VANCOUVER, British Columbia, April 06, 2022 (GLOBE NEWSWIRE) -- Mirasol Resources Ltd. (TSX-V: MRZ) (OTCPK: MRZLF) (the "Company" or "Mirasol") is pleased to report that the Phase IV diamond drilling program has commenced at the Virginia Silver Project ("Virginia") in the province of Santa Cruz, Argentina. Virginia is operated by the Company and funded by Silver Sands Resources Corp. (CSE: SAND; OTCPK: SSRSF) under an option-to-purchase agreement (see News Release May 21, 2020). If the option is exercised, Mirasol will retain a 19.9% equity ownership in Silver Sands and a 3% NSR royalty (with a buydown to 2% for US$2M).
Mirasol's President Tim Heenan commented: "Together with our partner, we continue to aggressively advance the Virginia expansion drill program. The Phase IV program is anticipated to be completed by the end of the field season in late April. The results will support planning for a partner-funded US$3M exploration program expected to start in late 2022 for the final field season under the option agreement."
The Phase IV program will comprise 14 holes for 1,500m, adding to the 8,867m already completed under the partnership with Silver Sands. The results to date have demonstrated the potential to identify significant mineralization outside of the previously delineated deposits (see amended NI 43 -101 technical report titled "Amended Technical Report, Virginia Project, Santa Cruz Province, Argentina - Initial Silver Mineral Resource Estimate" prepared by D. Earnest and M. Lechner and filed on SEDAR on February 29, 2016).
Figure 1: Virginia project and planned drill holes
Phase IV drilling will focus on the following key prospective targets:
- Five drill holes are planned in the southern parts of Ely Central and Ely North to tighten the drill spacing and to close gaps between the Ely North and Ely South deposits. If continuity of mineralization is demonstrated, Ely Central is expected to support the expansion of the resource between the two deposits.
- Two drill holes are planned at Margarita to follow up on the significant silver intersection from the recent Phase III drill campaign, which returned 2.65m at 1,456 g/t Ag in hole MR-DDH-003 (see News Release February 1, 2022). The planned holes will step out 50m and 100m to the northeast and test the potential strike continuity of the mineralization in this structure at the same depth. Deeper holes may also be completed to test the potential downdip extent of the mineralization. Further drilling success at Margarita could significantly add to the current resource at Virginia.
- Two drill holes are planned at Martina NW and Martina Central to test gaps along this trend and between these two zones. Drilling will continue testing the potential continuity of the northwest structure along a high chargeability anomaly.
- Scout drilling is also planned at the Patricia and Daniela targets to test for the potential downdip extension of the mineralized structure below high-grade silver samples collected on surface and in trenches. Surface samples at these prospects have returned the highest silver values to date with up to 29,000 ppm Ag from aligned float blocks (see news release October 29, 2020).
- Finally, three drill holes are planned to follow up on the Santa Rita East target, where drilling to date has only tested the depth extension of these structures to less than 50m vertically below surface.
The results from the Virginia Phase IV drill program will be announced as they are received and interpreted.
About Mirasol Resources Ltd.
Mirasol is a well-funded exploration company focused in Chile and Argentina. Mirasol has seven partner-funded projects, with Newcrest Mining Ltd (Chile), First Quantum Minerals (Chile), Mine Discovery Fund (Chile), Mineria Activa (Chile), Silver Sands Resources (Argentina), Patagonia Gold (Argentina) and Golden Arrow (Argentina). Mirasol is currently self-funding exploration at Sobek (Chile), Inca Gold (Chile) and at a number of early-stage prospects.
For further information, contact:
Tim Heenan, President
or
Jonathan Rosset, VP Corporate Development
Tel: +1 (604) 602-9989
Email: contact@mirasolresources.com
Website:
Qualified Person Statement: Mirasol's disclosure of technical and scientific information in this press release has been reviewed and approved by Tim Heenan (MAIG), the President for the Company, who serves as a Qualified Person under the definition of National Instrument 43-101.
