share_log

Defense Metals to Ship Wicheeda Mixed Rare Earth Carbonate Sample to Ucore Rare Metals Inc.

Defense Metals to Ship Wicheeda Mixed Rare Earth Carbonate Sample to Ucore Rare Metals Inc.

国防金属将向Ucore稀有金属公司运送Wicheeda混合稀土碳酸盐样品
PR Newswire ·  01/09 05:00

Vancouver, BC, Jan. 9, 2024 /PRNewswire/ - Defense Metals Corp. ("Defense Metals" or the "Company"; (TSXV: DEFN) (OTCQB: DFMTF) (FSE: 35D) is pleased to announce the Q4-2023 execution of a non-binding Memorandum of Understanding ("MOU") with Ucore Rare Metals Inc. (TSXV: UCU) ("Ucore") to explore collaborative opportunities as both companies move towards their respective commercialization efforts for a North American rare earth element ("REE") supply chain. As one of the first projects under this MOU, Defense Metals will ship a mixed rare earth carbonate sample from its Wicheeda REE project to Ucore's Kingston, Ontario, RapidSX Commercialization and Demonstration Facility ("CDF").

不列颠哥伦比亚省温哥华,2024 年 1 月 9 日 /PRNewswire/-国防金属公司 (”国防金属“或者”公司“; (TSXV: DEFN) (OTCQB: DFMTF) (FSE: 35D) 欣然宣布 Q4-2023 将执行一份不具约束力的谅解备忘录 (”MOU“) 与 Ucore Rare Metals Inc.(多伦多证券交易所股票代码:UCU)(”Ucore“) 在两家公司各自朝着北美稀土元素商业化方向前进的过程中探索合作机会(”REE“)供应链。作为该谅解备忘录下的首批项目之一,国防金属将从其Wicheeda REE项目中向Ucore位于安大略省金斯敦的RapidsX商业化和示范设施运送混合稀土碳酸盐样品(”CDF“)。

SGS Canada Inc. in Lakefield, Ontario, will ship the sample to Ucore's CDF on behalf of Defense Metals. This sample was generated during 2023 hydrometallurgical piloting test work performed on concentrate produced by earlier flotation pilot plant testing of a 26-tonne bulk sample from Defense Metals' wholly-owned Wicheeda REE project in British Columbia.

SGS 加拿大公司 位于安大略省莱克菲尔德的将代表国防金属向Ucore的CDF运送样品。该样本是在2023年湿法冶金试点测试工作中生成的,该精矿是先前浮选试点工厂对国防金属公司在不列颠哥伦比亚省的全资Wicheeda REE项目中测试的26吨散装样品生产的精矿进行的。

Craig Taylor, CEO of Defense Metals, commented:

国防金属首席执行官克雷格·泰勒评论说:

"We expect to ship a mixed rare earth carbonate sample in the next few weeks to Ucore's demonstration plant for testing. The Wicheeda project is being developed as a viable source of REE from North America and as more processing and separation facilities become operational in the future, the demand for REE feedstock will be increasingly important. This MOU with Ucore is a further step in that direction to be part of the Western world's REE supply chain."

“我们预计将在未来几周内将混合稀土碳酸盐样品运送到Ucore的示范工厂进行测试。Wicheeda项目正在开发作为北美稀土的可行来源,随着未来越来越多的加工和分离设施投入运营,对稀土原料的需求将变得越来越重要。与Ucore的谅解备忘录是朝着成为西方世界稀土供应链一部分的方向迈出的又一步。”

Pat Ryan, P.Eng., Chairman and CEO of Ucore, stated:

Ucore董事长兼首席执行官P.Eng. P.Eng. P.Eng表示:

"The opportunity to align closer with Defense Metals is strategically important. The MOU lays out the framework wherein Defense Metals' technically strong and readily accessible North American REE resource can be further processed and refined using Ucore's Canadian-founded technology, RapidSX. Receiving the sample mixed rare earth carbonate at our Kingston CDF will start the process of determining what may be possible between the companies as we collectively look to fuel the 21st-century energy transition."

