share_log

Benz Mining Corp. Announces High Impact Gold and Lithium Exploration Program Underway for 2022

Benz Mining Corp. Announces High Impact Gold and Lithium Exploration Program Underway for 2022

奔驰矿业公司宣布正在实施2022年的高影响力金和锂勘探计划
Newsfile Corp. ·  2022/01/28 08:35

HIGHLIGHTS

高光

  • Drilling underway at Eastmain testing both brownfield and greenfield targets

  • 25,000m of drilling planned for first 6 months (Q1 and Q2) of 2022

  • Follow up infill and extensional drilling of NW Zone from areas which previously returned:

    • 7.8m at 8.7g/t gold including 1.0m at 32.6g/t gold (EM21-146)

    • 5.5m at 6.1g/t gold including 1.5m at 19.2g/t gold (83CH029)

    • 6.0m at 3.6g/t gold including 1.0m at 10.2g/t gold (EM21-145)

    • 6.0 at 3.3g/t gold including 2.0m at 9.3g/t gold (EM17-126)

    • 3.0m at 5.2g/t gold including 1.0m at 15.0g/t gold (EM21-159)

  • Placer Lake electromagnetic conductors, spread out over 2km of strike modelled from 2021 winter survey, to be drilled in early February. Historical rock chips sample from the Placer Lake area returned:

    • 8.3 g/t gold, 2.7 % copper and 7.3 g/t silver

  • Drilling of DHEM conductors at Michel, modelled from the 2021 winter survey, to be undertaken this winter to follow up historical drill intercepts of:

    • 0.8m at 13.9g/t gold, 0.5m at 11.8g/t gold and 0.91m at 4.1g/t gold (EM10-13)

    • 1.0m at 8.2g/t gold, 2.2m at 1.4 g/t gold (EM10-12)

  • Drilling in the Julien area is underway on targets defined using IP chargeability and following up on historical results of:

    • 10.5m at 42.4 g/t gold and 1.5m at 6.0g/t gold (EM16-76)

    • 1.1m at 80.6 g/t gold (EM17-107)

    • 10.75m at 5.5 g/t gold (EM16-93)

    • 0.5m at 46.8 g/t gold (EM17-101)

  • Ground electromagnetics (TDEM - Crone Deep) over strong VTEM anomalies located south of the Eastmain Mine (Southern Anomalies) are underway.

  • Assays for lithium spodumene pegmatite samples taken last September from Ruby Hill West still pending, following up on historical samples of:

    • 4.72%Li2O, 1720 ppm Rb (>100ppm Ta, >500ppm Cs)

    • 2.15% Li2O, 990 ppm Rb (>100ppm Ta, >500ppm Cs)

    • 1.97% Li2O, 3660 ppm Rb (>100ppm Ta, >500ppm Cs)

    • 1.10% Li2O, 710 ppm Rb (>100ppm Ta, >500ppm Cs)

  • Assays for 62 drillholes from 2021 drilling still pending including 16 with logged visible gold

  • Eastmain正在进行钻探,测试棕地和绿地目标

  • 计划在2022年前6个月(第一季度和第二季度)钻探25000米

  • 从之前返还的地区跟进西北地区的加密和延伸钻井:

    • 7.8米,8.7g/吨黄金包括1000万,32.6克/吨黄金(EM21-146)

    • 5.5米,6.1克/吨黄金包括150万,19.2克/吨黄金(83CH029)

    • 6.0米,3.6g/吨黄金包括1000万,10.2g/吨黄金(EM21-145)

    • 6.0,黄金3.3g/t包括2.0米,9.3g/吨黄金(EM17-126)

    • 3.0米,5.2g/吨黄金包括1.0M,15.0g/吨黄金(EM21-159)

  • 根据2021年冬季调查的模型,Placer Lake电磁导体分布在2公里长的走向上,将于2月初钻探。来自Placer湖地区的历史岩屑样本被退回:

    • 8.3克/吨金,2.7%铜和7.3克/吨银

  • 以2021年冬季调查为模型,在Michel对DHEM导体进行钻探,将于今年冬天进行,以跟进历史上截获的以下项目:

    • 0.8米,13.9克/吨黄金,0.5米,11.8克/吨黄金0.91米,4.1克/吨黄金(EM10-13)

