share_log

Canterra Minerals Completes Acquisition of the Past Producing Buchans Mine, and Other Critical and Precious Metals Projects in Newfoundland and Completes $1.5 Million Financing

Canterra Minerals Completes Acquisition of the Past Producing Buchans Mine, and Other Critical and Precious Metals Projects in Newfoundland and Completes $1.5 Million Financing

Canterra Minerals完成了对过去生产的布坎斯矿以及纽芬兰其他关键和贵金属项目的收购,并完成了150万美元的融资
newsfile ·  2023/12/20 16:27

Vancouver, British Columbia--(Newsfile Corp. - December 20, 2023) - Canterra Minerals Corporation (TSXV: CTM) (OTCQB: CTMCF) ("Canterra" or the "Company") is pleased to announce, further to its news release issued on November 22, 2023, that it has completed the previously announced acquisition of five critical and precious metals projects in central Newfoundland (the "Properties"), adding 316 km2 to Canterra's property position.  The acquisition was completed with Buchans Resources Limited ("BRL"), an arms-length non-listed Reporting Issuer, and its subsidiary Buchans Minerals Corporation.

不列颠哥伦比亚省温哥华--(Newsfile Corp.,2023年12月20日)——坎特拉矿业公司(TSXV:CTM)(OTCQB:CTMCF)(“Canterra” 或 “公司”)在2023年11月22日发布的新闻稿后欣然宣布,它已经完成了先前宣布的对纽芬兰中部五个关键和贵金属项目(“地产”)的收购,并增加了3个距离坎特拉的物业位置16 km2。此次收购由独立的非上市报告发行人布坎斯资源有限公司(“BRL”)及其子公司布坎斯矿业公司完成。

In addition, the Company has closed its oversubscribed, previously announced non-brokered private placement financing (the "Offering") (see news releases dated November 29, 2023, December 12, 2023 and December 18, 2023) for gross proceeds of $1,538,598.95.

此外,公司已完成超额认购、先前宣布的非经纪私募融资(“发行”)(见2023年11月29日、2023年12月12日和2023年12月18日的新闻稿),总收益为1,538,598.95美元。

Canterra's total property position in the central Newfoundland critical minerals and gold belts is now approximately 684 km2, allowing for expansion of exploration efforts across these highly prospective districts. The Company will begin targeting work on the properties immediately with drilling scheduled on its Lemarchant Project anticipated in the first quarter of 2024.

Canterra目前在纽芬兰中部关键矿产和金矿带的总财产面积约为684平方公里,允许在这些极具前景的地区扩大勘探工作。该公司将立即开始对这些物业进行施工,预计将在2024年第一季度对其Lemarchant项目进行钻探。

Acquisition Highlights:

收购亮点:

  • Creates a district scale portfolio consisting of 7 resource stage critical minerals projects

  • Consolidated indicated mineral resource of 1.4 billion pounds contained zinc and inferred mineral resource of 317 million pounds contained zinc(1)(2)(3)(4)(5)(6)(7)

  • Consolidated indicated mineral resource includes 251 million pounds of contained copper and significant gold and silver credits(1)(2)(3)(4)(5)(6)(7)

  • Adds a large bulk tonnage mineral resource at the Buchans Mine (Lundberg deposit) (4) with substantial opportunity for new high-grade Zn-Cu VMS discoveries within the brownfields site

  • Synergistic acquisition that consolidates critical and precious metals properties (total size of 684 km2) in the Buchans Camp, Victoria Lake Camp and Valentine Lake Shear Zone

  • Canterra emerges with two drill ready projects both with prospective advanced stage high-grade Cu-Zn massive sulfide targets

  • Addition of Michael Power, currently a director of BRL, as Director of Canterra, an Engineer and Chartered Financial Analyst with over 50 years of experience in the mining industry

  • Canterra bolsters its exploration team with the addition of Paul Moore as VP Exploration and David Butler as Exploration Manager, each currently holding those roles at BRL, who combined have 60 years of experience in Eastern Canada

