1.17% Ni, 0.80% Cu, 0.08% Co, 1.46 ppm Pd and 0.23 ppm Pt over 25.86m in PN-22-009
Including 11.00m @ 1.50% Ni, 0.93% Cu, 0.10% Co, 1.85 ppm Pd and 0.36 ppm Pt
and 1.80m @ 1.97% Ni, 0.41% Cu, 0.14% Co and 2.03 ppm Pd
Highlights
- Recent assay results from the current drill program at the Nisk deposit continue to return high-grade Ni-Cu- Co sulfide and PGE mineralization.
- Significant results from this batch of assays include:
- 25.86m @ 1.17% Ni, 0.80% Cu, 0.08% Co, 1.46 ppm Pd and 0.23 ppm Pt (PN-22-009)
- And: 11.00m @ 1.50% Ni, 0.93% Cu, 0.10% Co, 1.85 ppm Pd and 0.36 ppm Pt
- Including 1.80m @ 1.97% Ni, 0.41% Cu, 0.14% Co, 2.03 ppm Pd
- Visual observations of the core confirm semi-massive to massive sulfide mineralization in holes PN-22-008, PN-22-010, PN-22-012 and PN-22-017
- Mineralization intercepted 150m below the deepest known intercepts
- Drilling is to be extended by another 7,500 m to 10,000 m in Q1 2023
TORONTO, ON / ACCESSWIRE / November 27, 2022 / Power Nickel Inc. (the "Company" or "Power Nickel") (TSX-V:PNPN, OTCQB:CMETF, Frankfurt:IVVI) is pleased to announce initial results from its current drill program at its "Nisk" project near James Bay. These initial drill results confirm the presence of high-grade Ni-Cu-Co-PGE mineralization in the Nisk Main zone and extends mineralization by an additional 150 m at depth and to the east and below to the central portion.
While assay results are still pending for most of the holes drilled to date, results received so far are very encouraging and continue to demonstrate the robustness of the system. Table 1 below presents the significant results received to date.
Table 1: Significant results from the current 2022 drilling program.
Hole ID | UTM E1 | UTM N1 | Length (m) | Azimuth (°) | Dip (°) | From (m) | To (m) | Interval Length(m)2 | Ni (%) | Cu (%) | Co (%) | Pd (g/t) | Pt (g/t) |
PN-22-008 | 459978 | 5728698 | 408 | 159 | -73 | | | | PENDING |
PN-22-0094 | 459889 | 5728656 | 411 | 160 | -73 | 337.70 | 363.56 | 25.86 | 1.17 | 0.80 | 0.08 | 1.46 | 0.23 |
Including | | | | | | 337.70 | 342.00 | 4.30 | 1.28 | 0.56 | 0.09 | 1.88 | 0.20 |
and | | | | | | 344.75 | 355.75 | 11.00 | 1.50 | 0.93 | 0.10 | 1.85 | 0.36 |
PN-22-0103 | 459948 | 5728683 | 327 | 160 | -68 | | | | PENDING |
PN-22-011 | 459857 | 5728679 | 355 | 164 | -60 | | | | PENDING |
PN-22-012 | 459709 | 5728637 | 465 | 160 | -75 | | | | PENDING |
PN-22-0133 | 459623 | 5728604 | 480 | 154 | -78 | 475.00 | 479.70 | 4.70 | 1.11 | 0.54 | 0.09 | 0.58 | 0.07 |
Including | | | | | | 476.00 | 478.50 | 2.50 | 1.60 | 0.54 | 0.13 | 0.65 | 0.06 |
PN-22-0143 | 460001 | 5728714 | 516 | 160 | -80 | | | | PENDING |
PN-22-0153 | 460176 | 5728829 | 544 | 160 | -75 | | | | PENDING |
PN-22-0163 | 460313 | 5728831 | 321 | 157 | -63 | | | | PENDING |
PN-22-0173 | 459534 | 5728554 | 333.5 | 156 | -68 | | | | PENDING |
PN-22-018 | 459534 | 5728552 | 465 | 180 | -70 | | | | PENDING |
- UTM NAD83, Zone 18N.
- True widths are estimated to be 60 to 70% of the Interval Length.
Eleven (11) holes are completed to date for this second phase of drilling, but assay results covering the mineralized target area are available only for two (2) holes (Figure 1).
Figure 1 - Longitudinal view of the Nisk Main presenting the currently available assay results.
