share_log

PureGold Files Independent Technical Report With Updated Mineral Resource Estimate for PureGold Mine

PureGold Files Independent Technical Report With Updated Mineral Resource Estimate for PureGold Mine

普雷戈尔德档案独立技术报告与普雷戈尔德矿最新矿产资源估算
GlobeNewswire ·  2022/09/26 06:35

VANCOUVER, British Columbia, Sept. 26, 2022 (GLOBE NEWSWIRE) -- Pure Gold Mining Inc. (TSX-V:PGM, LSE:PUR) ("PureGold" or the "Company"), is pleased to announce that following the release of an updated Mineral Resource Estimate ("MRE") on August 10th 2022, the Company has filed a National Instrument 43-101 Technical Report entitled "Independent NI 43-101 Technical Report and Updated Mineral Resource Estimate for the PureGold Mine, Canada", prepared by SRK Consulting, dated September 23rd, 2022, with an effective date of December 31st, 2021. The report is available on SEDAR at and has also been posted on the Company's website at

温哥华,不列颠哥伦比亚省,9月2022年2月26日(Global Newswire)--Pure Gold Mining Inc.(多伦多证券交易所股票代码:PGM,伦敦证券交易所代码:PUR)(“Puregold”或“公司”)高兴地宣布,继8月10日发布最新的矿产资源评估(“MRE”)后这是2022年,公司已经提交了由SRK咨询公司于9月23日编写的题为《加拿大普雷戈尔德矿独立NI 43-101技术报告和更新的矿产资源估计》的National Instrument 43-101技术报告研发,2022年,生效日期为12月31日ST,2021年。该报告可在SEDAR网站上查阅,也可在公司网站上发布,网址为

2022 Mineral Resource Estimate Highlights:

2022年矿产资源评估要点:

The PureGold Mine MRE includes1,2:

普雷戈尔德煤矿的MRE包括1,2:

1.65 million ounces of gold at 7.4 grams per tonne ("g/t") within 6.9 million tonnes in the Indicated Mineral Resource category, and

165万盎司黄金,每吨7.4克(“克/吨”),属于690万公吨的指示矿产资源类别,以及

0.37 million ounces of gold at 6.3 g/t within 1.8 million tonnes in the Inferred Mineral Resource category.

推断矿产资源类别中37.7万盎司黄金,6.3g/吨,180万吨内。

The updated MRE will form the basis of a new Pre-Feasibility Study (PFS) and updated Life of Mine plan, which is being led by SRK and expected to be released in the fourth quarter of 2022. This updated PFS will incorporate several ongoing trade-off studies and will identify the best value-maximizing operational path forward for the Company.

更新的MRE将构成新的预可行性研究(PFS)和更新的矿山寿命计划的基础,该计划由SRK牵头,预计将于2022年第四季度发布。这份最新的PFS将纳入几项正在进行的权衡研究,并将确定公司未来实现价值最大化的最佳运营路径。

  1. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the Mineral Resources estimated will be converted into Mineral Reserves. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. The Canadian Institute of Mining, Metallurgy and Petroleum definitions were followed for the classification of Indicated and Inferred Mineral Resources. The quantity and grade of reported Inferred Mineral Resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred Mineral Resources as an Indicated Mineral Resource and it is uncertain if further exploration will result in upgrading them to an Indicated Mineral Resource category. All figures have been rounded to reflect the relative precision of the estimates. Mineral Resources are reported as constrained with an underground Mining Stope Optimizer tool which generated optimized stope shapes using an assumed gold price of US$1800/ounce, a mining recovery of 95.0%, metallurgical recovery of 95.0%, and successive MSO runs at stope heights of 3, 6, and 12 metres. Mineral Resources are stated as undiluted tonnes and gold grade above a 3.38 g/t cutoff.
  2. For further information, see the technical report titled "Independent NI 43-101 Technical Report and Updated Mineral Resource Estimate for the PureGold Mine, Canada" with an effective date of December 31, 2022, and dated September 23, 2022, for further information, available at puregoldmining.ca or under the Company's Sedar profile at 
  1. 矿产资源不是矿产储量,没有证明的经济可行性。目前尚不能确定所估计的全部或任何部分矿产资源将被转换为矿产储量。矿产资源的估计可能会受到环境、许可、法律、所有权、税收、社会政治、营销或其他相关问题的重大影响。指示和推断矿产资源的分类遵循了加拿大采矿、冶金和石油学会的定义。本次评估中报告的推断矿产资源的数量和品位在性质上是不确定的,没有足够的勘探将这些推断矿产资源定义为指示矿产资源,也不确定进一步勘探是否会导致将其提升为指示矿产资源类别。所有数字都经过四舍五入,以反映估计的相对精确度。据报道,矿产资源受到地下采矿采场优化器工具的限制,该工具使用假设的金价为1800美元/盎司,采矿回收率为95.0%,冶金回收率为95.0%,并在3、6和12米的采场高度连续运行MSO,生成优化的采场形状。矿产资源量为未稀释吨,金品位高于3.38克/吨。
  2. 欲了解更多信息,请参阅题为《加拿大普雷戈尔德矿独立NI 43-101技术报告和最新矿产资源评估》的技术报告,生效日期为2022年12月31日,日期为2022年9月23日。Puregoldmining.ca或在公司的Sedar个人资料下,

