Gelonghui, April 8 | Changjiang Electric Power (600900.SH) announced that according to the company's preliminary statistics, in the first quarter of 2024, the total amount of incoming water from Wudongde Reservoir in the upper reaches of the Yangtze River was about 14.849 billion cubic meters, 7.71% lower than the same period last year; the total amount of incoming water from the Three Gorges Reservoir was about 49.767 billion cubic meters, 4.14% lower than the same period last year.
In the first quarter of 2024, the total power generation capacity of the company's six cascade power plants was about 52,747 billion kilowatt-hours, a decrease of 5.13% over the same period last year. Among them, Wudongde Power Station completed 5.956 billion kilowatt-hours of power generation, an increase of 3.49% over the same period of the previous year; Baihetan Power Station completed 10.738 billion kilowatt-hours, a decrease of 20.79% over the same period of the previous year; the Xiluodu Power Station completed a power generation capacity of 12.171 billion kilowatt-hours, a decrease of 18.65% over the same period last year; the completed power generation capacity of the Three Gorges Power Station was 14.015 billion kilowatt-hours, an increase of 15.79% over the same period last year; Gezhouba The station completed a power generation capacity of 3.43 billion yuan Kilowatt-hours, an increase of 8.94% over the same period last year.