  • 创建由7个资源阶段关键矿产项目组成的地区规模投资组合

  • 14亿磅的合并指示矿产资源含有锌,推断的3.17亿磅矿产资源含有锌 (1) (2) (3) (4) (5) (6) (7)

  • 合并后的指示矿产资源包括2.51亿磅的含铜和大量的金银信贷 (1) (2) (3) (4) (5) (6) (7)

  • 在布坎斯矿(伦德伯格矿床)(4)增加了大量的散装矿产资源,为在棕地矿区发现新的高品位锌铜矿床提供了大量机会

  • 协同收购,整合了布坎斯营地、维多利亚湖营地和瓦伦丁湖希尔区的关键和贵金属财产(总面积为684平方公里)

  • Canterra 有两个准备钻探的项目,这两个项目都有潜在的高级铜锌块状硫化物目标

  • 现任BRL董事Michael Power加任Canterra董事,他是一名工程师兼特许金融分析师,在采矿业拥有50多年的经验

  • Canterra加强了勘探团队,增加了保罗·摩尔担任勘探副总裁和大卫·巴特勒担任勘探经理,他们目前均在BRL担任这些职务,他们加起来在加拿大东部拥有60年的经验

Mineral Resource Estimates at the Properties

物业的矿产资源估算

The Properties host significant polymetallic mineral resource estimates completed by previous operators over various effective dates. All mineral resource estimates have considerable opportunity for expansion.

这些物业拥有以前的运营商在不同的生效日期完成的大量多金属矿产资源估算。所有矿产资源估算都有很大的扩展机会。

Table 1 - Mineral Resource Estimates (see notes below for effective dates)

表 1-矿产资源估算(生效日期见下文注释)

Deposit

Category

Tonnes

Zn (%)

Cu (%)

Pb (%)

Au (g/t)

Ag (g/t)

Lundberg

Indicated

16,790,000

1.5

0.4

0.6

0.07

5.7

Inferred

380,000

2.0

0.4

1.0

0.31

22.4

Bobby's Pond

Indicated

1,100,000

4.6

0.9

0.4

0.20

16.6

Inferred

1,200,000

3.8

1.0

0.3

0.06

11.0

Daniel's Pond

Indicated

929,000

5.1

0.3

2.5

0.60

101.4

Inferred

332,000

4.6

0.3

2.1

0.53

85.9

Tulks Hill

Inferred

430,200

4.0

0.9

1.6

1.20

35.1

Contained

Zn (M lbs)

Cu (M lbs)

Pb (M lbs)

Au (K oz)

Ag (M oz)

Total Indicated

821

192

313

72

6.5

Total Inferred

151

32

32

11

1.5

存款

类别

锌 (%)

铜 (%)

铅 (%)

金 (g/t)

银 (g/t)

伦德伯格

已指明

16,790,000

1.5

0.4

0.6

0.07

5.7

推断

380,000

2.0

0.4

1.0

0.31

22.4

Bobby's Pond

已指明

1100,000

4.6

0.9

0.4

0.20

16.6

推断

1,200,000

3.8

1.0

0.3

0.06

11.0

丹尼尔的池塘

已指明

929,000

5.1

0.3

2.5

0.60

101.4

推断

332,000

4.6

0.3

2.1

0.53

85.9

Tulks Hill

推断

430,200

4.0

0.9

1.6

1.20

35.1

已包含

锌(M 磅)

铜(百万磅)

铅(百万磅)

Au(K oz)

银(百万盎司)

显示的总数

821

192

313

72

6.5

推断总数

151

32

32

11

1.5

Notes:

注意事项:

Mineral resources are not mineral reserves and do not have demonstrated economic viability. Figures rounded to reflect relative accuracy of the estimates.

