Q1 2024 Northwest Pipe Co Earnings Call

In this article:

Participants

Scott Montross; President, Chief Executive Officer, Director; Northwest Pipe Co

Aaron Wilkins; Chief Financial Officer, Senior Vice President, Corporate Secretary; Northwest Pipe Co

Brent Thielman; Analyst; DA Davidson

Julio Romero; Analyst; Sidoti & Co

Ed Jackson; Analyst; Northland Securities

David Wright; Analyst; Henry Investment Trust

Presentation

Operator

Hello, and welcome to the Northwest Pipe Company first-quarter 2024 earnings call. (Operator Instructions) As a reminder, this conference is being recorded.
It's now my pleasure to turn the call over to Scott Montross, CEO of Northwest Pipe Co., please go ahead.

Scott Montross

Good morning, and welcome to Northwest Pipe Company's first quarter 2024 earnings conference call. My name is Scott Montross, and I'm President and CEO of the company. I'm joined today by Aaron Wilkins, our Chief Financial Officer. By now all of you should have access to our earnings press release, which was issued yesterday, May 1, 2024 at approximately 4 PM Eastern time. This call is being webcast and it is available for replay.
As we begin, I would like to remind everyone that the statements made on this call regarding our expectations for the future are forward-looking statements and actual results could differ materially. Please refer to our most recent Form 10-K for the year ended December 31, 2023, and in our other SEC filings for a discussion of such risk factors that could cause actual results to differ materially from our expectations. We undertake no obligation to update any forward-looking statements.
Thank you all for joining us today, and I'll begin with a review of our first quarter performance and outlook for 2024. Aaron will then walk you through our financials in greater detail.
Our first-quarter results were mixed with steel pressure pipe business surpassing our expectations. While precast came in softer than anticipated on the whole, our net sales of $113.2 million increased 14.2% year over year on solid profitability levels and representing the strongest revenue first quarter we have ever had first quarter revenue from our SPP segment totaled $80 million, an increase of 25.9% year over year, the highest first quarter ever reported in company history.
For this segment, our performance primarily reflected higher production levels due to changes in project timing related to strong pipeline of bidding opportunities in early to mid first quarter and the improved bidding environment we've experienced to date following the relatively small bidding year we had in 2023.
Our SPP team continues to do an excellent job executing on bids and projects. The very strong bidding activity in project wins in the first quarter led to our SPP backlog, including confirmed orders as of March 31 totaling $337 million, an improvement from $319 million as of December 31, 2023, and down from the $370 million at March 31, 2023. Our first quarter performance was partially offset by lower selling prices due to production mix and project timing. Steel prices continue to remain fairly high by historical standards and appear to be relatively stable, fluctuating $10 to $20 per ton up or down on a weekly basis. Lead times remain fairly short at between three and six weeks.
Now turning to our precast segment, free cash revenue declined 6.6% year over year to $33.2 million, primarily due to very slow first quarter shipments in the nonresidential construction related precast business at Park resulting from fairly light bookings in the fourth quarter of 2023 due mainly to customer caution related to current interest rate environment. As a result, we booked only $16 million of orders at Park in the fourth quarter.
However, our first quarter bookings at Park rebounded to a strong level coming in at over $22 million. The residential business at Geneva continued to be strong with strengthening order books as well as robust production and shipment levels, especially for a first quarter, which is typically the seasonally slower time of the year, both residential and nonresidential precast business came under modest pricing pressure during the first quarter.
That, along with some of the mix changes that we experienced drove a lower average selling price for precast which was partially offset by higher shipping volumes from the residential precast business at Geneva. As of March 31, our order book totaled $52 million, up from $46 million as of December 31, 2023, and down from the $58 million as of March 31, 2023. First quarter consolidated gross profit increased 21.5% year over year to $20.1 million, resulting in a gross margin of 17.8%, up from 16.7% in the first quarter of 2023.
Our SPP gross margin of 17.8% was strong, increasing by approximately 560 basis points over the prior year period. And 280 basis points over the prior quarter, primarily due to higher production volume, given customer driven timing changes and by significant strength in first quarter bidding activity coupled with our persistent focus on higher-margin business.