Qualified Persons and NI 43-101 Disclosure

合格人员和NI 43-101披露

Terrence Smith, P.Eng. Chief Operating Officer for the Company, is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same.

特伦斯·史密斯,P.Eng公司首席运营官是国家仪器43-101所指的本新闻稿的指定合格人员,并已审查和核实本新闻稿中包含的技术信息是准确的,并批准对其进行书面披露。

About Pure Gold Mining Inc.

Pure Gold矿业公司简介

PureGold is a Canadian gold mining company, located in Red Lake, Ontario, Canada. The Company owns and operates the PureGold Mine, which began gold production in 2021 after the successful construction of an 800 tpd underground mine and processing facility. The PureGold Mine is centered on a forty-seven square kilometre property with significant discovery potential.

Puregold是一家加拿大金矿公司,位于加拿大安大略省红湖。该公司拥有并运营Puregold矿,该矿在成功建设日产量800吨的地下矿山和加工设施后,于2021年开始生产黄金。普雷戈尔德矿以一块47平方公里的土地为中心,具有巨大的发现潜力。

Additional information about the Company and its activities may be found on the Company's website at  and under the Company's profile at 

欲了解更多有关本公司及其活动的信息,请浏览本公司网站及本公司简介,网址为

ON BEHALF OF THE BOARD
"Mark O'Dea"           
Mark O'Dea, President & CEO
Investor inquiries:
Adrian O'Brien,
Director, IR & Communications
Tel: 604-809-6890
aobrien@puregoldmining.ca

我代表董事会
"马克·奥迪亚"
马克·奥迪亚,总裁&首席执行官
投资者咨询:
禤浩焯·奥布莱恩,
董事、IR和通信
电话:604-809-6890
邮箱:aobrien@puregoldmining.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所风险交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

All statements in this press release, other than statements of historical fact, are "forward-looking information" with respect to PureGold within the meaning of applicable securities laws, including, but not limited to statements with respect to those that address proposed timing of development plans for the PureGold Mine, including the proposed updated NI 43-101 Technical Report and timing and content of such Technical Report, including the life of mine plan; expectations regarding the effectiveness of new initiatives to improve stope access and result in increased throughput, improved grades and reduced costs in 2022; achievement of minimum targets with respect to ore production, average head grade and reduction in monthly operating costs by the end of 2022 compared to 2021; potential for extending the mine life of the PureGold Mine; the timing and results of the new Pre-Feasibility Study and updated Life of Mine Plan; the potential to convert resources to reserves; the transition of mining from the McVeigh Zone to the South Austin and Austin Zones; and potential for additional resources and expansion of known deposits and potential for making new discoveries and the focus of the Company in the coming months. Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "progress", "confirms", "continue", "planned", "expect", "expectations", "expand", "enhanced", "increasing", "optimize", "project", "predict", "potential", "supports", "targeting", "intends", "believe", "improved", "potential", and similar expressions, or describes a "goal", or variation , of such words and phrases or state that certain actions, events or results "may", "should", "confirms", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made including, among others, assumptions about future prices of gold and other metal prices, currency exchange rates and interest rates, favourable operating conditions, political stability, obtaining governmental approvals and financing on time, obtaining renewals for existing licences and permits and obtaining required licences and permits, labour stability, stability in market conditions, availability of equipment, accuracy of any mineral resources, successful resolution of disputes and anticipated costs and expenditures. Many assumptions are based on factors and events that are not within the control of PureGold and there is no assurance they will prove to be correct.