Forward Looking Statements: The information in this news release contains forward looking statements that are subject to a number of known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those anticipated in our forward-looking statements. Factors that could cause such differences include: changes in world commodity markets, equity markets, costs and supply of materials relevant to the mining industry, change in government and changes to regulations affecting the mining industry and to policies linked to pandemics, social and environmental related matters. Forward-looking statements in this release include statements regarding future exploration programs, operation plans, geological interpretations, mineral tenure issues and mineral recovery processes. Although we believe the expectations reflected in our forward-looking statements are reasonable, results may vary, and we cannot guarantee future results, levels of activity, performance or achievements. Mirasol disclaims any obligations to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as may be required by applicable law.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
バンクーバー、ブリティッシュコロンビア州、2022年4月6日(ユニバーサル通信社)-Mirasol Resources Ltd.(トロント証券取引所株式コード:MRZ)(OTCPK:MRZLF)()“会社“または”ミラソール)“第4段階ダイヤモンド掘削計画がアルゼンチン·サンタクルーズ州のバージニアシルバープロジェクト(”バージニア“)で開始されたことを喜んで報告します。バージニアは当社が運営し、銀砂資源会社(CSE:SAND;OTCPK:SSSRSF)がオプション購入協定(2020年5月21日のプレスリリース参照)に基づいて資金を提供します。このオプションを行使すれば、MirasolはSilver Sandsの株式19.9%とNSR特許使用料3%(200万ドルで2%に買い戻し)を保持します。
ミラソールのティム·ヒナン総裁は“バージニア州の拡張掘削プロジェクトをパートナーとともに積極的に推進していく。第4段階プロジェクトは4月末の油田シーズン終了前に完了する予定だ。オプション協定によると、プロジェクトは2022年末に開始され、最後の油田シーズンにパートナーが援助する300万ドルの探査プロジェクトの計画を開始する予定だ”とコメントした
第4期プロジェクトには14ホールの計1500メートルが含まれ、銀沙集団との協力により8867メートルの穴が完成した。これまでの結果は,従来圏で定められていた鉱床以外に重要な鉱化の潜在力が発見されていることが証明されている(改訂後のNI 43−101技術報告を参照し,“改訂された技術報告,アルゼンチンサンタクルーズ州バージニアプロジェクト−銀鉱資源初歩的推定”と題し,D.EarnestとM.Lechnerが作成し,2016年2月29日にSEDARに提出された)。
図1:バージニア州プロジェクトと計画中のドリル
第4段階掘削は、以下の主な予想目標に重点を置く
- 伊利中部と伊利北部南部に5つの掘削孔を掘削して掘削間隔を引き締め、伊利北部と伊利南部鉱蔵との差を埋める予定だ。鉱化の連続性が示されれば,伊利中環は2つの鉱床間の資源拡張を支持することが予想される。
- マルガリータは最近の第3段階掘削活動の重要な銀色の交差点をフォローするために2つの掘削を計画しています。この活動は戻りましたMR-DDH-003孔に2.65 m、1456 g/トン銀(2022年2月1日付プレスリリース参照)。計画中の掘削孔は東北にそれぞれ50メートルと100メートル出て、同じ深さでこの構造における鉱化の潜在的な走行連続性をテストする。鉱化の潜在的な下方傾斜の程度をテストするために、より深い掘削が完了することも可能である。マルガリータの更なる掘削成功はバージニア州の現在の資源を大幅に増加させるかもしれない。
- この傾向とこの2つの地域間の差をテストするために、Martina NWとMartina Centralに2つの穴を掘る予定だ。掘削は引き続き高充電性異常に沿った北西構造の潜在的連続性をテストする。
- PatriciaとDaniela目標で偵察掘削を行い,地表と塹壕で採取した高品位銀様下方鉱化構造の潜在的な下方延長をテストする予定である。これらの探査の前景での表面サンプルは配列された浮動ブロックからこれまで最高の銀価格を返し、銀含有量は29,000 ppmに達した(2020年10月29日のプレスリリース参照)。
- 最後に,サンリータ東部の目標に3つの穴を掘る予定であり,これまでそこの掘削はこれらの構造の深さが地表以下の垂直50メートル未満まで伸びていることのみをテストしてきた。
バージニア第四段階演習プロジェクトの結果は受信されて説明された後に発表されるだろう。
ミゾルについては
Mirasolはチリとアルゼンチンに集中した資金の豊富な探査会社だ。MirasolにはNewcrest鉱業有限公司(チリ)、First Quantum Minerals(チリ)、鉱山発見基金(チリ)、Mineria Activa(チリ)、銀砂資源(アルゼンチン)、パタゴニア金(アルゼンチン)、Golden Arrow(アルゼンチン)の7つのパートナーが援助している。Mirasolは現在ソベック(チリ)、インカ金鉱(チリ)、いくつかの早期探査プロジェクトの自己資金で探査を行っている。
もっと情報を知りたいなら、連絡してください
ティム·ヒナン社長
あるいは…。
企業発展副社長ジョナサン·ロセット
電話:+1(604)602-9989
電子メール:Contact@mirasolresource ces.com
ウェブサイト:
合格者声明:ミラソールが本プレスリリースで開示した技術および科学情報は、国家機器43-101で定義された合格者であるティム·ヒナン社長の審査と承認を得た。
前向き陳述:本プレスリリース中の情報は、多くの既知および未知のリスク、不確実性および他の要因の影響を受ける展望的陳述を含み、これらのリスク、不確実性および他の要素は、実際の結果が私たちの前向き陳述における予想と大きく異なることをもたらす可能性がある。このような違いをもたらす可能性のある要因としては,世界商品市場,株式市場,採鉱業に関連する材料のコストと供給の変化,政府の変化,採鉱業に影響を与える法規や流行病,社会や環境関連事項に関する政策の変化がある。本新聞稿中の展望性陳述は未来の探査計画、運営計画、地質解釈、鉱物保有権問題と鉱物回収過程に関する陳述を含む。私たちは私たちの展望性陳述に反映された予想が合理的であると信じているが、結果は少し違うかもしれないが、私たちは未来の結果、活動レベル、業績或いは成果を保証することができない。法的要件が適用されない限り、Mirasolは、新しい情報、未来のイベント、または他の理由でいかなる前向きな陳述を更新または修正する義務を負わない。
トロント証券取引所創業ボード取引所およびその監督サービス提供者(この用語はトロント証券取引所の政策において定義されている)は、本プレスリリースの十分性または正確性に責任を負わない。