Our precast gross margin of 17.7% was down compared to 24.7% in the first quarter of 2023 as depressed shipments on the nonresidential construction side resulted in reduced first quarter revenue at the Park facilities and the associated lower overhead absorption. However, as we expected, the margins on the residential construction side at Geneva have also come under some modest pressure due to regional differences in market demand.
Next, I would like to provide an update on our capital allocation priorities. Our top strategic priority for 2024 remains growth of the business through our organic product spread strategy and M&A opportunities. Beginning with product spread, we continue to execute Level one of this strategy by building out capacity utilization at our Texas-based precast plants with a goal of maximizing overall efficiencies and production volume. During the first quarter, we bid on $11.8 million worth of projects outside of Texas and booked approximately $2.5 million worth of orders outside of Texas.
In regard to level two of our strategy to produce part precast products out of our existing Northwest Pipe locations. We were in production on 14 projects at the Geneva locations during the first quarter of 2024 and we are currently in production on 16 projects with more scheduled to come.
Once the park precast products are more comfortably established at the Utah locations. We plan to expand our level two product spread to additional geographic locations over the next couple of years. Following organic growth, we are committed to repaying the debt we incurred to finance the 2021 acquisition of Parq USA to ensure we are well positioned to take advantage of future growth opportunities.
As it pertains to our M&A strategy, we are actively evaluating precash related opportunities. Our criteria includes high-quality candidates that are accretive to our EPS that possess strong organic growth and margin potential, solid asset efficiency and a consistent positive cash flow profile until we are ready to execute a meaningful acquisition. We may opt to be opportunistic in repurchasing shares of our common stock, subject to our liquidity, including availability of borrowings and covenant compliance under our amended amended credit facility and other capital needs of the business.
During the first quarter, we repurchased approximately 127,000 shares for a total of $3.7 million and since the initial authorization of our share repurchase in November 2023, we bought back a total of approximately $5 million worth of our shares as of April 30th. For I conclude, I'd like to summarize our outlook for the second quarter of 2024.
In our SPP business, we anticipate both our revenue and gross margin to be relatively in line with the first quarter of 2024. As we move throughout the balance of the year, we expect continued strength in our revenue and margins similar to what we saw in 2022. We also expect backlog to remain high by historical standards, given the volume mix of expected SPP bidding in 2024.
I'd also like to add, we remain encouraged by the amount of activity we're seeing on our current and upcoming water transmission projects. For a more complete view of these projects, please review our investor presentations which can be found on the Investor tab of our website within the Events and Presentations section in our precast business following a slow first quarter, which is generally the case in our precast segment, we are expecting significant improvement in both revenue and margins for the second quarter of 2024 and a strong remainder of the year.
We continue to believe in the strength of the precast business in the mid to long term, given the significant level of pent-up demand specifically for residential housing, a growing need for infrastructure spending in the US and our growing market position.
In summary, the first quarter marked a solid start to the year in what we believe will be a significantly stronger bidding environment. Despite persistent macro economic challenges. The diversification strategy that we embarked on in 2020 is continuing to take shape, and we remain focused on positioning ourselves to take advantage of future growth opportunities that we anticipate arising in the free cash space.
We continue to believe in the prospects of the precast business longer term, despite the current interest rate environment and the resultant impacts to our financial performance. We believe the less cyclical nature of the precast business helps balance out the business during periods of variability and steel pressure pipe market.
Given the more transactional nature of the precast business and associated faster cash conversion cycle. Our goal remains for our precast related business to grow to a similar size as our SPP business in the near term, I'd like to thank our teams in the field for the strong operational performance and for the continued emphasis on safety infused at every level of our organization.
Looking ahead, our priorities remain one, maintaining a safe workplace, where our employees are proud to work to persistently focus and on margin over volume, three, continuing to implement cost reductions and efficiencies at all levels of the company for continuing to identify strategic opportunities to grow the Company and five in the absence of M&A opportunities, returning value to our shareholders through opportunistic share repurchases.
I will now turn the call over to Aaron, who will walk through our financial results in greater detail.

Aaron Wilkins

Thank you, Scott, and good morning, everyone. I'll begin today with an overview of our first quarter profitability. Diluted net income for the first quarter was $5.2 million, or $0.52 per diluted share compared to $2.4 million or $0.23 per diluted share in the first quarter of 2023. Consolidated net sales increased 14.2% to $113.2 million compared to $99.1 million in the year ago quarter.
Steel pressure pipe segment sales increased 25.9% to $80 million to $63.5 million in the first quarter of 2023. As Scott highlighted earlier, steel pressure pipe sales exceeded our expectations, driven by a 54% increase in tons produced, resulting primarily from changes in project timing, which was partially offset by an 18% decrease in selling price per ton, primarily due to product mix.
Precast segment sales decreased 6.6% to $33.2 million compared to $35.6 million in the first quarter of 2023 due to a 24% decrease in selling prices, primarily due to product mix was partially offset by a 23% increase in volumes shipped. Our Geneva business benefited from higher shipment volumes in the first quarter, while our park business saw contractors extend delivery time lines.
Products we manufacture are unique there for shipment volumes, in the case of precast production volumes in the case of steel pressure pipe and the corresponding average sales prices for both segments do not always provide comparable metrics between periods as they are highly dependent on the composition of each segment's product mix.
Consolidated gross profit increased 21.5% to $20.1 million or 17.8% of sales compared to $16.6 million or 16.7% of sales in the first quarter of 2023 as GP gross profit increased 83%, $14.2 million or 17.8% of segment sales for the gross profit of $7.8 million, 12.2% of segment sales in the first quarter of 2023, primarily due to higher volume and changes in product mix.
Precast gross profit decreased 33% to $5.9 million or 17.7% of pretax sales, $8.8 million or 24.7% of segment sales in the first quarter of 2023, primarily due to changes in product mix. While demand has shown some recent signs of strength, particularly for residential products, precast segment's average selling prices have moderated through recent market pressures, which coupled with the shipment delays at Park, resulted in first quarter precast margins below our expectations.
Selling, general and administrative expenses decreased 3.6% to $11.4 million or 10.1% of sales compared to $11.9 million in the first quarter of 2023 or 12% of sales. The decrease was primarily due to $0.5 million in lower incentive compensation expense for the full year of 2024. We continue to expect our Consolidated selling general and administrative expenses to be in the range of approximately $45 million to $47 million. Depreciation and amortization expense in the first quarter of 2024 was $3.4 million compared to $2.8 million in the year ago quarter.
Given the larger bidding year expected for the steel pressure pipe business and the planned commissioning of our new reinforced concrete pipe plan. We currently expect depreciation and amortization to increase modestly in 2024. Our non-cash incentive compensation expenses were $1 million for both the first quarters of 2024 and 2023. Interest expense increased modestly to $1.5 million from $1.4 million in the first quarter of 2023 due to higher interest rates, which more than offset the decrease in average daily borrowings.
For the full year of 2024, we expect interest expense to range between $5 million and $6 million. Our first quarter income tax expense was $2 million, resulting in an effective income tax rate of 27.5% compared to $1 million in the prior year quarter for an effective income tax rate of 28.7%. Our tax rate for the first quarter of 2024 and 2023 were impacted by non-deductible permanent differences. We continue to expect our tax rate for the full year of 2024 be within the range of 25% to 27%.
Now I will transition to our financial condition. Net cash used in operating activities was $26.1 million in the first quarter of 2024 for the net cash provided by operating activities of $26.3 million in the first quarter of 2023, primarily due to changes in working capital, which were partially offset by increased net income adjusted for noncash items cash flow generation remains a key strategic focus of our business as it is critical to the execution of our growth and shareholder return strategies. While we expected pressure on working capital needs for the steel pressure pipe business in the first half of the year. Working capital at March 31 was higher than expected due largely to higher production levels experienced in the quarter.
This was coupled with traditional pressures we see on steel pressure pipe segments. Working capital needs usually attributed to lower billings associated with the seasonal slowing in shipments to job In addition, we maintained higher inventory levels through the first quarter notice for this, the growth and production levels expected in 2024. However, we continue to expect these timing differences will reverse through the balance of the year.
And as a result, we continue to expect full year 2024 free cash flow to range between $19 million and $25 million our capital expenditures totaled $4.6 million in the first quarter of 2024 compared to $4.4 million in the prior year quarter. We continue to anticipate our total CapEx to be in the range of $19 million to $22 million for full year 2024.
As Scott highlighted, we completed $3.7 million in share repurchases in the first quarter of 2024 at an average price of $29.39 per share, all of which were executed under a 10b5-1 trading plan since the inception of the program through April 30, the total value of share repurchases are approximately $5 million. As of March 31, 2024, we had 89.9 million of outstanding borrowings on our credit facility, leaving approximately 34 million in additional borrowing capacity on our credit line.
In summary, we are very pleased with the first quarter results, which represent the best first quarter profitability performance the company has achieved in over a decade. Now that we are through the seasonally slower first quarter, we are well positioned to capitalize on improving market conditions through the balance of the year. Thank you to all of our employees for their continued exemplary execution and commitment to safety as well as to our shareholders for their continued support and confidence in Northwest Pipe Company.
I will now turn it over to the operator to begin the question and answer session.