    • 1.0米,8.2克/吨黄金,2.2米,1.4克/吨黄金(EM10-12)

  • 目前正在Julien地区钻探使用知识产权可收费性定义的目标,并跟踪以下方面的历史结果:

    • 10.5米,42.4克/吨黄金1.5米,6.0g/吨黄金(EM16-76)

    • 1.1m,80.6克/吨黄金(EM17-107)

    • 10.75米,5.5克/吨黄金(EM16-93)

    • 0.5米,46.8克/吨黄金(EM17-101)

  • 位于Eastmain矿南部的强VTEM异常(南方异常)上的地面电磁(TDEM-Crone Deep)正在进行中。

  • 去年9月从鲁比山西部采集的锂锂辉石伟晶岩样本的分析仍在进行中,后续的历史样本包括:

    • 4.72%锂2O,1720ppm Rb(>100ppm Ta,>500ppm Cs)

    • 2.15%锂2O,990ppm Rb(>100ppm Ta,>500ppm Cs)

    • 1.97%锂2O,3660ppm Rb(>100ppm Ta,>500ppm Cs)

    • 1.10%锂2O,710ppm Rb(>100ppm Ta,>500ppm Cs)

  • 2021年钻探的62个钻孔的分析仍悬而未决,其中16个钻孔记录了可见的金

Toronto, Ontario--(Newsfile Corp. - January 28, 2022) - Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) (the Company or Benz) is pleased to announce that, following on from successfully proving the Company's electromagnetic (EM) strategy in 2021 (targeting high grade gold mineralisation via electro magnetic conductors) , Benz's Eastmain belt exploration program for 2022 has commenced, aiming to build upon the multiple discoveries made to date. Personnel and equipment have returned to the Eastmain camp and drilling has restarted.

安大略省多伦多-(Newsfile Corp.-2022年1月28日)奔驰矿业公司(多伦多证券交易所股票代码:BZ)(澳大利亚证券交易所代码:BNZ)(公司奔驰)很高兴地宣布,继成功证明本公司的电磁(埃姆随着2021年(通过电磁导体瞄准高品位金矿)战略的实施,奔驰2022年的东主带勘探计划已经开始,旨在以迄今取得的多项发现为基础。人员和设备已经返回Eastmain营地,钻探已经重新开始。

Drillholes for D and E Zones commenced before the festive season have now been completed with one more visible gold interval from E Zone intercepted in the first days of drilling.

D区和E区的钻孔在节日前开始,现在已经完成,在钻探的头几天又截获了E区的一个明显的金矿段。

Benz Mining CEO, Xavier Braud, commented:

奔驰矿业首席执行官泽维尔·布劳德(Xavier Braud)评论说:

"It is fantastic to kick off 2022 with more visible gold from E Zone. 2022 should be filled with exciting news - both from our recently commenced 2022 exploration program and the remaining results from the substantial work program we conducted last year.

“用E区更多可见的黄金来拉开2022年的序幕,这真是太棒了。2022年应该会充满令人振奋的消息-无论是我们最近开始的2022年勘探计划,还是我们去年进行的实质性工作计划的剩余结果。”

We are eagerly anticipating gold assay results from 62 of the holes drilled last year, including 16 where our geologists have seen visible gold. We are also awaiting results from lithium pegmatite rock chips sampling and surface sampling.

我们热切期待着去年钻探的62个孔的黄金化验结果,其中包括我们的地质学家发现可见黄金的16个孔。我们还在等待锂伟晶岩屑取样和表面取样的结果。

For 2022, we expect our exclusivity deal with MSA Laboratories for the use of their Val d'Or PhotonAssay laboratory to speed up assay turnaround. The laboratory will be commissioned later this quarter and we will be able to submit our core samples then.

2022年,我们预计我们与MSA实验室签订的使用Val d‘Or PhotonAssay实验室的独家协议将加快分析的周转。该实验室将于本季度晚些时候投入使用,届时我们将能够提交我们的核心样本。

During the winter months, when drill rig access is easier, we are stepping out to Michel and Placer Lake, two new targets where we have identified electromagnetic conductors. Notably, these are the same type of conductors which helped us discover NW, D and E Zones, as well as 2 new mineralised horizons and substantial extensions to A, B and C Zones. We will also be testing some of the IP chargeability anomalies coincident with excellent gold intersections and surface occurrences in the Julien, Suzanna and MEG areas. In parallel, we are also drilling the high-grade part of NW Zone which we discovered early last year, infilling on 50m x 50m last year's wide spaced intercepts (100m x 100m) and drilling potential extensions indicated by strong off-hole DHEM conductors.

