of progress made towards systematically de-risking the use of the ISR mining method at the high-grade Phoenix deposit – culminating in the successful, and first of its kind, field test of a commercial-scale well pattern located in the expected first phase of the Phoenix orebody.  Our accomplishments in the field and the laboratory have significantly increased our confidence in the use of the ISR mining method and support our landmark decision to advance the planned Phoenix ISR operation to the Feasibility Study design stage.

丹尼森公司总裁兼首席执行官大卫·凯茨评论说, "我们最近的原地回收(“ISR”)现场测试结果反映了多年来在系统降低高品位菲尼克斯矿床使用ISR采矿方法风险方面取得的进展,最终在预期的菲尼克斯矿体一期内成功地进行了首次商业规模的现场测试。我们在现场和实验室取得的成就大大增强了我们对使用ISR开采方法的信心,并支持我们将计划中的菲尼克斯ISR运营推进到可行性研究设计阶段的里程碑式的决定。

With increased interest in the uranium market and a recent lift in both spot and long-term uranium prices, we are encouraged that future utility customers are returning to the market and looking at Denison's Wheeler River project as a potentially viable source of reliable and low-cost future supply.  Taken together with our effective 95% interest in Wheeler River and strong balance sheet, which, as of today, includes 2.5M lbs U3O8 of physical uranium holdings acquired at a price under US$30/lb U3O8, we believe Denison is well positioned to become an intermediate supplier of choice in the second half of the decade at a time when market fundamentals are predicted to be favourable as a result of growing demand for uranium and a relative shortage of advanced low-cost uranium development assets in stable jurisdictions.

随着人们对铀市场的兴趣增加,以及最近现货和长期铀价格的上涨,我们感到鼓舞的是,未来的公用事业客户正在重返市场,并将Denison的惠勒河(Wheeler River)项目视为未来可靠和低成本供应的潜在可行来源。加上我们于Wheeler River的95%权益及强劲的资产负债表(截至今天,包括以低于30美元/磅U3O8的价格收购的250万磅U3O8实物铀),我们相信Denison处于有利地位,将成为本十年后五年的中间供应商选择,目前市场基本面预计将因铀需求增长和稳定司法管辖区先进低成本铀开发资产的相对短缺而有利。

Our team is focused on advancing Phoenix in the coming months and years to realize on our vision of becoming the next new uranium producer in the Athabasca Basin region."

我们的团队正专注于在未来几个月和几年内推进菲尼克斯公司的发展,以实现我们成为阿萨巴斯卡盆地地区下一家新的铀生产商的愿景。“

HIGHLIGHTS 

高光

  • Successful completion of ISR field test activities at Phoenix 



    The initial results of the 2021 ISR field test program ('2021 ISR Field Test') completed at the Phoenix uranium deposit ('Phoenix') include (1) the achievement of commercial-scale production flow rates consistent with those assumed in the pre-feasibility study ('PFS') prepared for the Wheeler River Project ('Wheeler River' or the 'Project') in 2018; (2) the demonstration of hydraulic control of injected solution during the ion tracer test; and (3) the establishment of breakthrough times between injection and recovery wells, spaced 5 to 10 metres apart, that are consistent with the hydrogeological model prepared by Petrotek Corporation ('Petrotek') in 2020 demonstrating "proof of concept". In addition, the Company completed the clean-up phase following the tracer test, demonstrating the ability to remediate the commercial scale well ('CSW') test pattern, reducing tracer concentrations to as low as 4% of peak test levels, with eight days of remediation.


     
  • Advancement of Phoenix to feasibility study ('FS') stage and selection Wood PLC as independent lead author



    In September 2021, the Wheeler River Joint Venture ('WRJV') approved the initiation of an independent FS for the ISR mining operation proposed for Phoenix. The completion of the FS is a critical step in the progression of the project and is intended to advance de-risking efforts to the point where the Company and the WRJV will be able to make a definitive development decision. The Company also selected leading global consulting and engineering firm Wood PLC to lead and author the FS in accordance with Canadian Securities National Instrument 43-101 ('NI 43-101').


     
  • Initiated exploration drilling programs at Wheeler River and Moon Lake South



    In early September, Denison's exploration team initiated diamond drilling exploration programs at Wheeler River, and the Moon Lake South project. Approximately 6,500 m of diamond drilling is planned for Wheeler River, with regional exploration drilling expected to be focused on expanding mineralization encountered in 2020 at K West and M Zone, plus additional exploration drilling at Phoenix Zone A to test the extents of high-grade mineralization encountered in drill hole GWR-045. Moon Lake South is a Denison-operated joint venture with CanAlaska Uranium Ltd., in which Denison holds a 75% interest. Drilling planned for Moon Lake South is expected to consist of 2,400 metres focused on testing geophysical targets. 


     
  • Completed acquisition of 50% of JCU (Canada) Exploration Company, Limited ('JCU') for $20.5 million



    In August 2021, Denison completed the acquisition of 50% of JCU from UEX Corporation ('UEX') for cash consideration of $20.5 million, following UEX's acquisition of 100% of JCU from Overseas Uranium Resources Development Co., Ltd. for $41 million. JCU holds a portfolio of 12 uranium project joint venture interests in Canada, including a 10% interest in Wheeler River, a 30.099% interest in the Millennium project (Cameco Corporation 69.901%), a 33.8123% interest in the Kiggavik project (Orano Canada Inc. 66.1877%), and a 34.4508% interest in the Christie Lake project (UEX 65.5492%).