Question and Answer Session

Operator

(Operator Instructions) Brent Thielman from D.A. Davidson. Your line is now live.

Brent Thielman

I guess just first on that precast, I mean a little lower than we were I think in terms of margins this quarter, Scott or Aaron, what's kind of a reasonable case to a rebound in the next few quarters, just considering is some of the differences in regions and what sounds like a little better pricing or lower pricing being realized right now?

Aaron Wilkins

I think when you when you're looking at the free cash flow premise, it's really the steel pressure pipe business ended up being significantly stronger than we thought it was going to be in the first quarters of. So as you know, that ties up a lot of current assets initially and then it starts to roll off of those current assets and then come back to the balance sheet. So we expect the steel pressure pipe revenues to be relatively stable throughout the year.
So now that we're up at a plateau, I think that we're going to we're going to see that reverse as we come out of this thing. Clearly, we're getting more all the time is more prepayments for steel and actually MOH. payments in fact, we we just won a big project. Not long ago, we were receiving well in excess of $10 million of prepayment for the whole project.
So I think that's going to contribute to the cash flow as we go forward. Two plus everybody in the senior management program at this company now has a cash flow goal for the year. So with it tied to variable compensation. So that is being very, very closely watched.
So Brent, just to make, I think you may have said free cash flow or free cash in our segment, I kind of break out margins.

Brent Thielman

What well I had that was going to make I'm sorry, Josh, you answered that.
But. No, I was asked for impairment at the precast market margins in energy boundary ought to be thinking about?

Aaron Wilkins

Yes, it sounds like you think it's going to get better from here and with the Precor, it was it was really on the nonresi side part, the bookings were really, really slow in the fourth quarter of 2023. We booked like $16 million worth of business park in the fourth quarter, which really led to a and it's pretty transactional business on the precast side, right?

Brent Thielman

So it really led to a very small shipping first quarter of 2024?

Aaron Wilkins

Well, that's kind of rebounded now. As we've gone through the first quarter, we've booked in excess of $22 million at Park in the in the first quarter, which should lead to a pretty strong second quarter in Park and in those margins coming back up.
The other thing is with free cash, we are still seeing a substantial demand from the residential side. And ultimately, what we're seeing is a Geneva order books, and that's mostly residential that's continuing to grow. And we've just implemented a price increase there in March because the bookings are coming in so strong. So we're pretty confident we're going to see a pretty good rebound in both both revenue and margins as we get into the second quarter and through the rest of the year.