在冬季的几个月里,当钻机更容易接近时,我们将前往米歇尔和普莱瑟湖,这是我们已经确定了电磁导体的两个新目标。值得注意的是,这些是帮助我们发现NW、D和E带的同一类型的导体,以及两个新的矿化层和对A、B和C带的实质性延伸。我们还将在Julien、Suzanna和Meg地区测试一些与黄金交叉口和地表产状一致的IP可收费性异常。与此同时,我们还在钻探我们去年年初发现的西北地区的高品位部分,在去年的大间距截距(100米x 100米)的基础上填充了50m x 50m,并通过坚固的井下DHEM导体显示了钻探潜力的延伸。

Importantly, all of the drilling we have planned for 2022 is away from the current resource; we have not yet started infill drilling all the new zones we discovered over the past 18 months. We are continuing our successful strategy of stepping out wide on new targets, potentially bringing additional mineralisation to the growing inventory.

重要的是,我们计划在2022年进行的所有钻探都远离目前的资源;我们还没有开始加密钻探过去18个月发现的所有新区。我们正在继续我们的成功战略,即广泛涉足新的目标,有可能为不断增长的库存带来更多的矿化。

We are still waiting for results from our rock chips sampling campaign at the Ruby Hill West lithium pegmatite. The presence of visible spodumene throughout is sufficient to indicate lithium mineralisation and Benz is preparing for helicopter supported drilling of the pegmatite toward the end of March (weather depending).

我们仍在等待我们在红宝石山西部锂伟晶岩进行的岩屑取样活动的结果。整个过程中可见锂辉石的存在足以指示锂矿化,奔驰正准备在3月底左右(视天气情况而定)对伟晶岩进行直升机辅助钻探。

We have a very busy year ahead with strong gold and lithium targets. The results from last year's field campaigns should also help us identify new targets this year, progressively unlocking the immense potential of 250km2 of completely underexplored greenstone belt."

由于黄金和锂的强劲目标,我们未来一年将非常忙碌。去年野战的结果也应该有助于我们今年确定新的目标,逐步释放250公里的巨大潜力2完全未被开发的绿岩带。“

2022 Exploration Campaign

2022年探索活动

Drilling is underway at Eastmain testing both brownfield and greenfield targets, with 25,000m of drilling planned for first 6 months of 2022.

Eastmain的钻探正在测试棕地和绿地目标,计划在2022年前6个月钻探25000米。

The focus of the Company's 2022 exploration campaign is to progressively unlock the immense potential of 250km2 of underexplored greenstone belt, building upon the multiple discoveries and the substantial increase in the mineralised footprint achieved by Benz to date (since commencing work at the Project in mid-2020).

该公司2022年勘探活动的重点是逐步释放250公里的巨大潜力2在多项发现和奔驰迄今(自2020年年中该项目开工以来)实现的矿化足迹大幅增加的基础上,开发了未被勘探的绿岩带。

As results are received for assays still pending from the substantial 2021 exploration work, further targets will be identified - focusing on both gold and lithium.

随着2021年大规模勘探工作仍悬而未决的分析结果出来,将确定更多的目标-重点放在金和锂上。

Initial high-priority exploration targets for 2022 are illustrated in Figure 1 and listed below:

2022年最初的高优先级勘探目标如图1所示,如下所示:

  1. Follow up infill and extensional drilling of NW Zone from areas which returned:
  1. 从返回区跟进西北地区的加密和延伸钻井:
  • 7.8m at 8.7g/t gold including 1.0m at 32.6g/t gold (EM21-146)

  • 5.5m at 6.1g/t gold including 1.5m at 19.2g/t gold (83CH029)

  • 6.0m at 3.6g/t gold including 1.0m at 10.2g/t gold (EM21-145)

  • 6.0 at 3.3g/t gold including 2.0m at 9.3g/t gold (EM17-126)

  • 3.0m at 5.2g/t gold including 1.0m at 15.0g/t gold (EM21-159)

  • 7.8米,8.7克/吨黄金,包括1.0米,32.6克/吨黄金(EM21-146)