Core logging has confirmed the presence of sulfide mineralization in the areas defined as targets. Such visual observation indicates that the mineralization extends to a minimum of 150 metres below the deepest know intercepts.
While such intercepts look promising, their description is based solely on visual logging of the core, for which assay results are pending. The presence of nickel is supported by XRF measurements made as part of the core logging procedure, but such readings should be considered indicative only. Caution is therefore required as interpreted extent of the mineralization should also be determined once assay results are available. The company will update the market once these results become available.
"The initial assays of our fall program are very encouraging for Power Nickel shareholders. These holes were drilled in an area where no resource was modeled and as a result, will not only help us better understand our deposit but also of course add substantial tonnage to our model.
The PN-22-009 hole in particular shows that there will be solid very high-grade sections of the deposit which will raise resource grade and improve economics in any future mine plan.
From what we have seen in this drilling round we believe our aspiration to become Canada's next Nickel mine is something our drill bit is turning into a very high probability outcome. When compared with other high-grade Nickel sulfides exploration projects around the world, ours trades at a tenth or much less of the value. Results like this will hopefully cause investors to look at Power Nickel and Nisk in a new light." - Commented CEO Terry Lynch.
Figure 2 below presents the holes completed and those that are remaining to be drilled from the current 2022 drilling program
Figure 2 - Current status of the 2022 Drilling Program at Nisk.
On the basis of such optimistic results, the Company has recently announced (see Press Release of November 22th, 2022) that it would ramp up drilling by another 7,500m to 10,000m starting in Q1 2023.
About the Nisk Project
The Nisk Project is located in the southern portion of the Eeyo Istchee James Bay territory, Québec, a region that is the site of a number of mining projects (Figure 3) and improving infrastructure (Figure 4).1
The Nisk Project is a known Nickel-PGE occurrence on which former operators have performed technical work at a relatively high level of expertise. This historical work, which included preliminary metallurgical test work, led to an evaluation of the mineral resource potential in the Nisk-1 Main zone.
The existing resource estimates at the Nisk project are of historic nature and the Company's geology team has not completed sufficient work to confirm a NI 43-101 compliant mineral resource. Therefore, caution is appropriate since these historic estimates cannot, and should not be relied on. For merely informational purposes see Table 2.
Table ‑2: Historical Resource Estimate figures for respective confidence categories at the NISK-1 deposit, After RSW Inc 2009: Resource Estimate for the NISK-1 Deposit, Lac Levac Property, Nemiscau, Québec.
The information regarding the NISK-1 deposit was derived from the technical report titled "Resource Estimate for the NISK-1 Deposit, Lac Levac Property, Nemiscau, Québec" dated December 2009. The key assumptions, parameters, and methods used to prepare the mineral resource estimates described above are set out in the technical report. This report, prepared by RSW Inc in 2009, can be found on the SEDAR website.
The information regarding the metallurgical test work done to support the above-cited 2009 MRE, was performed by SGS and is described in an undisclosed report titled: "11863-001: An investigation into the recovery of Ni, Cu and PGMs from the Lac Levac deposit, prepared for Golden Goose Resources, July 22, 2009".
Power Nickel completed the acquisition of its option to acquire up to 80% of the Nisk Project from Critical Elements Lithium Corp. (CRE: TSXV). The Nisk Project comprises a large land position (20 kilometers of strike length) with numerous high-grade Nickel intercepts. Since the completion of the option, Power Nickel retained 3DGeo Solution Inc to create a geological model of the Nisk Project and used this as a guide to the very successful initial Power Nickel 2400-metre drill program completed last December and reported in March of 2022. (See Figure 5 and Table 3 below, modified from the Press Release dated March 30, 2022).
Figure 3 - Location of the Nisk Project with respect to the location of other known deposits.
Figure 4 - Location of the Nisk Project with respect to the current infrastructure available in the area.
Figure 5. A long section of the 2021 drill program results.
Table 3: Significant results obtained during the 2021 drilling campaign.
*UTM NAD83, Zone 18N
**True widths are estimated to be 70 to 90% of the core length
QAQC and SAMPLING
GeoVector Management Inc is the Consulting company retained to perform the actual drilling program, which includes core logging and sampling of the drill core.