Brent Thielman

Okay. And Scott, just coming back to SPP. Yes, when I thought you would have seen some delays, I think you did see some delays just with respect to the poor weather in parts of the country, but it does things have been a huge impact. Was there was there pull forward this quarter? I'm just wondering why the outsized performance because it I had expected some some delays there and we'll start using project timing.

Scott Montross

I wouldn't say anything was pull forward, but it's really we had we had so much work bid in the first quarter and won so much work in the fourth first first quarter that we're starting to get pretty loaded up at some of the facilities.
So as a whole, we're having dividends, which jockey the production schedules around a little bit so that we can produce these things on time. And it really wasn't a pull forward. But I mean, we produced $80 million worth of revenue in the first quarter in the backlog still went up by like 18 or 19 million. I can't remember when exactly it was so you can you can you could kind of do the math on how much we won work in the first quarter. So we're pretty loaded up with some of the facilities.

Brent Thielman

And just the last question to that, Scott, with all the work that you're picking up and maybe the pricing attached to that, is it more attractive I guess is the bid climate? I'm more appealing to you from a competitive standpoint.

Scott Montross

Yes, I think when you're when you're dealing about the pricing, it's it's a it's a function of what steel prices are in. One of the things is if steel prices are remaining pretty high by historical standards, they're pretty stable right now, fluctuating around a 25 or a 35 for for hot roll band. But there's two things that drive margins for the steel pressure pipe thing. One is obviously, demand and demand builds backlog industry-wide. And when backlogs build like that industry wide. What happens is is not everybody can do a job at the same time.
So you have less bidding pressure on these jobs and you tend to see the margin start to move its way up a bit, too. So we're pretty good happy about the direction that all that is going right now. And these margins are moving in the right direction at this point.

Brent Thielman

Excellent.
Thank you.
I'll pass it on.

Operator

Your next question is coming from Julio Romero from Sidoti & Co.

Julio Romero

Craig, just on there and maybe staying on that point on SPP, I'm just trying to maybe understand on strong margins a little bit better because they were really impressive. And as you just said, in response to Brent's question, it was customer-driven project timing. You said you had to move around production levels a bit, but it wasn't pull-forwards. Are you saying maybe you took on some some quick-turn work at like the we favorable? Is that whatever?

Aaron Wilkins

Yes, we got first quarter was a little short fuse on it. And ultimately, we got a little bit higher production levels on it. But we're seeing we're seeing really, really strong bidding through the first quarter and we expect the year to be a pretty good strong bidding year and we have not even gotten to the IJA. funded part of this market for us on steel pressure pipe that is a thing that's probably out in 20 late 25, 26, 27, 28.
So the expectation is we have a pretty strong steel pressure pipe market coming at us for multiple years in a row. And when you get multiple strong markets for steel pressure pipe in a row, you tend to get a situation where the margins start to push up toward something that begins with a two at that point.
So I think that we're kind of heading in that direction right now because of the demand that we're seeing coming forward. And the other thing with margins is higher production levels and you're spreading your fixed costs out over more tons, right?
So it's a it's a better situation that way so we've we've got a pretty decent tailwind behind us. We believe on the steel pressure pipe side, both on revenue and in margin right now is as we go through the near term and quite frankly, longer term because of the IGA.

Julio Romero

Got it. That's good color and thanks for. Thanks for adding that.
So I guess are you guys saying that you kind of exited March at a strong production level and that kind of carry into April. And that's what gives you the confidence that revenue and margins in 2Q for SPP. should should look like something that you posted in 1Q?

Aaron Wilkins

Yes, it's really what we have in backlog already. I mean, we carried, like I said, once and when Brent was asking questions. I mean, we produced we produced $80 million worth of revenue in steel pressure pipe in the first quarter and the backlog's still went up by 18 million or so so that you can do the math on how much kind of we won in the first quarter with work, and it's starting to build up at these things.
So we expect the rest of the year on steel pressure pipe to be strong. And, you know, when you look at some of the construction trends, the you know, the non-residential stuff is really the nonresidential and the non-building part of non-residential stuff is has been pretty solid. And that's the that's the thing that affects where we are on steel pressure pipe. So we'd expect that to be a bit to be pretty solid as we're going forward through the rest of the year.