矿产资源不是矿产储备,没有显示出经济可行性。数字四舍五入以反映估计值的相对准确性。

Lundberg Mineral Resource Estimate is based on $20 US/t NSR cutoff from the technical report entitled "NI 43-101 Technical Report and Mineral Resource Estimate on the Lundberg Deposit, Buchans Area, Newfoundland and Labrador, Canada", and dated April 15, 2019, was prepared by: Michael Cullen P. Geo., Matthew Harrington, P. Geo., and Shaun O'Connor, P. Geo. Figures have been rounded to reflect the relative accuracy of the estimates.

伦德伯格矿产资源估算基于2019年4月15日题为 “加拿大纽芬兰和拉布拉多省伦德伯格矿床NI 43-101技术报告和矿产资源估算” 的技术报告中的20美元/吨NSR截止值,该报告由迈克尔·卡伦·吉奥、P. Geo. 的马修·哈灵顿和P. Geo的肖恩·奥康纳编写。数字已四舍五入,以反映估计值的相对准确性。

Bobby's Pond Mineral Resource Estimate is based on a 1.0% CuEq cutoff from the technical report entitled "Technical report on the Bobby's Pond CU-Zn deposit, Newfoundland and Labrador, Canada" prepared for Mountain Lake Resources Inc., report date: July 31, 2008, as prepared by RPA.

Bobby's Pond矿产资源估算基于RPA为Mountain Lake Resources Inc.编写的题为 “加拿大纽芬兰和拉布拉多鲍比池塘铜锌矿床技术报告” 的技术报告中1.0%的cueQ截止值,报告日期:2008年7月31日。

The Daniel's Pond resource estimate is Based on a 2% Zn cutoff from the technical report entitled "Revised Technical Report on the Daniels Pond Deposit and Property Holdings of Royal Roads Corp. Red Indian Lake Area, Newfoundland, Canada" prepared for Royal Roads Corp., Effective Date: April 29th, 2008, as prepared by Peter C. Webster, B.Sc., P.Geo., P. James F. Barr, B.Sc., and Rafael Cavalcanti de Albuquerque, B.Sc. of Mercator Geological Services.

丹尼尔池塘资源估算基于为皇家公路公司编写的题为 “加拿大纽芬兰红印第安湖地区丹尼尔斯池塘矿床和财产持有量修订版技术报告” 的技术报告中的2%锌截止值,生效日期:2008年4月29日,该报告由理学学士、P.Geo. P.Sc. P.Geo.、P. James F. Barr和Rafael Cavalcanti de de Cavalcanti de 阿尔伯克基,墨卡托地质服务理学士学位。

The Tulks Hill resource estimate is Based on a 1.1% Cu Equivalent cutoff grade the technical report entitled "Technical Report on the Tulks Hill Cu-Zn Project, Newfoundland and Labrador, Canada" prepared for the Tulks Hill Joint Venture between Prominex Resources Corp. (Operator) and Buchans River Limited as prepared Hryar Agnerian M.Sc. P.Geo. of Scott Wilson Roscoe Postle Associates Inc. All figures have been rounded to reflect the relative accuracy of the estimates.

塔尔克斯山的资源估算基于1.1%的铜当量截止等级,由Hryar Agnerian M.Sc.为Prominex Resources Corp.(运营商)和布坎斯河有限公司的塔克斯山合资企业编写的题为 “加拿大纽芬兰和拉布拉多塔克斯山铜锌项目技术报告” 的技术报告Scott Wilson Roscoe Postle Associates Inc. 的 P.Geo. 所有数字均四舍五入,以反映估计值的相对准确性。

Chris Pennimpede, CEO & President of Canterra, commented, "Canterra aims to uncover mineral deposits in central Newfoundland. These assets strengthen land position within the central Newfoundland mining corridor, opening avenues for substantial discoveries within the belt. Our existing properties near the Teck's past producing Duck Pond Mine already has compelling VMS deposits and exploration prospects, complementing our established orogenic gold deposit opportunities. Echoing the industry adage that the best place to look for a mine is in the shadow of a headframe, Canterra will now be exploring at the brownfields site of the prolific Buchans Mine. The Buchans Project is ripe for a modern approach with significant exploration potential for high grade VMS mineralization. With a 684 km2 land position encompassing mineral rights across existing deposits, we anticipate being strongly positioned to unveil the next mineral discovery in central Newfoundland."

Canterra首席执行官兼总裁克里斯·彭辛贝勒评论说:“Canterra的目标是发现纽芬兰中部的矿床。这些资产巩固了纽芬兰中央采矿走廊内的土地地位,为地带内的重大发现开辟了途径。我们在泰克过去生产的 Duck Pond Mine 附近的现有物业已经拥有引人注目的VMS矿床和勘探前景,这补充了我们既有的造山金矿机会。Canterra呼应了业界的格言,即寻找矿山的最佳地点是在头盔的阴影下,现在将在多产的布坎斯矿的棕地上进行探索。Buchans项目采用现代方法的时机已经成熟,具有高品位VMS矿化的巨大勘探潜力。我们拥有684平方公里的土地面积,涵盖了现有矿床的矿产权,我们预计将处于有利地位,可以揭开纽芬兰中部的下一个矿产发现。”

The principal properties to be acquired are the Buchans Mine Property (hosting the Lundberg deposit), the Bobby's Pond Property (hosting the Bobby's Pond deposit), the Tulks Hill Property (hosting the Tulks Hill deposit), and the Daniel's Pond Property (hosting the Daniel's Pond deposit).

待收购的主要房产是布坎斯矿业(托管伦德伯格矿床)、鲍比池塘地产(托管鲍比池塘矿床)、塔克斯山地产(托管塔克斯山矿床)和丹尼尔池塘地产(托管丹尼尔池塘矿床)。

Buchans Mine Property

布坎斯矿山地产

The Buchans Mine Property encompasses 82.5 km2 of mineral claims and mining leases and is located adjacent to the town of Buchans. This property contains the past-producing Buchans Mine that was operated by ASARCO between 1928 and 1984 and is underlain by the volcano-sedimentary Buchans Group. The property also contains the Lundberg deposit, a VMS stockwork deposit that comprises a large, near-surface resource of stockwork sulphide mineralization. Lundberg's mineralization is located immediately beneath workings of the previously mined, high-grade Lucky Strike massive sulphide orebody from which ASARCO mined 5.6 million tonnes of ore averaging 18.4% Zn, 8.6% Pb, 1.6% Cu, 112 g/t Ag & 1.7 g/t Au, essentially pre-stripping a large portion of the Lundberg resource.

布坎斯矿业包括82.5平方公里的矿产索赔和采矿租约,毗邻布坎斯镇。该物业包含过去生产的布坎斯矿,该矿由ASARCO在1928年至1984年间运营,由火山沉积物布坎斯集团管理。该物业还包含Lundberg矿床,这是一种VMS库存矿床,包括大量的近地表硫化物矿化资源。伦德伯格的矿化位于先前开采的高品位Lucky Strike块状硫化物矿体的下方,ASARCO从中开采了560万吨矿石,平均锌含量为18.4%,铅含量为8.6%,铜含量为1.6%,铜含量为112 g/t,Ag为1.7g/t Au,基本上预先剥夺了伦德伯格资源的很大一部分。

The total ore mined over the life of the historic Buchans Mine is estimated to be 16 million tonnes at an average grade of 14.5% Zn, 7.6% Pb, 1.3% Cu, 1.37 g/t Au & 126 g/t Ag(4). The current Lundberg deposit resource estimate is shown in Table 2.