  • 5.5米,6.1克/吨黄金,包括1.5米,19.2克/吨黄金(83CH029)

  • 6.0米,3.6克/吨黄金,包括1.0米,10.2克/吨黄金(EM21-145)

  • 6.0黄金价格为3.3克/吨,其中2.0米价格为9.3克/吨黄金(EM17-126)

  • 3.0米,5.2克/吨黄金,包括1.0米,15.0克/吨黄金(EM21-159)

  1. Drilling in Julien area is already underway, with targets identified using IP chargeability, following up on historical results of:
  1. 朱利安地区的钻探已经在进行中,使用知识产权收费确定了目标,跟进了以下方面的历史结果:
  • 10.5m at 42.4 g/t gold and 1.5m at 6 g/t gold (EM16-76)

  • 1.1m at 80.61 g/t gold (EM17-107)

  • 10.75m at 5.5 g/t gold (EM16-93)

  • 0.5m at 46.8 g/t gold (EM17-101)

  • 10.5米,42.4克/吨黄金;1.5米,6克/吨黄金(EM16-76)

  • 1.1m,80.61g/t黄金(EM17-107)

  • 10.75米,5.5克/吨黄金(EM16-93)

  • 0.5米,46.8克/吨黄金(EM17-101)

  1. Ground electromagnetics over the strong southern VTEM anomalies are underway. Magnetics at the Southern Anomalies show patterns of magnetite destruction very similar to the ones observed at the Eastmain deposit.
  2. Michel area drilling of DHEM conductors modelled from the 2021 winter survey to be conducted this winter, following up on historical drill intercept of:
  1. 强烈的南部VTEM异常上空的地面电磁活动正在进行中。南部异常处的磁学显示,磁铁矿的破坏模式与在Eastmain矿床观察到的非常相似。
  2. 米歇尔地区钻探DHEM导体的模型来自将于今年冬天进行的2021年冬季调查,后续是历史上截获的以下钻探:
  • 0.8m at 13.9g/t gold
  • 0.8米,13.9克/吨黄金
  1. Drilling of Placer Lake electromagnetic conductors spread out over 2km of strike modelled from 2021 winter survey. Historical rock chips sample from the Placer Lake area returned:
  1. 根据2021年冬季调查的模型,Placer Lake电磁导体的钻探延伸了2公里。来自Placer湖地区的历史岩屑样本被退回:
  • 8.3 g/t gold, 2.7 % copper and 7.3 g/t silver
  • 8.3克/吨金、2.7%铜和7.3克/吨银
  1. Drilling of Ruby Hill West lithium pegmatite outcrop planned for the end of March (weather permitting). Assays for samples taken last September from Ruby Hill West are still pending. Benz's work was following up on historical samples of:
  2. 4.72%Li2O, 1720 ppm Rb (>100ppm Ta, >500ppm Cs)

  1. 红宝石山西锂伟晶岩露头钻探计划于3月底(天气允许)进行。去年9月从鲁比山西部采集的样本的化验仍在进行中。奔驰的工作是对以下历史样本进行跟进:
  2. 4.72%锂2O,1720ppm Rb(>100ppm Ta,>500ppm Cs)

2.15% Li2O, 990 ppm Rb (>100ppm Ta, >500ppm Cs)

2.15%锂2O,990ppm Rb(>100ppm Ta,>500ppm Cs)

1.97% Li2O, 3660 ppm Rb (>100ppm Ta, >500ppm Cs)

1.97%锂2O,3660ppm Rb(>100ppm Ta,>500ppm Cs)

1.10% Li2O, 710 ppm Rb (>100ppm Ta, >500ppm Cs)

1.10%锂2O,710ppm Rb(>100ppm Ta,>500ppm Cs)

Figure 1: simplified geology of the Eastmain project area with electromagnetic conductors, significant drill collars, simplified geology and 2022 winter exploration areas

图1:Eastmain项目区的简化地质,包括电磁导体、重要钻具、简化地质和2022年冬季勘探区

Figure 2: Benz tenure over Upper Eastmain Greenstone Belt simplified geology.

图2:上Eastmain绿石带上奔驰的使用权简化了地质学。

Following the Omicron variant outbreak and the Quebec CNSST's recommendations, camp capacity has been slightly reduced to allow for further distancing. The Company does not anticipate this will impact operations.