Julio Romero

But do you guys think what you think what do you think volume and bidding inflected so quickly and strongly in 1Q, was there anything that you can call out there that drove that?

Aaron Wilkins

No, I think the heart of it, what it is we had some some stuff that was originally intended for 23 that ended up in the first part of 2024. So probably the years would have been on a little bit more level. Had it not been for that, but I think it's that in some of the stuff that's coming forward, we're just now starting seeing some of the IGA funding is come into place.
It's slow getting started because there's like 46 million or 46 billion set aside for water type projects like the things that we do and so far through the end of the year in 2023, only about 1.8 billion of it's been actually put out a paid out. So there's a lot to be there's a lot to be done. And I think those projects are really going to help buoy this stuff as we go forward. And I'm not sure if I answered your question the way you want it, what was the other part of that?

Julio Romero

Really us just trying to get a feel for what like how you ended up with strong volumes and backlog up and anything onetime in nature that caused this inflection in bidding and volumes in the first quarter.

Aaron Wilkins

But I think you know enough yet, and I won't do is so have the in the first order what is starting to fill up a little bit in remember, we there's only three major competitors in steel pressure pipe after the consolidation that happened with us with us acquiring Amrun in 2018. So the tendency is those backlogs start to shift a little bit and the more the ones that have a nationwide footprint right so we can take on much more work than anybody else can and it's we're benefiting from that at this point.

Julio Romero

Got it. And just last one for me is, can you just speak to how active you are in the M&A pipeline right now on the precast side, turning to get more active all the time, we're starting to see things that we're actually interested in and looking at. And I think as we go through a period of time, it's going to it's going to continue to improve. The multiples are still a little frothy on the acquisition side because obviously we're coming off a period where there's been some pretty high business levels. And I don't know that especially on the general pre-cast side that everybody is seeing the kind of strength that we're seeing in Utah.

Scott Montross

So we're starting to see those multiples adjust a little bit. And I think as we get out through the rest of this year. It's going to get more interesting with what we're seeing because we've got we've got a couple that we're interested in and looking at right now and ultimately where we're going to be going down that road.
I think you know, the way we look at it, Leo, is that, you know, the share buyback thing is part of our growth strategy now, right? If we can't do anything and there's nothing practical or accessible on an M&A side, we're going to look at buying continuing to buy some shares back because we have to do something to make it to make it better for our shareholders. And that's that's how we're looking at this thing. So So ultimately, we will come up with something on the M&A. And until we do, we're going to continue down the path that we are because we're very active at this point.

Julio Romero

Very good.
Thanks a lot.

Operator

Ed Jackson, Northland Securities.

Ed Jackson

Your line is our IT, guys. Congrats on a super quarter and now My questions have all pretty much been answered. But just a couple of things with regards to the outlook. In your view with regards to steel pricing, my right to infer that you expect steel prices for 2024 to be relatively stable on a go forward basis and that it's underpinning your kind of 80 million quarterly run rate view?

Aaron Wilkins

You know, I'll tell you that I haven't seen and my background is in steel and I haven't seen stable steel pricing for hermetic for many years, right? So I think you go back from before 24 before things were really stable for long periods of time, but rate or it appears that we're in a little bit of a period of stability. I would think a lot of a lot of the publications are saying they expect that to kind of drift down as we go through the rest of this year.
But I think the of the steel producers at this point are doing a pretty good job of managing their markets and you see those guys will pull production capacity off relatively quickly. If things I think start to drop too far, and I think it's either going to be a little bit stable or maybe even potentially moving up at some point. But I don't see it dropping as we go through the year.
So I think in higher steel prices are good for us. On the steel pressure pipe side, it may tie a little more cash up short term, but ultimately that rolls off and goes to the balance sheet, but I think it's probably relatively stable to maybe inching up as we go out through this period of time because the minute that starts dropping a bit, those guys will pull production capacity off and stabilize things.