“与国防金属紧密结盟的机会具有重要的战略意义。谅解备忘录列出了一个框架,在该框架中,可以使用Ucore在加拿大创立的技术RapidSX进一步处理和提炼国防金属技术强大且易于获得的北美稀土资源。在我们的金士顿CDF接收混合稀土碳酸盐样本将开始确定两家公司在共同寻求推动21世纪能源转型时可能实现的目标。”

Qualified Person
合格人员

The scientific and technical information contained in this news release as it relates to the Wicheeda REE Project has been reviewed and approved by Kristopher J. Raffle, P.Geo. (B.C.), Principal and Consultant of APEX Geoscience Ltd. of Edmonton, Alberta, and a consultant to the Company, who is a "Qualified Person" as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

本新闻稿中包含的与Wicheeda REE项目有关的科学和技术信息已由P.Geo的Kristopher J. Raffle审查和批准。(不列颠哥伦比亚省),艾伯塔省埃德蒙顿市APEX Geoscience Ltd.的负责人兼顾问,也是该公司的顾问,根据国家仪器43-101的定义,他是 “合格人员” — 矿产项目披露标准

About the Wicheeda Rare Earth Element Project
关于 Wicheeda 稀土元素项目

Defense Metals' 100% owned, 8,301-hectare (~20,534-acre) Wicheeda REE Project is located approximately 80 km northeast of the city of Prince George, British Columbia; population 77,000. Wicheeda is readily accessible by all-weather gravel roads and is near infrastructure, including hydro power transmission lines and gas pipelines. The nearby Canadian National Railway and major highways allow easy access to the port facilities at Prince Rupert, the closest major North American port to Asia.

国防金属公司100%拥有的占地8,301公顷(约20,534英亩)的Wicheeda REE项目位于不列颠哥伦比亚省乔治王子市东北约80公里处;人口77,000。Wicheeda可通过全天候的碎石路轻松抵达,并且靠近包括水力输电线路和天然气管道在内的基础设施。附近的加拿大国家铁路和主要高速公路可轻松前往鲁珀特王子港的港口设施,鲁珀特王子港是距离亚洲最近的北美主要港口。

About Defense Metals Corp.
国防金属公司简介

Defense Metals Corp. is a mineral exploration and development company focused on the development of its 100% owned Wicheeda Rare Earth Element Deposit located near Prince George, British Columbia, Canada. Defense Metals Corp. trades on the TSX Venture Exchange under the symbol "DEFN", in the United States, trading symbol "DFMTF" on the OTCQB and in Germany on the Frankfurt Exchange under "35D".

国防金属公司是一家矿产勘探和开发公司,专注于开发其100%拥有的Wicheeda稀土元素矿床,该矿床位于加拿大不列颠哥伦比亚省乔治王子附近。国防金属公司在多伦多证券交易所风险交易所交易代码为 “DEFN”,在美国,在OTCQB上交易代码为 “DFMTF”,在德国法兰克福交易所以 “35D” 进行交易。

Defense Metals is a proud member of Discovery Group. For more information please visit:

国防金属很荣幸成为探索集团的成员。欲了解更多信息,请访问:

For further information, please visit or contact:

欲了解更多信息,请访问 或者联系:

Todd Hanas, Bluesky Corporate Communications Ltd.
Vice President, Investor Relations
Tel: (778) 994 8072
Email: [email protected]

托德·哈纳斯,蓝天企业传播有限公司
投资者关系副总裁
电话:(778) 994 8072
电子邮件:[电子邮件保护]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

多伦多证券交易所风险交易所及其监管服务提供商(该术语在多伦多证券交易所风险交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Cautionary Statement Regarding "Forward-Looking" Information
关于 “前瞻性” 信息的警示声明