在奥米克龙变种疫情爆发和魁北克国家科学技术委员会的建议之后,营地的容量已经略微减少,以便进一步疏远。该公司预计这不会影响运营。

This press release was prepared under supervision and approved by Dr. Danielle Giovenazzo, P.Geo, acting as Benz's qualified person under National Instrument 43-101.

本新闻稿是在监督下编写的,并得到了P.Geo的Danielle Giovenazzo博士的批准,他根据National Instrument 43-101担任奔驰的合格人员。

About Benz Mining Corp.

奔驰矿业公司简介

Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) brings together an experienced team of geoscientists and finance professionals with a focused strategy to unlock the immense mineral potential of the Upper Eastmain Greenstone Belt in Northern Quebec, which is prospective for gold, lithium, nickel, copper and other high-value minerals. Benz is earning a 100% interest in the former producing high grade Eastmain gold mine, Ruby Hill West and Ruby Hill East projects in Quebec and owns 100% of the Windy Mountain project.

奔驰矿业公司(多伦多证券交易所股票代码:BZ)(多伦多证券交易所股票代码:BNZ)汇聚了一支经验丰富的地球科学家和金融专业人士团队,他们的重点战略是发掘魁北克北部上Eastmain绿岩带巨大的矿产潜力,该带蕴藏着金、锂、镍、铜和其他高价值矿产。奔驰在前者生产的高品位Eastmain金矿、魁北克的Ruby Hill West和Ruby Hill East项目中获得100%的权益,并拥有Windy Mountain项目的100%股份。

The Eastmain Gold Project is situated within the Upper Eastmain Greenstone Belt in Quebec, Canada and currently hosts a NI 43-101 and JORC (2012) compliant resource of 376,000oz at 7.9g/t gold (Indicated: 236,500oz at 8.2g/t Au - Inferred: 139,300oz at 7.5g/t Au). The existing gold mineralization is associated with 15-20% semi-massive to massive pyrrhotite, pyrite and chalcopyrite making it amenable to detection by electromagnetics.

Eastmain金矿项目位于加拿大魁北克省的上Eastmain绿岩带内,目前拥有376,000盎司的符合NI 43-101和JORC(2012)的资源,黄金为7.9克/吨(指示:236,500盎司,8.2g/吨金-推断:139,300盎司,金7.5克/吨)。现有金矿化与15-20%的半块状至块状磁黄铁矿、黄铁矿和黄铜矿共生,易于电磁探测。

Multiple gold occurrences have been identified by previous explorers over a 10km long zone along strike from the Eastmain Mine with very limited but highly encouraging testing outside the existing resource area. Benz has subsequently identified over 180 DHEM conductors over a strike length of 6km which is open in all directions.

以前的勘探者已经在Eastmain矿沿线10公里长的区域内发现了多个金矿,在现有资源区以外进行了非常有限但非常令人鼓舞的测试。奔驰随后确定了180多根DHEM导体,其罢工长度为6公里,是四面八方开放的。

In 2021, Benz identified presence of visible spodumene in a pegmatite at the Ruby Hill West project, indicating lithium mineralisation which Benz intends to further explore in 2022.

2021年,奔驰在Ruby Hill West项目的伟晶岩中发现了可见锂辉石的存在,表明奔驰打算在2022年进一步勘探锂矿化。

This announcement has been approved for release by the Board of Directors of Benz Mining Corp.

本公告经奔驰矿业公司董事会批准发布。

For more information please contact:

如需更多信息,请联系:

Paul Fowler
Head of Corporate Development (Canada)
Benz Mining Corp.
Telephone: +1 416 356 8165
Email: info@benzmining.com

保罗·福勒
企业发展负责人(加拿大)
奔驰矿业公司(Benz Mining Corp.)
电话:+14163568165
电子邮件:info@enzmining.com

Xavier Braud
CEO, Head of Corporate Development (Aus)
Benz Mining Corp.
Telephone +61 8 6143 6702 email: info@benzmining.com

泽维尔·布劳德
首席执行官、企业发展主管(澳大利亚)
奔驰矿业公司(Benz Mining Corp.)
电话:+61 8 6143 6702电子邮件:info@enzmining.com