Ed Jackson

What do you what are you guys in terms of your kind of forward modeling? What do you kind of penciling in for kind of a per ton pricing for steel. I mean, when I look at first quarter on the Midwest contract, it looks like the average was just under 1,000 bucks a ton, but obviously, it's been, you know, lately it's been closer to 800. I mean, you've kind of what do you when you think about the remainder of 24, what are you penciling in as you model for your own business?

Aaron Wilkins

Well, the price that we realized in the first quarter now remember some of these are are bought previously other previous pricing in fuel incoming steel costs that are in the low to, yes, probably lower nine hundreds because those include freight costs and extras for whatever, whatever kind of greatest steel that you're buying, right? So so if you know from what we've talked about, we've probably got something in the area of about 900 penciled in maybe a little bit less than that for the year. And I don't really expect that to change too much to tell you the truth.

Ed Jackson

And then when when you look forward and we talked about within it came up in the last.
My last question is with regards to the second quarter view for margins in the SDP. product to be similar to the first quarter. Is it fair what I'm hearing from you and everything else is that there's a more robust market in terms of opportunity?

Aaron Wilkins

So it's lessening competition for individual bids. I mean, or is it are we going to see the margins that you had in the first quarter continue? Or is this market kind of goes along? Is there an opportunity for margins actually to improve all else being equal because you have that you have the greatest capacity and hence you have the more I'm saying you have an appetite to take on more business than other people can if that's a that's a fair question.
I think that was the backlog that we have and the projects that we've won and stuff that that it's at least something that we view to be stable going forward. But with the potential of having some upward movement, that makes sense, but it does make sense.

Ed Jackson

And then going into free cash flow. And thanks very much for all the color with regards to the Home 24 guidance. Very helpful. But I mean, I obviously was a little surprised, and I understand why the free cash flow number for the first quarter went the way it did.
I mean, it's actually a pretty decent problem to have, you know, because business is growing your committed capital, but if you're going to keep your run rate at $80 million and was to say that the runway for you given kind of the length opportunity with you know, a lot of the water projects that you mentioned growing not really until the end of 24, but really 25 and 26.
Is it fair to assume that if you maintain kind of a revenue run rate going forward for the next year or two at that 80 million, that we would continue to see this more and more improvement in free cash flow because you're right, your working capital levels were running kind of flat.
So when I'm saying we're going with this, like if you're going to run it at an $80 million run rate and you're running there now and you've just put this big increase, you know, this big drain in terms of your cash flow from working capital changes, would we would it be fair to say that your working capital levels would run relatively stable and that we could see an extended period of very solid free cash flow generation?

Aaron Wilkins

Yes, Ed, that would essentially be the way it works. We got caught in a little bit of a perfect storm. This quarter. Obviously had the production levels go up for steel pressure pipe had to kind of load the gun for the production levels coil, those are, you know, in our in our inventories, right. So really, no, we just didn't kind of get some of the good balances that we got a year ago and those those good balances are going to come. Like Scott said, we're doing a good job of getting out and working on NOH. payments with our customers working on steel prepayments with our customers.
So some of those good timing things that we've seen in the past or just kind of still in front of us for 2024. And I think the other thing, though, is as you kind of go back to just kind of a normalization of the revenue levels that will really kind of steady this year. The only thing that would really kind of steer it, I think off that path would be just a really weird blip in steel prices that has that has some potential if it were to and like we said, we don't we don't foresee that having or anything like that. But that would be the thing that really kind of derail that kind of $80 million run rate for SPP.
It's why process liquid steel with all else being equal because I understand what steel does with regards to the business itself. But all in all, I mean, that's all super encouraging.

Ed Jackson

Then my last kind of question is when you talk about a fairly strong market for precast second quarter and beyond. I mean, are we talking, you know, like can you can you can you or what are we talking about here? I mean, like I mean, it's not it's not the biggest part of your business, obviously. But I mean, can you see that business popping north of $40 million in the second quarter I mean, is it that kind of pop or is it something a little more modest?
Oh, and by the way, congratulations on the improvement in bookings in that business that was we had us a lot of decline in that for many periods. So it was really nice to see that.