This news release contains "forward–looking information or statements" within the meaning of applicable securities laws, which may include, without limitation, statements relating to advancing the Wicheeda REE Project, the expected shipment of the sample to Ucore and the expected timeline, the potential collaboration with Ucore, the technical, financial and business prospects of the Company, its project and other matters. All statements in this news release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of rare earth elements, the anticipated costs and expenditures, accuracy of assay results, performance of available laboratory and other related services, future operating costs, interpretation of geological, engineering and metallurgical data, the ability to achieve its goals, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms. Such forward-looking information reflects the Company's views with respect to future events and is subject to risks, uncertainties and assumptions, including the risks and uncertainties relating to the interpretation of exploration, engineering and metallurgical results, risks related to the inherent uncertainty of exploration, metallurgy and development and cost estimates, the potential for unexpected costs and expenses and those other risks filed under the Company's profile on SEDAR+ at . While such estimates and assumptions are considered reasonable by the management of the Company, they are inherently subject to significant business, economic, competitive and regulatory uncertainties and risks. Factors that could cause actual results to differ materially from those in forward looking statements include, but are not limited to, continued availability of capital and financing and general economic, market or business conditions, adverse weather and climate conditions, failure to maintain or obtain all necessary government permits, approvals and authorizations, failure to maintain community acceptance (including First Nations), risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of personnel, materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters), risks relating to inaccurate geological, metallurgical and engineering assumptions, decrease in the price of rare earth elements, the impact of Covid-19 or other viruses and diseases on the Company's ability to operate, the price of commodities, capital market conditions, restriction on labour and international travel and supply chains, loss of key employees, consultants, or directors, increase in costs, delayed results, litigation, and failure of counterparties to perform their contractual obligations. The Company does not undertake to update forward–looking statements or forward-looking information, except as required by law.

本新闻稿包含适用证券法所指的 “前瞻性信息或陈述”,其中可能包括但不限于与推进Wicheeda REE项目、预计向Ucore运送样本和预期时间表、与Ucore的潜在合作、公司的技术、财务和业务前景、其项目和其他事项相关的声明。除历史事实陈述外,本新闻稿中所有涉及公司预计将发生的事件或事态发展的陈述均为前瞻性陈述。尽管公司认为此类前瞻性陈述中表达的预期是基于合理的假设,但此类陈述并不能保证未来的业绩,实际业绩可能与前瞻性陈述中的业绩存在重大差异。此类陈述和信息基于对当前和未来业务战略以及公司未来运营环境的众多假设,包括稀土元素的价格、预期的成本和支出、化验结果的准确性、可用实验室和其他相关服务的绩效、未来的运营成本、对地质、工程和冶金数据的解释、实现目标的能力、总体业务和经济状况不会在重大不利的情况下发生变化顺便说一句,在需要时以合理的条件提供资金。此类前瞻性信息反映了公司对未来事件的看法,受风险、不确定性和假设的影响,包括与勘探、工程和冶金结果解释相关的风险和不确定性、与勘探、冶金和开发和成本估算固有不确定性相关的风险、意外成本和开支的潜在风险以及根据公司在SEDAR+的简介中提交的其他风险。尽管公司管理层认为此类估计和假设是合理的,但它们本质上会受到重大的业务、经济、竞争和监管不确定性和风险的影响。可能导致实际业绩与前瞻性陈述存在重大差异的因素包括但不限于资本和融资的持续可用性以及总体经济、市场或商业状况、恶劣的天气和气候条件、未能维持或获得所有必要的政府许可、批准和授权、未能保持社区认可(包括原住民)、与意想不到的运营困难相关的风险(包括设备或流程未能按照规定运行)规格或预期、成本上涨、人员、材料和设备不可用、政府行动或延迟收到政府批准、工业动乱或其他工作行动,以及与健康、安全和环境问题相关的意外事件)、与不准确的地质、冶金和工程假设相关的风险、稀土元素价格的下跌、Covid-19或其他病毒和疾病对公司运营能力的影响、大宗商品价格、资本价格市场状况,限制劳动力、国际旅行和供应链、关键员工、顾问或董事流失、成本增加、业绩延迟、诉讼以及交易对手未能履行合同义务。除非法律要求,否则公司不承诺更新前瞻性陈述或前瞻性信息。

All information in this news release concerning Ucore has been provided for inclusion herein by Ucore. Although the Company has no knowledge that would indicate that any information contained herein concerning Ucore is untrue or incomplete, the Company assumes no responsibility for the accuracy or completeness of any such information.

本新闻稿中有关Ucore的所有信息均由Ucore在此处提供。尽管公司不知道会表明此处包含的有关Ucore的任何信息不真实或不完整,但公司对任何此类信息的准确性或完整性不承担任何责任。

SOURCE Defense Metals Corp.

来源:国防金属公司

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发