据估计,这座历史悠久的布坎斯矿在整个生命周期中开采的矿石总量为1,600万吨,平均品位为14.5%的锌、7.6%的铅、1.3%的铜、1.37克/吨的金和126克/吨的银(4)。目前的伦德伯格矿床资源估计值如表2所示。

Table 2: Lundberg Deposit Pit Constrained Mineral Resource Estimate (effective March 1, 2019)  

表 2:伦德伯格矿坑受限矿产资源估算(2019 年 3 月 1 日生效)

Category

Tonnes

Zn (%)

Cu (%)

Pb (%)

Ag (g/t)

Au (g/t)

ZnEq (%)

Indicated

16,790,000

1.53

0.42

0.64

5.7

0.07

4.46

Inferred

380,000

2.03

0.36

1.01

22.4

0.31

5.49

类别

锌 (%)

铜 (%)

铅 (%)

银 (g/t)

金 (g/t)

zneQ (%)

已指明

16,790,000

1.53

0.42

0.64

5.7

0.07

4.46

推断

380,000

2.03

0.36

1.01

22.4

0.31

5.49

Notes:

注意事项:

Based on $20 US/t NSR cutoff from the technical report entitled "NI 43-101 Technical Report and Mineral Resource Estimate on the Lundberg Deposit, Buchans Area, Newfoundland and Labrador, Canada", and dated April 15, 2019, was prepared by: Michael Cullen P. Geo., Matthew Harrington, P. Geo., and Shaun O'Connor, P. Geo. Figures have been rounded to reflect the relative accuracy of the estimates.

基于2019年4月15日题为 “加拿大纽芬兰和拉布拉多省布坎斯地区伦德伯格矿床NI 43-101技术报告和矿产资源估算” 的技术报告中的20美元/吨NSR截止值,由迈克尔·卡伦·吉奥、P. Geo. 的马修·哈灵顿和P. Geo的肖恩·奥康纳编写。数字已四舍五入,以反映估计值的相对准确性。

Mineral resources are not mineral reserves and do not have demonstrated economic viability.

矿产资源不是矿产储量,也没有显示出经济可行性。

The Buchans Mine Property lies on the north side of Beothuk Lake 35 km from Teck Resources' past producing Duck Pond Mine and Canterra's Lemarchant VMS deposit. This project has benefited from substantial relogging and digitization of over 70 years of paper data and hundreds of thousands of metres of core relogging. In addition, a recent collaboration agreement with Boliden AB, a global mining company, utilized 3D modelling of this data and reprocessing the vast existing geophysical database.  This data identified several drill targets for new high-grade massive sulfide deposits outside of the existing resource base. No drilling has yet been done to test these compelling new targets.

布坎斯矿业位于比图克湖的北侧,距离泰克资源公司过去生产的鸭塘矿和坎特拉的Lemarchant VMS矿床35公里。该项目受益于对70多年的纸质数据的大量重新记录和数字化以及数十万米的核心重新记录。此外,最近与全球矿业公司Boliden AB签订的合作协议利用了这些数据的三维建模并重新处理了庞大的现有地球物理数据库。这些数据确定了现有资源基础之外新的高品位块状硫化物矿床的几个钻探目标。尚未进行任何钻探来测试这些引人注目的新目标。

2018 exploration drilling at the underexplored Two-Level target intersected significant results in drillhole H-18-3524:

2018 年在未开发的两层目标处进行勘探钻探,与 H-18-3524 钻孔的显著结果相交:

  • 1.8 m of 5.57% Zn, 0.76% Cu, 3.15% Pb, 90.5 g/t Ag & 0.37 g/t Au

    • incl. 1.0 m of 8.70% Zn, 1.26% Cu, 4.87% Pb, 133.2 g/t Ag & 0.47 g/t Au

  • 1.8 m 含有 5.57% 的锌、0.76% 的铜、3.15% 的铅、90.5 g/t Ag 和 0.37 g/t Au

    • 包括 1.0 m 8.70% 的锌、1.26% 的铜、4.87% 的铅、133.2 g/t Ag 和 0.47 g/t Au

The success of drilling at Two-Level target confirms recent modelling and demonstrates the potential to discover both new high-grade in situ VMS mineralization and transported VMS mineralization that comprised 52% of the previous mining. The Two-Level mineralization also represents an opportunity to add higher grade resources to expand the adjacent Lundberg deposit.