除有关历史事实的陈述外,本新闻稿中的所有陈述均为适用证券法所指的有关Puregold的“前瞻性信息”,包括但不限于涉及Puregold矿开发计划的拟议时间安排的陈述,包括拟议的最新NI 43-101技术报告和此类技术报告的时间和内容,包括矿山计划的寿命;有关改善采场通道和2022年产量增加、品位提高和成本降低的新举措的有效性的预期;与2021年相比,到2022年底实现矿石产量、平均头品位和每月运营成本的最低目标的可能性;延长Puregold矿采矿寿命的潜力;新的预可行性研究和更新的矿山寿命计划的时间和结果;将资源转换为储量的潜力;从McVeigh区到南奥斯汀和奥斯汀区的采矿过渡;以及额外资源的潜力和已知矿藏的扩大,以及未来几个月新发现和公司的重点。前瞻性信息常常,但并非总是,通过使用诸如“寻求”、“预期”、“计划”、“进展”、“确认”、“继续”、“计划”、“预期”、“预期”、“扩大”、“增强”、“增加”、“优化”、“项目”、“预测”、“潜在”、“支持”、“目标”、“打算”、“相信”、“改进”、“潜在”、“支持”、“目标”、“打算”、“相信”、“改进”、“潜在”等词语来识别。以及类似的表达,或描述这些词语和短语的“目标”或变体,或陈述某些行动、事件或结果“可能”、“应该”、“确认”、“可能”、“将”、“可能”或“将”被采取, 发生或被实现。前瞻性信息并不是对未来业绩的保证,基于陈述日管理层的一系列估计和假设,包括但不限于对未来黄金和其他金属价格、货币汇率和利率、有利的经营条件、政治稳定、按时获得政府批准和融资、获得现有牌照和许可证的续签和获得所需牌照和许可证、劳动力稳定性、市场条件的稳定性、设备可获得性、任何矿产资源的准确性、成功解决纠纷和预期成本与支出等的假设。许多假设是基于不在普雷戈尔德控制范围内的因素和事件,也不能保证它们会被证明是正确的。

Such forward-looking information, involves known and unknown risks, which may cause the actual results to be materially different from any future results expressed or implied by such forward-looking information, including, risks related to liquidity and the Company's ability to continue as a going concern; mine closure and rehabilitation; failure to achieve estimates or material increases in costs; history of net losses and negative operating cash flow, indebtedness; interpretation of results at the PureGold Mine complex, including reserve and resource estimates may prove to be incorrect; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; the costs and timing of the development of new deposits; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; the timing and success of exploration and development activities generally; delays in permitting; possible claims against the Company; the timing of future economic studies; labour disputes and other risks of the mining industry; delays in obtaining governmental approvals, financing or in the completion of exploration as well as those factors discussed in the Annual Information Form of the Company dated March 30, 2022 in the section entitled "Risk Factors", under PureGold's SEDAR profile at .

此类前瞻性信息涉及已知和未知风险,可能导致实际结果与此类前瞻性信息明示或暗示的任何未来结果大不相同,这些前瞻性信息包括:与流动资金和公司继续经营的能力有关的风险;矿山关闭和修复;成本未能达到估计或实质性增加;净亏损和负经营现金流、负债;对普雷戈尔德综合矿场结果的解释,包括储量和资源估计可能被证明是不正确的;随着计划的不断完善,项目参数的变化;当前的经济状况;商品的未来价格;品位或回收率可能的变化;开发新矿藏的成本和时机;设备或流程未能按预期运作;合同方未能履行职责;勘探和开发活动的总体时机和成功程度;许可的延误;可能对公司提出的索赔;未来经济研究的时机;劳资纠纷和采矿业的其他风险;在获得政府批准、融资或完成勘探方面的延误,以及在公司于2022年3月30日的年度信息表中“风险因素”一节讨论的那些因素,在Puregold的SEDAR简介下,.

Although PureGold has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. PureGold disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise unless required by law.

尽管普雷戈尔德试图确定可能导致实际行动、事件或结果与前瞻性信息中描述的大不相同的重要因素,但可能还有其他因素导致行动、事件或结果与预期、估计或预期的不同。不能保证这些信息将被证明是准确的,因为实际结果和未来事件可能与这类声明中预期的大不相同。普雷戈尔德公司没有任何更新或修改任何前瞻性信息的意图或义务,无论是由于新信息、未来事件或其他原因,除非法律要求。


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发