VANCOUVER, BC / ACCESSWIRE / April 20, 2022 / Blue Lagoon Resources Inc. (the "Company") (CSE:BLLG);(FSE:7BL);(OTCQB:BLAGF) is pleased to announce that recent lab results from its 2021 Phase Two program has encountered high-grade vein intercepts, some with visible gold, at the Company's 100% owned, year-round accessible, Dome Mountain Gold Project located a short 50-minute drive from Smithers, B.C.
Highlights:
- 16.8 g/t Au over 0.42 meters, 22.12 g/t Au over 2.14 meters and 33.08 g/t Au over 1.40 meters in hole DM-21-200
- 10.51 g/t Au over 1.05 meters and 14.49 g/t Au over 1.91 meters in hole DM-21-206 with visible gold
Significant assays from new results for holes drilled in the Chance Zone are fully summarized in Table 1. These results continue to show the high degree of prospectivity offered by the Chance Zone and clearly indicate that follow-up drilling is warranted.
Drilling in the Chance Zone was designed to test this northwest trending structural zone for high-grade quartz carbonate veins. Multiple holes were drilled from the same pads at varying azimuths designed to test the boundaries of the structural zone. Recent results show multiple new veins were hit in most holes including DM-21-200 which encountered 16.8 g/t Au over 0.42 meters; 22.12 g/t Au over 2.14 meters and 33.08 g/t Au over 1.40 meters and hole DM-21-206 which encountered 10.51 g/t Au over 1.05 meters and 14.49 g/t Au over 1.91 meters including some intervals displaying visible gold (Figure 1).
Gold mineralization is consistently associated with quartz-carbonate veins displaying pyrite and other sulfides including galena, sphalerite, arsenopyrite and chalcocite. Strong carbonate wall rock alteration is ubiquitous and narrow, zone parallel quartz carbonate veinlets up to 30-50 veins per meter are common in the hangingwall and footwall of mineralized zones.
Hole DM-21-200 was drilled from a pad 275 meters southwest of the pad for holes DM-21-186 (with visible gold) through DM-21-189. Hole 200 was drilled sub-vertical (-85 degrees) and encountered sulfide rich quartz carbonate veins between 77.5 meters to 78.9 meters that contained 10% pyrite and trace to 2% arsenopyrite that grade 33.08 g/t Au and 72.3 g/t Ag.
Hole DM-21-206 was drilled from a pad located 130 meters southeast of hole DM-21-200. Hole 206 was drilled at an azimuth of 235 degrees and at a -50 degree inclination and encountered a 1.91 meters intercept from 101.32 to 103.23 meters, including visible gold at 103.10 meters, that grades 14.49 g/t Au and 29.2 g/t Ag hosted within a quartz carbonate vein with up to 20% pyrite.
"The significance of these intercepts cannot be understated" said Bill Cronk, Chief Geologist for Blue Lagoon Resources. "Most holes drilled thus far have encountered multiple high-grade veins highlighting the fact that there are many new veins for follow up within the prolific newly identified Chance Structural Zone. Only about 1/3 of the strike of this zone has been tested and every single pad drilled to date has resulted in significant gold intercepts," he added.
Figure 1
TABLE 1
*True widths not yet defined
Geological, geochemical and structural data and observations support the current deposit model as a carbonate-hosted, base metal gold (alkali gold) deposit.
QUALITY ASSURANCE AND CONTROL
Core selected for sampling was cut in half with a core saw or split with a hydraulic splitter with one half bagged for shipping. Strict chain of custody storing, and shipping protocol was maintained. All core preparation and analyses were completed by Bureau Veritas Minerals, located in Vancouver, BC. Core was crushed, split, and pulverized with 250 grams passing 200 mesh. Each sample was analyzed for gold by fire assay with ICP-MS finish (BVM code FA350) and for multi-elements by 4-acid digestion ICP with ES finish (BVM code MA250) Any gold overlimits (>10 ppm Au) were analyzed with by gravimetric fire assay (BVM code FA550). Standards and Blanks were inserted by Company staff. The sampling program was undertaken by Company personnel by and under the direction of Lorrie Farrell P.Geo.
The scientific and technical data contained in this news release was approved by William Cronk, P.Geo., a qualified person as defined in NI 43-101 and a consultant to the Company.
For further information, please contact:
Rana Vig
President and Chief Executive Officer
Telephone: 604-218-4766
Email: rana@ranavig.com
The CSE has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. Statement Regarding Forward-Looking Information: This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that Blue Lagoon Resources Inc. (the "Company") expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include results of exploration activities may not show quality and quantity necessary for further exploration and exploitation of minerals deposits, market prices, and continued availability of capital and financing, permitting and other approvals, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.
SOURCE: Blue Lagoon Resources Inc.
View source version on accesswire.com:
バンクーバー、卑詩省/ACCESSWIRE/2022年4月20日/ブルーラグーン資源会社()“会社(CSE:BLG);(FSE:7 BL);(OTCQB:BLAGF)は、2021年第2段階計画の最新の実験室結果が、会社が100%所有する年間到達可能なドーム頂山黄金プロジェクトにおいて高品位鉱脈取得に遭遇し、いくつかはブリティッシュコロンビア州スミソスから車で50分しか離れていない可視金を有することを喜んで発表した。
ポイント:
- 0.42 m以上16.8 g/トン金、2.14 m以上22.12 g/トン金、1.40 m以上33.08 g/トン金DM-21-200井戸では
- 1.05 m以上10.51 g/t Auおよび1.91 m以上14.49 g/t AuDM-21-206ホールに見える金
表1は、機会領域掘削の新しい結果の重要な分析を全面的にまとめており、これらの結果は、機会領域が提供する高い将来性を示し続け、後続の掘削が必要であることを明確に示している。
Chance Zoneの掘削は,この北西方向構造帯の高品位石英炭酸塩鉱脈をテストすることを目的としている。構造領域の境界をテストするために,異なる方位で同じパッドから複数の孔を開けた。最近の結果では,DM−21−200を含む多くの坑井で複数の新しい静脈が打たれていることが示されている0.42 m以上16.8 g/トン金;2.14 m以上22.12 g/トン金;1.40 m以上33.08 g/トン金SとDM-21-206井戸で会いました1.05 m以上10.51 g/t Auおよび1.91 m以上14.49 g/t Auいくつかの間隔表示も含めて 目に見える金(図1).