两级目标钻探的成功证实了最近的建模,并表明了发现新的高品位原位VMS矿化和运输的VMS矿化的潜力,这些矿化占先前采矿量的52%。两层矿化也为增加更高品位的资源以扩建邻近的伦德伯格矿床提供了机会。

Terms of the Asset Purchase Agreement

资产购买协议的条款

The acquisition of the Properties (the "Acquisition") was a cashless transaction, with the consideration comprising (a) 24,910,000 common shares (the "Consideration Shares") of Canterra, representing an approximate 19.9% ownership interest at closing, and (b) 128,554,216 common share purchase warrants (the "Consideration Warrants") of Canterra exchangeable for common shares of Canterra within two years of closing (subject to extension in certain circumstances), for no additional consideration, upon (a) the transfer of the Properties that are considered material to the Company; (b) the approval by the TSX Venture Exchange (the "TSXV") and filing by the Company of an independent technical report on the historical Buchans mine and Lundberg deposit (the "Technical Report"); and (c) following subsequent actions of Buchans Minerals Corporation, the holder of the Consideration Warrants, and BRL, the distribution of up to all of the common shares to be received on exchange of the Consideration Warrants (the "Distributed Shares") to the shareholders of BRL (the "BRL Shareholders"), provided that: (i) such exchange and distribution will not result in a Change of Control of the Company or the creation of a new Control Person of the Company; (ii) in respect of the Distributed Shares, BRL directs the Company to issue such Distributed Shares directly to BRL Shareholders and shall not be a holder of such Distributed Shares at any time; and (iii) in the event that such exchange and distribution results in the creation of a new Insider, the BRL Shareholder shall have filed and obtained clearance of a personal information form or declaration, as applicable, with the TSXV. For greater certainty, a BRL Shareholder (i) individually, (ii) in conjunction with any of its Affiliates or Associates, or (iii) acting jointly or in concert with any other shareholder of the Company will not result in a Change of Control of the Company, the creation of a new Control Person of the Company or the creation of a new Insider (without filing and clearing a personal information or declaration, as applicable). BRL may exchange some of the Consideration Warrants for common shares of Canterra that it would hold, provided that BRL will not thereby become a Control Person of the Company or effect a Change of Control of the Company. For these purposes, "Affiliate", "Associate", "Change of Control" "Control Person" and "Insider" are as defined by the policies of the TSXV.

收购房产(“收购”)是一项无现金交易,对价包括(a)Canterra的24,910,000股普通股(“对价股”),收盘时约占19.9%的所有权,以及(b)坎特拉在收盘后两年内可兑换为坎特拉普通股的128,554,216份普通股购买权证(“对价认股权证”)(有待延期)某些情况),不另作考虑,前提是 (a) 将被认为是重要的财产转让给公司;(b)多伦多证券交易所风险交易所(“多伦多证券交易所”)批准并提交了关于历史布坎斯矿和伦德伯格矿床的独立技术报告(“技术报告”);以及(c)在对价认股权证持有人布坎斯矿业公司和BRL随后采取行动之后,分配在交换代价权证时收到的至多所有普通股(“已分配股份”)分配给 BRL 的股东(“BRL 股东”),前提是:(i) 此类交换和分配不会导致公司控制权变更或公司设立新的控制人;(ii) 对于分布式股份,BRL指示公司直接向BRL股东发行此类分布式股份,并且在任何时候都不得成为此类分布式股份的持有人;以及 (iii) 如果此类交换和分配导致产生了新的内部人士,则BRL股东应提交并获得许可与TSXV签订的个人信息表格或声明(如适用)。为了进一步确定起见,BRL股东(i)个人,(ii)与其任何关联公司或关联公司共同行动,或(iii)与公司任何其他股东共同行动或共同行动,不会导致公司控制权变更、公司新的控制人产生或产生新的内部人士(如果适用,无需提交和清除个人信息或声明)。BRL可以将部分对价认股权证兑换成其将持有的Canterra普通股,前提是BRL不会因此成为公司的控制人或改变公司的控制权。出于这些目的,“关联公司”、“关联公司”、“控制权变更”、“控制人” 和 “内部人士” 由TSXV的政策定义。

