share_log

Hercules Silver Commences Phase III Drill Program

Hercules Silver Commences Phase III Drill Program

Hercules Silver 启动第三阶段钻探计划
newsfile ·  05/06 07:00

Toronto, Ontario--(Newsfile Corp. - May 6, 2024) - Hercules Silver Corp. (TSXV: BIG) (OTCQB: BADEF) (FSE: 8Q7) ("Hercules Silver" or the "Company") is pleased to announce that three core drilling rigs are now fully mobilized and drilling the first three holes of an extensive 20,000m drill program at the Company's wholly-owned Hercules Silver Property in western Idaho ("Hercules" or the "Property"). Timberline Drilling of Hayden, Idaho has returned to carry out the program, which will consist of drilling 200m centers along NW-SE fences, starting west of the 2023 discovery area, and testing new magnetic anomalies and conductivity and chargeability anomalies identified by a 2023 deep-seeking 3D induced polarization ("IP") survey ("2023 IP survey").

安大略省多伦多--(Newsfile Corp.-2024 年 5 月 6 日)- 大力神银业公司 (TSXV: BIG) (OTCQB: BADEF) (FSE: 8Q7) (”赫拉克勒斯银“或者”公司“)很高兴地宣布,三台岩心钻机现已全部动员,并在该公司位于爱达荷州西部的全资Hercules Silver Property钻探了20,000米的大规模钻探计划的前三个孔(“大力神” 或者 “财产”)。爱达荷州海登的Timberline Drilling已返回执行该项目,该项目将包括沿着西北东南围栏钻探200米的中心,从2023年发现区以西开始,并测试新的磁异常以及由2023年深度搜索的三维诱导极化识别出的电导率和可充电性异常(”IP“) 调查 (”2023 年知识产权调查“)。

Highlights

亮点

  • Commenced core drilling at Hercules with two Atlas Copco CS14 rigs that have an effective depth capacity of 1,000m and one Atlas Copco CS3001 rig with an effective depth capacity of 2,000m in Hercules ground conditions. Both drills are track-mounted for enhanced maneuverability.

  • The first two CS-14 rigs arrived and began coring HER-24-01 and HER-24-02 ahead of schedule on April 22, to get a head start on challenging drilling conditions that were anticipated in the Upper Plate in that area.

  • The actual number of holes drilled will depend on the depth of holes, which is to be determined based on visual logging of mineralization.

  • Drilling will operate 24/7 on two 12-hour shifts (day and night).

  • Core samples will be sent to the MSA Labs in Langley, British Columbia.

  • The phase III drill program will focus on multiple targets, including (see Figure 1):

    • Drilling on 200m centers along NW-SE fences, starting with three holes to the west, northwest and north from HER-23-05, which had the best copper intercept in 2023 of 185.29m of 0.84% Cu and 111 ppm Mo from 246m to 431.2m, including 45.33m of 1.94% Cu in an upper enrichment blanket.

    • A conductivity anomaly at the Belmont Zone identified by the 2023 IP survey. Prospecting of historical waste dumps at Belmont recently uncovered strong chalcocite mineralization, potentially sourced from an underlying enrichment blanket.

    • Two magnetic high anomalies below the Belmont and Grade Creek Zones, potentially representative of magnetite alteration, commonly associated with a central potassic zone.

    • Near surface chargeability anomaly at the Big Cut Skarn, situated at the edge of the IP survey.

  • A road upgrade project has now been completed with safety berms and 3-inch crushed rock emplaced over the existing dirt surface and subsequently graded to allow for safe vehicle travel in inclement weather conditions. This is expected to reduce standby time at the drills and potentially further extend the drilling season.

  • 开始在赫拉克勒斯进行岩心钻探,两台有效深度容量为 1,000 米的阿特拉斯·科普柯 CS14 钻机和一台在赫拉克勒斯地质条件下有效深度承载能力为 2,000 米的阿特拉斯·科普柯 CS3001 钻机。两台钻机均安装在轨道上,以增强机动性。

  • 前两台 CS-14 钻机抵达并于 4 月 22 日提前开始采矿 HER-24-01 和 HER-24-02,以抢占该地区上板块预期的艰难钻探条件。

  • 钻孔的实际数量将取决于钻孔的深度,该深度将根据矿化的目视记录来确定。

  • 钻探将进行两次 12 小时轮班(白天和晚上),全天候运行。

  • 核心样本将送往位于不列颠哥伦比亚省兰利的 MSA 实验室。

  • 第三阶段的钻探计划将侧重于多个目标,包括(见图 1):