     
  • Completed the sale of shares and warrants of GoviEx Uranium Limited ('GoviEx) for proceeds of up to $41,600,000



    In October, the Company sold, by private agreement, 32,500,000 common shares of GoviEx, held by Denison for investment purposes, and 32,500,000 common share purchase warrants, entitling the holder of the warrant to acquire one additional common share of GoviEx owned by Denison at an exercise price of $0.80 for a term of up to 18 months. Denison received gross proceeds of $15,600,000 on the sale of the shares and warrants and continues to hold 32,644,000 common shares of GoviEx. If the GoviEx warrants are exercised in full, Denison will receive further gross proceeds of $26,000,000 and will transfer a further 32,500,000 GoviEx common shares to the warrant holders.


     
    • Recorded significant mark-to-market fair value gains on the Company's long-term investments in uranium 



      During the nine months ending September 30, 2021, the Company acquired 2,400,000 pounds of uranium at a weighted average cost of $36.59 (US$29.62) per pound U3O8 to be held as a long-term investment. Due to significant activity in the uranium spot market in the third quarter, the spot price appreciated from US$32.10 per pound U3O8 to US$43.00 per pound U3O8 resulting in mark-to-market gains for the three months ended September 30, 2021 of $36,138,000 on these uranium investments.  
  • 在凤凰城圆满完成ISR现场测试活动



    在菲尼克斯铀矿床(“菲尼克斯”)完成的2021年ISR现场试验项目(“2021年ISR现场试验”)的初步结果包括:(1)获得了与2018年惠勒河项目(“惠勒河”或“项目”)预可行性研究(“PFS”)中假定的一致的商业规模生产流速;(2)在离子示踪试验期间演示了注入溶液的水力控制;(3)确定注水井和采油井之间的突破时间,间隔5-10米,这与Petrotek公司(“Petrotek”)在2020年编制的水文地质模型一致,证明了“概念的证明”。此外,公司完成了示踪剂测试后的清理阶段,展示了修复商业规模井(“CSW”)测试模式的能力,将示踪剂浓度降低到峰值测试水平的4%,修复时间为8天。


  • 凤凰卫视进入可行性研究阶段并选择Wood PLC作为独立主要作者



    二零二一年九月,惠勒河合营公司(“WRJV”)批准就建议于菲尼克斯进行的ISR采矿作业设立独立FS。FS的建成是项目进展中的关键一步,旨在推动降低风险的努力,使公司和WRJV能够做出最终的开发决定。该公司还选择了全球领先的咨询和工程公司Wood PLC来领导和编写符合加拿大证券国家文书43-101(‘NI 43-101’)的金融服务。


  • 启动惠勒河和月亮湖南部勘探钻探计划



    9月初,丹尼森的勘探团队在惠勒河启动了钻石钻探勘探计划,并启动了月亮湖南部项目。惠勒河计划进行约6500米的钻石钻探,区域勘探钻探预计将侧重于扩大2020年在K West和M区遇到的矿化,以及在菲尼克斯A区进行的额外勘探钻探,以测试在GWR-045钻孔遇到的高品位矿化程度。南月湖是丹尼森与加拿大阿拉斯加铀业有限公司共同经营的合资企业,丹尼森持有该公司75%的股份。计划在月亮湖南部进行的钻探预计将包括2400米,重点是测试地球物理目标。


  • 完成以2,050万美元收购JCU(加拿大)勘探有限公司(“JCU”)50%的股权



    继UEX以4,100万美元从海外铀资源开发有限公司手中收购JCU 100%股权后,Denison于2021年8月完成以现金代价2,050万美元向UEX Corporation收购JCU 50%股权。JCU在加拿大拥有12个铀项目合资权益,包括惠勒河10%的权益,千禧项目30.099%的权益(Cameco Corporation 69.901%),基加维克项目33.8123%的权益(Orano Canada Inc.66.1877%),以及克里斯蒂湖项目34.4508%的权益(UEX 65.5492%)。


  • 完成出售GoviEx铀矿有限公司(“GoviEx”)的股份及认股权证,所得款项最高可达4,160万元



    10月份,本公司通过非公开协议出售了32,500,000股由Denison持有的GoviEx普通股用于投资目的,以及32,500,000股普通股认购权证,使认股权证持有人有权以0.8美元的行使价额外收购Denison拥有的GoviEx普通股,最长期限为18个月。丹尼森公司从出售股票和认股权证中获得了1560万美元的毛收入,并继续持有GoviEx的3264.4万股普通股。如果GoviEx认股权证全部行使,Denison将进一步获得26,000,000美元的总收益,并将进一步向认股权证持有人转让32,500,000股GoviEx普通股。


    • 公司对铀的长期投资录得按市值计价的重大公允价值收益



      在截至2021年9月30日的9个月中,该公司收购了240万磅铀,加权平均成本为每磅U3O8 36.59美元(29.62美元),作为长期投资持有。由于铀现货市场在第三季度的显著活跃,现货价格从每磅U3O8 32.10美元上涨到每磅U3O8 43.00美元,导致这些铀投资在截至2021年9月30日的三个月中按市值计算获得了3613.8万美元的收益。
声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发