The Consideration Shares and the Consideration Warrants (and underlying common shares of Canterra) will be subject to a statutory hold period, expiring four months and one day from the closing, being April 20, 2024. Additionally, they will be subject to transfer restrictions for a period of 24 months post-closing. The common shares of Canterra issuable upon exchange of the Consideration Warrants will be subject to contractual holds with 1/3 being freely tradable on distribution (assuming expiry of statutory hold), 1/3 being freely tradable on the date which is three months from distribution and 1/3 being freely tradable on the date which is six months from distribution.

对价股和对价认股权证(以及Canterra的标的普通股)将有法定持有期,自收盘之日起四个月零一天到期,即2024年4月20日。此外,他们将在收盘后的24个月内受到转账限制。交换代价认股权证时可发行的Canterra普通股将受到合同持有的约束,其中1/3可在分配时自由交易(假设法定持有期满),1/3可在发行后三个月之日自由交易,1/3可在发行后六个月之日自由交易。

Planned Technical Work on the Properties

计划中的物业技术工作

The Company has provided an undertaking to the TSXV to file the Technical Report within 90 days of closing the Acquisition.

该公司已向多伦多证券交易所承诺在收购完成后的90天内提交技术报告。

The Company anticipates expenditures on the Properties in 2024 will consist of holding costs (estimated to be $230,100), work requirements ($51,000), and a Phase 1 Exploration Expenditures on the Buchans Mine Property. The Phase 1 Exploration Expenditures on the Buchans Mine Property are expected to be primarily desktop in nature. Field work will be limited to survey work (geophysical) or rock sampling (geochemical).  The Phase 1 Exploration Expenditures are estimated to be $100,000 and will focus on 3D modelling and drill targeting of all historical data at the Buchans Mine Property.  

该公司预计,2024年这些物业的支出将包括持有成本(估计为230,100美元)、工作需求(51,000美元)和布坎斯矿业的第一阶段勘探支出。预计布坎斯矿业的第一阶段勘探支出本质上将以桌面为主。实地工作将仅限于调查工作(地球物理)或岩石取样(地球化学)。第一阶段的勘探支出估计为100,000美元,将侧重于对布坎斯矿业的所有历史数据进行三维建模和钻探目标。

Financing Details

融资详情

Pursuant to the Offering, Canterra issued 23,670,753 shares comprised of critical mineral exploration tax credit ("CMETC") flow-through ("FT") common shares at a price of $0.065 per FT share for aggregate proceeds of $1,538,598.95.

根据本次发行,Canterra发行了23,670,753股股票,其中包括关键矿产勘探税收抵免(“CMETC”)流通(“FT”)普通股,价格为每股英尺0.065美元,总收益为1,538,598.95美元。

The gross proceeds of the Offering will be used to fund further exploration programs, including but not limited to drilling at the Boomerang and Lemarchant projects and expenditures on the Properties, which will qualify as "Canadian Exploration Expenses" and "flow-through critical mineral mining expenditures" as those terms are defined in the Income Tax Act (Canada), which will be renounced to the purchasers of the FT shares with an effective date no later than December 31, 2023.

本次发行的总收益将用于资助进一步的勘探计划,包括但不限于Boomerang和Lemarchant项目的钻探以及这些物业的支出,这些支出将符合《所得税法》(加拿大)中术语定义的 “加拿大勘探费用” 和 “流通关键矿产开采支出”,其生效日期不迟于12月31日,2023。

The securities issued pursuant to the Offering are subject to a four month and one day statutory hold period in Canada, expiring on April 21, 2024.