    • 沿着西北-东南围栏在 200 米中心钻探,首先从 HER-23-05 向西、西北和向北钻三个孔,该钻孔在 2023 年的铜截距最好,从 2.46 米到 4.312 米为 111 ppm,其中 1.94% 的铜截距为 185.29m,从 2.46 米到 4.312 亿个,其中上层富集层中有 4.533 亿个 1.94% 的铜。

    • 2023 年知识产权调查发现贝尔蒙特区的电导率异常。最近对贝尔蒙特历史废物堆放场的勘探发现了强烈的硫铝石矿化作用,可能来自底层的富集层。

    • 贝尔蒙特和格雷德溪区下方的两个磁高位异常,可能代表磁铁矿蚀变,通常与中心钾区有关。

    • 位于知识产权调查边缘的Big Cut Skarn的近地表充电率异常。

  • 道路升级项目现已完成,在现有泥土表面铺设安全护堤和3英寸的碎石,随后进行分级,以便车辆在恶劣天气条件下安全行驶。预计这将减少钻探的待机时间,并有可能进一步延长钻探季节。

Chris Paul, CEO and Director of the Company, commented, "Our much-anticipated Phase III drill program is officially underway, with all three drill rigs mobilized and turning. This is the largest program we have had to date and is backed by an immense amount of planning and interpretation supported by our largest shareholder, Barrick Gold Corporation. The team has been on site since April 14, further re-logging the 2023 drill core and developing new insights into the porphyry controls and targets. Important vein controls are now being recognized which appear to contribute a large portion of the copper endowment at Leviathan.

公司首席执行官兼董事Chris Paul评论说:“我们备受期待的第三阶段钻探计划已正式启动,所有三台钻机均已调动并进行转向。这是我们迄今为止规模最大的项目,由我们的最大股东巴里克黄金公司提供的大量规划和解释支持。该团队自4月14日以来一直在现场,进一步重新记录了2023年的钻芯,并对斑岩控制和目标有了新的见解。重要的静脉控制措施现已得到认可,这似乎占了利维坦铜矿储量的很大一部分。

In addition, our road upgrade project is now complete, preventing a significant amount of what would have been standby time for the drills, after a late season snow event occurred at the end of April. Our roads are now expected to be safe for vehicle and equipment access even in poor weather conditions. We look forward to sharing further updates as we enter a very exciting chapter of the Company's history."

此外,在4月底发生季末降雪事件之后,我们的道路升级项目现已完成,从而缩短了演习的大量待机时间。现在,即使在恶劣的天气条件下,我们的道路也有望安全地通行车辆和设备。在我们进入公司历史上非常激动人心的篇章之际,我们期待分享更多的最新消息。”

Phase III Drill Program

第三阶段钻探计划

Hercules entered the early stages of a new porphyry discovery last year with a series of initial deep drill holes which encountered strong phyllic alteration, typical of the margins of a porphyry system, over an approximate 450m x 500m area.

去年,赫拉克勒斯进入了新斑岩发现的早期阶段,最初钻出了一系列深层钻孔,这些钻孔在大约450m x 500m的区域内遇到了强烈的斑岩系统的边缘,这是斑岩系统边缘的典型现象。

The first three planned holes of the 2024 field season are now currently being drilled as shown on Figure 1. Information from these first holes will influence the planning of subsequent holes. The Company has elected to commence the phase III program with three step-out holes to the west, northwest and north of HER-23-05, which is an area viewed as having the highest potential for early success. The aim is to then drill 200m centers along NW-SE oriented fences, to generate meaningful cross-sections within this high priority area. This will help our technical team understand the overall geometry of the system and optimize the orientation (dip and azimuth) of drill holes which will then test more far field targets such as Belmont and Grade Creek.

2024年油田季节的前三个计划钻孔目前正在钻探中,如图1所示。来自第一批钻孔的信息将影响后续钻孔的规划。该公司已选择在 HER-23-05 的西、西北和北部开设三个阶梯式钻孔开始第三阶段的项目,该地区被认为最有可能取得早期成功。然后,目标是沿着朝向西北的围栏钻出 200 米的中心,以便在这个高度优先的区域内生成有意义的横截面。这将帮助我们的技术团队了解系统的整体几何形状,优化钻孔的方向(倾角和方位角),从而测试更多的远场目标,例如贝尔蒙特和格拉德克里克。

The objectives of the phase III program are to:

第三阶段计划的目标是:

1) Utilize systematic step-outs to vector into the highest-grade portion of the system;

1) 利用系统步进向量进入系统的最高等级部分;

2) Identify the overall size of the target; and

2) 确定目标的总体规模;以及

3) Recognize the geometry of the system to further refine the 3D target model.