All samples were submitted to and analyzed at ALS Global ("ALS"), an independent commercial laboratory located in Val-d'Or, Québec for both the sample preparation and assaying. ALS is a commercial laboratory independent of Power Nickel with no interest in the Project. ALS is an ISO 9001 and 17025 certified and accredited laboratory. Samples submitted through ALS are run through standard preparation methods and analyzed using ME-ICP61a (33 element Suite; 0.4g sample; Intermediate Level Four Acid Digestion) and PGM-ICP27 (Pt, Pd, and Au; 30g fire assay and ICP-AES Finish) methods. ALS also undertakes its own internal coarse and pulp duplicate analysis to ensure proper sample preparation and equipment calibration.
GeoVector's QAQC program includes the regular insertion of CRM standards, duplicates, and blanks into the sample stream with a stringent review of all results.
The results presented in the current Press Released are complete within the mineralized intervals, but results are still pending for the top portion of both holes reported. QAQC and data validation was performed on these portions of the holes where assays are fully integrated, and no material error was observed.
Qualified Person
Kenneth Williamson, Géo, M.Sc. from 3DGeo Solution Inc and consultant to Power Nickel, is the independent qualified person who has reviewed and approved the technical disclosure contained in this news release.
About Power Nickel Inc.
Power Nickel is a Canadian junior exploration company focusing on high-potential copper, gold, and battery metal prospects in Canada and Chile.
On February 1, 2021, Power Nickel (then called Chilean Metals) completed the acquisition of its option to acquire up to 80% of the Nisk project from Critical Elements Lithium Corp. (CRE: TSXV)
The NISK property comprises a large land position (20 kilometers of strike length) with numerous high-grade intercepts. Power Nickel is focused on expanding its current high-grade nickel-copper PGE mineralization Ni 43-101 resource with a series of drill programs designed to test the initial Nisk discovery zone and to explore the land package for adjacent potential Nickel deposits.
Power Nickel announced on June 8th, 2021 that an agreement has been made to complete the 100% acquisition of its Golden Ivan project in the heart of the Golden Triangle. The Golden Triangle has reported mineral resources (past production and current resources) in a total of 67 million ounces of gold, 569 million ounces of silver, and 27 billion pounds of copper. This property hosts two known mineral showings (gold ore and Magee), and a portion of the past-producing Silverado mine, which was reportedly exploited between 1921 and 1939. These mineral showings are described to be Polymetallic veins that contain quantities of silver, lead, zinc, plus/minus gold, and plus/minus copper.
Power Nickel is also 100 percent owner of five properties comprising over 50,000 acres strategically located in the prolific iron-oxide-copper-gold belt of northern Chile. It also owns a 3-per-cent NSR royalty interest on any future production from the Copaquire copper-molybdenum deposit, which was sold to a subsidiary of Teck Resources Inc. Under the terms of the sale agreement, Teck has the right to acquire one-third of the 3-per-cent NSR for $ 3 million at any time. The Copaquire property borders Teck's producing Quebrada Blanca copper mine in Chile's first region.
For further information on Power Nickel Inc., please contact:
Mr. Terry Lynch, CEO
647-448-8044
terry@powernickel.com
For further information, readers are encouraged to contact:
Power Nickel Inc.
The Canadian Venture Building
82 Richmond St East, Suite 202
Toronto, ON
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.
Cautionary Note Regarding Forward-Looking Statements
This news release contains certain statements that may be deemed "forward-looking statements" with respect to the Company within the meaning of applicable securities laws. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential", "indicates", "opportunity", "possible" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, are subject to risks and uncertainties, and actual results or realities may differ materially from those in the forward-looking statements. Such material risks and uncertainties include, but are not limited to, the Company's ability to raise sufficient capital to fund its planned activities at the NISK Property and for general working capital purposes; the timing and costs of future activities on the Company's properties; maintaining its mineral tenures and concessions in good standing; changes in economic conditions or financial markets; the inherent hazards associates with mineral exploration and mining operations; future prices of metals; changes in general economic conditions; accuracy of mineral resource and reserve estimates; the potential for new discoveries; the ability of the Company to obtain the necessary permits and consents required to explore, drill and develop the projects and if obtained, to obtain such permits and consents in a timely fashion relative to the Company's plans and business objectives for the projects; the general ability of the Company to monetize its mineral resources; and changes in environmental and other laws or regulations that could have an impact on the Company's operations, compliance with environmental laws and regulations, dependence on key management personnel and general competition in the mining industry. Forward-looking statements are based on the reasonable beliefs, estimates, and opinions of the Company's management on the date the statements are made. Except as required by law, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.