根据本次发行发行的证券在加拿大的法定持有期为四个月零一天,将于2024年4月21日到期。

In connection with the Offering, the Company paid finder's fees of $80,459.94 in cash and 1,260,945 warrants to arm's length persons. Each finder's warrant is exercisable at $0.065 until December 20, 2025.

与本次发行有关,该公司向独立人士支付了80,459.94美元的现金和1,260,945份认股权证。在2025年12月20日之前,每位发现者的认股权证可按0.065美元行使。

About Canterra Minerals

关于坎特拉矿业

Canterra Minerals is a diversified minerals exploration company with a focus on critical minerals (zinc and copper) in central Newfoundland. Canterra's critical metals projects include four deposits which host compliant resources with considerable exploration potential. The deposits are located in close proximity to Teck Resources' past producing Duck Pond mine and the past producing Buchans Mine. The deposits host a combined complaint resource of 4.1 million tonnes of Indicated Resources and 1.2 million tonnes of Inferred Resources. See the NI 43-101 Technical Report "Lemarchant and South Tally Project, Technical Report and Updated Mineral Resource Estimate" effective September 20, 2018. In addition, Canterra holds exploration stage gold properties that cover 80 km of strike length of the regional gold bearing Rogerson Lake structural corridor which hosts Marathon Gold Corporation's feasibility stage Valentine Lake Gold Project. The gold projects have been subject to four drilling campaigns, demonstrating many gold occurrences and warranting further exploration. In Alberta, Canada, Canterra also holds a 50% interest and is operator of the Buffalo Hills diamond project, with Star Diamond Corporation holding the remaining interest. The Buffalo Hills diamond project has been subject to considerable exploration expenditures, including a bulk sample, which has identified 38 kimberlites.

Canterra Minerals是一家多元化的矿产勘探公司,专注于纽芬兰中部的关键矿物(锌和铜)。Canterra的关键金属项目包括四个矿床,这些矿床拥有具有巨大勘探潜力的合规资源。这些矿床紧邻泰克资源公司过去生产鸭塘矿和过去生产布汉斯矿的矿山。这些矿床共包含410万吨指示资源和120万吨推断资源。参见 2018 年 9 月 20 日生效的 NI 43-101 技术报告《Lemarchant and South Tally 项目、技术报告和最新矿产资源估算》。此外,Canterra拥有勘探阶段的黄金财产,涵盖了该地区含金量罗杰森湖结构走廊的80公里走廊,该走廊是马拉松黄金公司可行性阶段的瓦伦丁湖黄金项目所在地。这些黄金项目已经进行了四次钻探,表明存在许多金矿,值得进一步勘探。在加拿大艾伯塔省,Canterra还持有50%的权益,是布法罗山钻石项目的运营商,剩余权益由Star Diamond Corporation持有。Buffalo Hills钻石项目花费了大量的勘探开支,包括已发现38个金伯利岩的批量样本。

The scientific and technical information contained in this news release was reviewed and approved by Christopher Pennimpede, P.Geo., President & CEO of Canterra. Mr. Pennimpede is a Qualified Person as defined by NI 43-101.

本新闻稿中包含的科学和技术信息已由Canterra总裁兼首席执行官P.Geo. Christopher Pennimbelder审查和批准。根据 NI 43-101 的定义,Pennimbeld 先生是合格人员。

ON BEHALF OF THE BOARD OF CANTERRA MINERALS CORPORATION

代表 CANTERRA MINERALS CORPORATION 董事会

Chris Pennimpede
President & CEO
Additional information about the Company is available at
For further information, please contact: +1 (604) 687-6644
Email: info@canterraminerals.com

克里斯·彭本德
总裁兼首席执行官
有关该公司的更多信息,请访问
欲了解更多信息,请联系:+1 (604) 687-6644
电子邮件:info@canterraminerals.com

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发