3) 识别系统的几何形状,进一步完善三维目标模型。

Figure 1: Phase III initial drill holes HER-24-01 through -03, IP chargeability at 800m elevation, soil geochemistry and surface traces of deep magnetic anomalies.

图 1:第三阶段初始钻孔 HER-24-01 至 -03、海拔 800 米处的 IP 充电能力、土壤地球化学和深层磁异常的表面痕迹。

Figure 2: CS-14 drill rig set up and coring on HER-24-02.

图 2:CS-14 钻机在 HER-24-02 上设置和取芯。

Figure 3: CS-3001 drill rig mobilizing on HER-24-03 pad. HER-24-02 pad in background.

图 3:CS-3001 钻机在 HER-24-03 底盘上移动。背景中的 HER-24-02 垫子。

Figure 4: Coarse gravel and safety berm road upgrades, Belmont Zone.

图 4:贝尔蒙特区的粗糙碎石和安全护堤道路升级。

Qualified Person

合格人员

The scientific and technical information in this news release has been reviewed and approved for disclosure by Christopher Longton BS, CPG, Hercules' Vice President, Exploration. Mr. Longton is a "Qualified Person" for Hercules Silver within the meaning of National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

本新闻稿中的科学和技术信息已由大力神勘探副总裁CPG克里斯托弗·朗顿BS审查并批准披露。根据国家仪器43-101——矿业项目披露标准,朗顿先生是Hercules Silver的 “合格人士”。

Conference Participation

会议参与情况

The Company is pleased to announce that members of its executive team are participating in the upcoming Canaccord Genuity 3rd Annual Global Metals & Mining Conference taking place May 7-9, 2024, in Palm Desert, California.

公司很高兴地宣布,其执行团队成员将参加即将于2024年5月7日至9日在加利福尼亚州棕榈沙漠举行的Canaccord Genuity第三届年度全球金属与矿业会议。

About Hercules Silver Corp.

关于赫拉克勒斯白银公司

Hercules Silver Corp. (TSXV: BIG) (OTCQB: BADEF) (FSE: 8Q7) is an exploration Company focused on developing Idaho's newest copper and silver district.

Hercules Silver Corp.(多伦多证券交易所股票代码:BIG)(场外交易代码:BADEF)(FSE:8Q7)是一家勘探公司,专注于开发爱达荷州最新的铜银区。

The 100% owned Hercules Project located northwest of Cambridge, hosts the newly discovered Leviathan porphyry copper system, one of the most important discoveries in the region to date. The Company is well positioned for growth through continued drilling, supported by extensive historical and current exploration and a strategic investment by Barrick Gold.

这个 100% 所有权的赫拉克勒斯项目位于剑桥西北部,拥有新发现的利维坦斑岩铜系统,这是该地区迄今为止最重要的发现之一。在广泛的历史和当前勘探以及Barrick Gold的战略投资的支持下,通过持续的钻探,该公司完全有能力实现增长。

With the potential for significant scale, the Company's management and board of directors aims to build on its proven track record which includes the discovery and development of numerous precious metals projects worldwide.

该公司的管理层和董事会有可能扩大其良好的业绩记录,包括在全球范围内发现和开发众多贵金属项目。

For further information please contact:

欲了解更多信息,请联系:

Nisha Hasan
Investor Relations
Telephone +1 (604) 425-1408
Email: nisha@herculessilver.com

妮莎·哈桑
投资者关系
电话 +1 (604) 425-1408
电子邮件:nisha@herculessilver.com

Chris Paul
CEO & Director
Telephone +1 (604) 670-5527
Email: chris@herculessilver.com

克里斯·保罗
首席执行官兼董事
电话 +1 (604) 670-5527
电子邮件:chris@herculessilver.com

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. Any securities referred to herein have not and will not be registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws of an exemption from such registration is available.