1References to nearby properties is for information purposes only and there is no assurance that Power Nickel will achieve the same results as on the nearby properties.
SOURCE: Power Nickel Inc.
View source version on accesswire.com:
PN−22−009では,25.86 m以上1.17%ニッケル,0.80%銅,0.08%コバルト,1.46 ppm Pdと0.23 ppm白金であった
11.00 m@1.50%ニッケル、0.93%銅、0.10%コバルト、1.85 ppmパラジウム、0.36 ppm白金を含む
1.80 M@1.97%ニッケル、0.41%銅、0.14%コバルト、および2.03 ppm Pd
ハイライト
- Nisk鉱床は現在掘削計画の最新検査結果を引き続き高品位のNi−Cu−Co硫化物とPGE鉱化に戻した。
- この検査の重要な結果は
- 25.86 M@1.17%ニッケル、0.80%銅、0.08%コバルト、1.46 ppm Pdおよび0.23 ppm白金(PN-22-009)
- 和:11.00 M@1.50%ニッケル、0.93%銅、0.10%コバルト、1.85 ppm Pdおよび0.36 ppm白金
- 1.80 M@1.97%ニッケル、0.41%銅、0.14%コバルト、2.03 ppm Pdを含む
- 岩心の目視観察では,PN−22−008,PN−22−010,PN−22−012とPN−22−017孔に半塊状から塊状硫化物鉱化が存在することが確認された
- 鉱化は既知の最も深い切片で150メートルで傍受されました
- 2023年第1四半期、掘削はさらに7500メートルから10000メートル延長されます
トロント,ON/ACCESSWIRE/2022年11月27日/Power Nickel Inc.(“会社”または“電力ニッケル”)(トロント証券取引所:PNPN,OTCQB:CMETF,フランクフルト:IVVI)ジェームズ湾付近の“Nisk”プロジェクトの掘削計画の初歩的な結果を発表することができて嬉しい。これらの予備掘削結果は,Nisk主帯に高品位なNi−Cu−Co−PGEが鉱化し,鉱化深さを東と下方に150 mから中部まで延長していることを確認した。
これまで,穿孔の検査結果の多くは未解決のままであったが,これまでに得られた結果は非常に鼓舞的であり,このシステムの頑強性を証明し続けてきた。以下の表1にこれまでに得られた重要な成果を示す.
表1:現在の2022年掘削計画の重大な成果。
孔ID | UTM E1 | UTM N1 | 長さ(メートル) | 方位角(°) | 傾斜角(°) | 送信者(M) | (M)まで | 区間長(m)2 | ニッケル(%) | CU(%) | CO(%) | PD(g/トン) | PT(g/トン) |
PN−22−008 | 459978 | 5728698 | 408 | 159 | -73 | | | | 決を待つ |
PN-22-0094 | 459889 | 5728656 | 411 | 160 | -73 | 337.70 | 363.56 | 25.86 | 1.17 | 0.80 | 0.08 | 1.46 | 0.23 |
含まれています | | | | | | 337.70 | 342.00 | 4.30 | 1.28 | 0.56 | 0.09 | 1.88 | 0.20 |
そして | | | | | | 344.75 | 355.75 | 11.00 | 1.50 | 0.93 | 0.10 | 1.85 | 0.36 |
PN-22-0103 | 459948 | 5728683 | 327 | 160 | -68 | | | | 決を待つ |
PN-22-011 | 459857 | 5728679 | 355 | 164 | -60 | | | | 決を待つ |
PN-22-012 | 459709 | 5728637 | 465 | 160 | -75 | | | | 決を待つ |
PN-22-0133 | 459623 | 5728604 | 480 | 154 | -78 | 475.00 | 479.70 | 4.70 | 1.11 | 0.54 | 0.09 | 0.58 | 0.07 |
含まれています | | | | | | 476.00 | 478.50 | 2.50 | 1.60 | 0.54 | 0.13 | 0.65 | 0.06 |
PN-22-0143 | 460001 | 5728714 | 516 | 160 | -80 | | | | 決を待つ |
PN-22-0153 | 460176 | 5728829 | 544 | 160 | -75 | | | | 決を待つ |
PN-22-0163 | 460313 | 5728831 | 321 | 157 | -63 | | | | 決を待つ |
PN-22-0173 | 459534 | 5728554 | 333.5 | 156 | -68 | | | | 決を待つ |
PN-22-018 | 459534 | 5728552 | 465 | 180 | -70 | | | | 決を待つ |
- UTM NAS 83、18 N区。
- 真の幅は間隔長の60%から70%と推定される.