Forward-Looking Information: Certain statements contained in this news release may constitute "forward-looking information" as such term is used in applicable Canadian securities laws. Forward-looking information is based on plans, expectations and estimates of management at the date the information is provided and is subject to certain factors and assumptions, including, that the Company's financial condition and development plans do not change as a result of unforeseen events and that the Company obtains regulatory approval. Forward-looking information is subject to a variety of risks and uncertainties and other factors that could cause plans, estimates and actual results to vary materially from those projected in such forward-looking information. Factors that could cause the forward-looking information in this news release to change or to be inaccurate include, but are not limited to, the risk that any of the assumptions referred to prove not to be valid or reliable, that occurrences such as those referred to above are realized and result in delays, or cessation in planned work, that the Company's financial condition and development plans change, and delays in regulatory approval, as well as the other risks and uncertainties applicable to the Company as set forth in the Company's continuous disclosure filings filed under the Company's profile at . The Company undertakes no obligation to update these forward-looking statements, other than as required by applicable law.

前瞻性信息:本新闻稿中包含的某些陈述可能构成加拿大适用的证券法中使用的“前瞻性信息”。前瞻性信息以提供信息之日管理层的计划、预期和估计为基础,并受某些因素和假设的制约,包括公司的财务状况和发展计划不会因不可预见的事件而发生变化,以及公司获得监管部门的批准。前瞻性信息受各种风险、不确定因素和其他因素的影响,这些因素可能导致计划、估计和实际结果与这些前瞻性信息中预测的大不相同。可能导致本新闻稿中的前瞻性信息发生变化或不准确的因素包括但不限于:任何提及的假设被证明不是有效或可靠的风险,上述情况发生并导致公司财务状况和发展计划改变的延迟或停止,监管审批的延迟,以及公司在提交给公司的持续披露文件中陈述的其他风险和不确定因素,这些风险和不确定因素在公司提交给公司的持续披露文件中陈述,这些风险和不确定因素在公司提交给美国证券交易委员会(以下简称:公司)的文件中陈述了这些风险和不确定因素,这些风险和不确定因素包括但不限于:公司财务状况和发展计划发生变化或计划停止、公司财务状况和发展计划发生变化的风险,以及适用于公司的其他风险和不确定因素。除适用法律要求外,公司不承担更新这些前瞻性陈述的义务。

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ACCURACY OR ADEQUACY OF THIS RELEASE.

多伦多证券交易所创业板交易所及其监管服务提供商(该术语在多伦多证券交易所创业板交易所的政策中定义)均不对本新闻稿的准确性或充分性承担责任。

Competent Person's Statements: The information in this report that relates to Exploration Results is based on and fairly represents information and supporting information compiled by Mr Xavier Braud, who is a member of the Australian Institute of Geoscientists (AIG membership ID:6963). Mr Braud is a consultant to the Company and has sufficient experience in the style of mineralization and type of deposits under consideration and qualifies as a Competent Person as defined in the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Braud holds securities in Benz Mining Corp and consents to the inclusion of all technical statements based on his information in the form and context in which they appear. The Company confirms there are no material changes from when the results were first reported.

合资格人士声明:本报告中与勘探结果相关的信息以澳大利亚地球科学学会(AIG会员ID:6963)成员Xavier Braud先生汇编的信息和辅助信息为基础,并公平地代表了这些信息和辅助信息。Braud先生是本公司的顾问,在所考虑的矿化类型和类型方面拥有足够的经验,符合2012年版“澳大利亚勘探结果、矿产资源和矿石储量报告守则”所界定的称职人员的资格。布劳德持有奔驰矿业公司(Benz Mining Corp)的证券,并同意根据他的信息以其出现的形式和背景包含所有技术声明。该公司证实,与第一次报告结果时相比,没有实质性变化。

The information in this announcement that relates to the Inferred Mineral Resource was first reported under the JORC Code by the Company in its prospectus released to the ASX on 21 December 2020. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and confirms that all material assumptions and technical parameters underpinning the estimate continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcement.

本公告中有关推断矿产资源的资料由本公司于二零二零年十二月二十一日向澳交所发布的招股说明书中根据JORC守则首次申报。本公司确认并不知悉有任何新资料或数据对原始市场公告所包括的资料有重大影响,并确认支持该估计的所有重大假设及技术参数继续适用,且未有重大改变。本公司确认,与最初的市场公告相比,提交合格人士调查结果的形式和背景没有重大修改。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发