金鉱化は黄鉄鉱や方鉛鉱,フラッシュ亜鉛鉱,毒砂,輝銅鉱などの他の硫化物を示す石英−炭酸塩鉱脈と一致した。強い炭酸塩岩囲岩侵食は普遍的かつ範囲が狭く、鉱化帯の上盤と下盤によく見られる帯に平行な石英炭酸塩細脈は1メートル当たり30~50本に達する。
DM−21−200孔は、DM−21−186孔(金が見える)からDM−21−189孔までのガスケット南西275 mから掘削されたものである。200孔はほぼ垂直(-85度)のところに入り、77.5~78.9メートルのところで硫化物に富む石英炭酸塩脈に遭遇し、黄鉄鉱を10%、2%の毒砂を含み、Au品位は33.08 g/t、Ag品位は72.3 g/tであった。
DM-21-206孔は、DM-21-200孔の南東130メートルのマットに穿孔されている。206号孔の方位角は235度,傾斜角は−50度,101.32 mから103.23 mまでの距離は1.91 mであり,その中には103.10 mの可視金が含まれており,金の品位は14.49 g/t,銀の品位は29.2 g/tであり,黄鉄鉱含有量が20%に達する石英炭酸塩鉱脈に付与されている.
ブルーラグーン資源会社の首席地質学者ビル·クランク氏は“これらの迎撃の重要性は侮れない”と述べた。“これまで多くの掘削孔が複数の高品位鉱脈に遭遇してきたことは、多産の新たに発見されたChance構造帯には、多くの新しい鉱脈がフォローされているという事実を示している。ベルトの約3分の1の走行しかテストされておらず、これまで掘削されてきた各マットが重大な金捕獲につながっている”と補足した。
図1
表1
*実際の幅は定義されていません
地質、地球化学と構造データと観察結果は現在の鉱床モデルが炭酸塩に付与された卑金属金(アルカリ金)鉱床を支持した。
品質保証と管理
選択的にサンプリングした岩芯は岩心のこぎりで半分に切ったり、油圧分割器で半分を袋詰めして輸送したりした。厳格な保管、貯蔵、そして輸送協定は維持された。すべての岩心準備と分析はブリティッシュコロンビア州バンクーバーにあるBureau Veritas Mineralsによって行われた。芯子は粉砕され、割れ、粉砕され、250 gは200目を通過する。各サンプルは火炎試金分析金(BVM記号FA 350)、多元素分析は4酸分解-ES光沢剤(BVM記号MA 250)を用いた。任意の金の基準値(>10 ppm Au)は重量火災金で分析した(BVM記号FA 550)。基準と空白は会社の従業員によって挿入された。サンプリング計画は会社員がLorrie Farrell P.Geoの指導の下で行った。
本プレスに含まれる科学と技術データはWilliam Cronk,P.Geoによって承認され,NI 43-101で定義された合格者であり,会社のコンサルタントでもある.
もっと情報が必要でしたら、ご連絡ください
ラナ·ヴィグ
社長と最高経営責任者
電話:604-218-4766
メール:raa@ranavigg.com
CSEは本ニュース原稿の十分性や正確性を審査しておらず,何の責任も負わない.展望的情報に関する陳述:本プレスリリースは、いくつかの“前向きな陳述”と見なすことができる陳述を含む。本プレスリリースでは,歴史的事実に関する陳述を除いて,Blue Lagoon Resources Inc.(以下,“会社”と略す)で予想される出来事や発展に関するすべての陳述が前向き陳述である.前向きな陳述は、歴史的事実の陳述ではないが、一般的には、常に“予想”、“計画”、“予想”、“信じる”、“意図”、“推定”、“プロジェクト”、“可能”および同様の表現、またはイベントまたは条件が“将”、“将”、“可能”、“可能”または“すべき”で発生するわけではない。会社はこれらの展望性陳述で表現された期待は合理的な仮定に基づいていると考えているが、これらの陳述は未来の業績を保証することはできず、実際の結果は展望性陳述中の結果と大きく異なる可能性がある。実際の結果と展望性表現中の結果と大きく異なる要素を招く可能性がある要素は、探査活動の結果が、さらなる探査と鉱蔵採掘に必要な品質と数量、市場価格、資本と融資の持続可能性、許可およびその他の承認、ならびに一般経済、市場または商業条件を示していない可能性がある。投資家は、どのような陳述も未来の業績の保証ではなく、実際の結果或いは発展は展望性陳述中の予測と大きく異なる可能性があることに注意してください。前向きな陳述は、会社経営陣が発表の日に述べた信念、見積もり、意見に基づいている。適用される証券法には別の規定があるほか, 経営陣の信念、見積もり又は意見又はその他の要因が変化した場合、会社はこれらの前向き陳述を更新する義務を負わない。
資料源:ブルーラグーン資源会社です。
Accesswire.comでソースコードバージョンを表示する: