share_log

U.S. Army Awards Electra $1.9 Million Contract for Powered Wind Tunnel Test of Contested Logistics ESTOL Aircraft

PR Newswire ·  Apr 18 08:00
Results from flight testing of Electra's 2-seat experimental tech demonstrator aircraft, ongoing since November 2023, combined with the Army-funded powered wind tunnel test of Electra's prototype contested logistics aircraft design, will inform the final design of Electra's eSTOL product aircraft. (Credit: Electra)
(PRNewsfoto/Electra.aero)
Disclaimer: This content is for informational and educational purposes only and does not constitute a recommendation or endorsement of any specific investment or investment strategy. Read more
    Write a comment