Aaron Wilkins

Yes, I think for the second quarter is kind of where you're saying, if you look at last year where we were in the second quarter, second, third quarters for free cash or the big the big time of the year first quarter is generally always slow.
And you know, obviously for us, one of the one of the businesses, the pre-cast infrastructure in Geneva is in Utah and they tend to get a lot of snow in the winter and the contractors are now doing as much work during the winter. So we believe that it's going to rebound like similar to what we did last year in the second quarter and probably the year before in the second quarter also. So I think it's kind of on a similar path and we expect again after a pretty slow first quarter for free cash. We expect the rest of the year to be pretty good.

Ed Jackson

And okay. Well, I mean it was a great quarter and it looks like you're really teed up for an extended period of financial performance market performance. Congratulations and everything, and I'll talk to you later next steps.
Thank you.

Operator

(Operator Instructions) David Wright from Henry Investment Trust.

David Wright

Hey, guys. Good morning, David or David on Hey, congratulations. Great job on the stock buyback during the quarter. I think down here, that's a great thing to use your capital for M&A, and that's a really great average price, Scott, you were talking about on the kind of, you know, having a lot of SPP business and getting moving highlighted a 54% increase in tons produced. How do you do have to flex the labor force at all. I know in quarters in years past you've been kind of lower capacity utilization. How does how does that ramp up work from a staff.

Scott Montross

We sometimes we do that. But generally, when we're adding people back, it's not it's not like a whole push a whole shift or a whole crew. We may be adding here for five or seven or something like that when the when the production levels on steel pressure pipe get low, we will shed and probably something similar.
We can shed at 10 or 12 at a time certain ones of the plants. But we flex up and down pretty regularly with the change in the market situation. But and I think that right now, we're kind of in a position where we're staffed and the guys, I guess we've had a little bit of foreshadowing that this was going to potentially be coming because the way the bidding was that we've kind of staffed up for that are ready and we're ready to kind of take on the rest of the year shouldn't be much of an issue for the steel pressure pipe side at all. So we regularly do that not a big deal.
Any sense of kind of port capacity in the aggregate, the facilities operated at in the first quarter in aggregate, what I would say on that as a practical capacity for for steel pressure pipe, it was about 64, 65%.

David Wright

So you should have some room on that front because that's my only question. Great quarter and the end of things, as I think you will reach the end of our question-and-answer session.

Operator

I'd like to turn the floor back over to Scott for any further or closing comments.

Scott Montross

I'd like again to thank everybody for joining us today and just wanted to leave the call with a few a few comments. Obviously, we've seen significantly improve bidding in 2024 on the on the steel pressure pipe side. And we expect that this kind of environment is going to continue near term, which is really a 2024 thing. But I think the most important thing is we expect this environment really continue for the next three or four or so years, which should create a pretty interesting situation in steel pressure pipe.
And I think longer term, we're well positioned to continue to absorb that those business increases and produce them.
And on the precast side, you know, the 2024, we anticipate we're going to have a stronger 24 than we did 23, even with the macroeconomic pressures that we're seeing and the outlook from the elevated interest rates. So I think we're in a we're in a situation where we said this last call with the consolidation that has happened in the steel pressure pipe business and the entry into the precast business and what that's done and where it's taken us to, it's created a different level of resiliency for this company.
And ultimately, we're seeing that now we had a we had a relatively soft quarter in precast in the quarter, still came in one of the biggest first quarters we've ever seen or the biggest first quarter we've ever seen in the company. So if this would have been several years ago wouldn't have been that way. So that's an important thing to remember. So I again, thank everybody for your time and attention today, and we look forward to speaking with you again in August.
On our second quarter call So thank you very much.

Operator

Thank you. That does conclude today's teleconference and webcast may disconnect your line at this time, and have a wonderful day. We thank you for your participation.