The company is located in Yuyao Binhai New Town in the Hangzhou Bay area, providing centralized heating for the only regional cogeneration enterprise in the region to the Sino-Italian Ningbo Ecological Park and surrounding electroplating and food parks. There are currently 2 75t/h (tons/hour) recirculating fluidized bed coal-fired boilers, 3 500t/d (tons/day) mechanical furnace row waste incinerators, 1 12 MW backpressure steam turbine generator set, 1 6 MW backpressure steam turbine generator set and 1 12 MW condensing generator set, with a design daily garbage disposal capacity of 1,500 tons and a total installed capacity of 30 megawatts. The company is a cogeneration enterprise using household waste and coal as the main raw materials. The main products are steam and electricity, providing customers with industrial steam and generating Internet access.
No Data