本新闻稿不构成美国任何证券的卖出要约或收购要约的邀请。此处提及的任何证券过去和将来都不会根据经修订的1933年《美国证券法》进行注册(”《美国证券法》“) 或任何州证券法,除非根据美国证券法和适用的州证券法进行注册,否则不得在美国境内或向美国人出售或出售,除非根据美国证券法和适用的州证券法进行注册,可以豁免此类注册。

Disclaimer for Forward-Looking Information

前瞻性信息免责声明

This news release contains certain information that may be deemed "forward-looking information" with respect to the Company within the meaning of applicable securities laws. Such forward-looking information involves known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking information. Forward-looking information includes statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur. Forward-looking information contained in this press release may include, without limitation, the expected execution of future exploration programs on the Property; assay results of future drill holes; results of operations, and the expected financial performance of the Company.

本新闻稿包含某些信息,根据适用的证券法,这些信息可能被视为与公司有关的 “前瞻性信息”。此类前瞻性信息涉及已知和未知的风险、不确定性和其他因素,这些因素可能导致公司的实际业绩、业绩或成就或行业发展与此类前瞻性信息所表达或暗示的预期业绩、业绩或成就存在重大差异。前瞻性信息包括不是历史事实的陈述,通常以 “期望”、“计划”、“预期”、“相信”、“打算”、“估计”、“项目”、“潜力” 和类似的表述来识别,或者事件或条件 “将”、“会”、“可能” 或 “应该” 发生。本新闻稿中包含的前瞻性信息可能包括但不限于该物业未来勘探计划的预期执行情况;未来钻孔的化验结果;经营业绩以及公司的预期财务业绩。

Although the Company believes the forward-looking information contained in this news release is reasonable based on information available on the date hereof, by its nature, forward-looking information involves assumptions and known and unknown risks, uncertainties and other factors which may cause our actual results, level of activity, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information.

尽管根据本新闻稿发布之日可用的信息,公司认为本新闻稿中包含的前瞻性信息是合理的,但就其性质而言,前瞻性信息涉及假设以及已知和未知的风险、不确定性和其他因素,这些因素可能导致我们的实际业绩、活动水平、业绩或成就或其他未来事件与此类前瞻性信息所表达或暗示的任何未来业绩、业绩或成就存在重大差异。

Examples of such assumptions, risks and uncertainties include, without limitation, assumptions, risks and uncertainties associated with general economic conditions; the Covid-19 pandemic; adverse industry events; the receipt of required regulatory approvals and the timing of such approvals; that the Company maintains good relationships with the communities in which it operates or proposes to operate, future legislative and regulatory developments in the mining sector; the Company's ability to access sufficient capital from internal and external sources, and/or inability to access sufficient capital on favorable terms; mining industry and markets in Canada and generally; the ability of the Company to implement its business strategies; competition; the risk that any of the assumptions prove not to be valid or reliable, which could result in delays, or cessation in planned work, risks associated with the interpretation of data, the geology, grade and continuity of mineral deposits, the possibility that results will not be consistent with the Company's expectations, as well as other assumptions risks and uncertainties applicable to mineral exploration and development activities and to the Company, including as set forth in the Company's public disclosure documents filed on the SEDAR+ website at .

此类假设、风险和不确定性的示例包括但不限于与总体经济状况相关的假设、风险和不确定性;Covid-19疫情;不利的行业事件;所需的监管批准的获得和此类批准的时间;公司与其运营或拟运营的社区保持良好关系;采矿业未来的立法和监管发展;公司从内部和外部来源获得足够资本的能力,和/或无法以优惠条件获得足够的资本;加拿大乃至整个采矿业和市场;公司实施业务战略的能力;竞争;任何假设被证明无效或不可靠,可能导致计划工作延迟或停止的风险,与数据解释、矿床的地质、品位和连续性相关的风险,结果与公司预期不一致的可能性以及其他假设风险和不确定性适用于矿产勘探和开发活动以及公司,包括公司在SEDAR+网站上提交的公开披露文件中规定的内容,网址为。

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS PRESS RELEASE REPRESENTS THE EXPECTATIONS OF HERCULES SILVER AS OF THE DATE OF THIS PRESS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE HERCULES SILVER MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

本新闻稿中包含的前瞻性信息代表了赫拉克勒斯·西尔弗截至本新闻稿发布之日的预期,因此,该日期之后可能会发生变化。读者不应过分重视前瞻性信息,也不应像其他任何日期一样依赖这些信息。尽管 HERCULES SILVER 可以选择更新这些信息,但除非适用法律有要求,否则它不承诺在任何特定时间更新这些信息。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

多伦多证券交易所风险投资交易所及其监管服务提供商(该术语在多伦多证券交易所风险投资交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发