これまで,第2段階の掘削は11(11)個の孔が完了していたが,鉱化標的領域を覆う検査結果は2(2)個の孔しかなかった(図1)。
図1−現在利用可能なアッセイ結果のNISK主縦断面図を示す。
岩心測井は目標区として定義された領域に硫化物鉱化が存在することが確認されている。この目視観察により,鉱化は既知の最深捕獲点の下方少なくとも150メートルまで延びていることが示唆された。
このような遮断は有望に見えるが,それらの記述は岩心の可視記録に完全に基づいており,その分析結果は不明である。岩心検井プログラムの一部として行われるXRF測定はニッケルの存在を支持するが,この読み取りは指示的読み取りのみと見なすべきである。したがって,解析結果が利用可能になると,鉱化の解釈範囲も決定すべきであるため慎重である必要がある。このような結果が出ると、同社は市場状況を更新するだろう。
私たちの秋の計画の予備分析は、Power Nickelの株主にとって非常に鼓舞的である。これらの穴は、資源をモデル化していない地域で掘削されているので、私たちの鉱物をよりよく理解するのを助けるだけでなく、もちろん私たちのモデルのために大量のトン数を増加させるだろう。
特にPN−22−009孔は,この鉱床に強固な極めて高品位区間があることを示しており,将来の任意の採鉱計画において資源品位の向上と経済効果の改善につながる。
私たちがこの掘削で見た状況から、私たちはカナダの次のニッケル鉱になりたいという願いが私たちのドリルが実現する可能性が高い結果だと信じている。世界の他の高品位硫化ニッケル探査プロジェクトに比べて、私たちの取引価格はその価値の10分の1以下である。このような業績は,投資家がPower NickelとNiskを新たな視点で見ることが期待される。
次の図2は、完成した掘削孔と、現在の2022年掘削計画において掘削される掘削孔とを示している
図2−NISKの2022年掘削計画の現状。
このような楽観的な結果に基づき、同社は最近、2023年第1四半期からさらに7,500メートルから10,000メートルの掘削を追加すると発表した(2022年11月22日のプレスリリース参照)。
Niskプロジェクトについて
Niskプロジェクトはケベック州Eeyo Istchee James Bay地域の南部にあり、この地域には多くの採鉱プロジェクトがある(図3)とインフラの改善(図4).1
Niskプロジェクトは既知のニッケル-PGEプロジェクトであり、前事業者はこのプロジェクト上で比較的高い専門レベルで技術作業を展開した。この歴史的な仕事は、初歩的な冶金テストを含み、NISK-1主区の鉱物資源の潜在力を評価した。
Niskプロジェクトの既存の資源評価は歴史的であり、会社の地質チームはNI 43-101標準に適合する鉱物資源を確認するのに十分な仕事を終えていない。したがって、このような歴史的な推定は依存してはいけないので、慎重さは適切だ。参考までに表2を参照されたい.
表2:2009年にRSW Inc.が成立した後,NISK−1鉱床の各信頼種別の履歴資源推定数:ケベック内ミスコーラックLevac財産NISK−1鉱床の資源推定。
NISK−1鉱物に関する情報は,2009年12月に“ケベック内ミス考Lac Levac地産NISK−1鉱物の資源推定”と題する技術報告に由来している。技術報告では,上記鉱物資源推定を作成するための主な仮定,パラメータ,方法を示した。この報告書は2009年にRSW Inc.によって作成され、SEDARサイトで見つけることができる。
上記2009年MREを支援するために行った冶金試験作業に関する情報はSGSによって実行され,“11863−001:Lac Levac鉱床からニッケル,銅,白金族金属を回収する調査”と題する未開示報告書に記載されており,2009年7月22日に書かれたGolden Goose Resourcesである。
Power NickelはCritical Elements Lithium Corp.(CRE:TSXV)からNiskプロジェクトの80%に達する株式を買収する選択権を完成した。Niskプロジェクトには大きな陸上陣地(20キロの走行長さ)が含まれており、多くの高品位ニッケル迎撃がある。このオプションが完了した後、Power Nickelは3 DGeo Solution Incを招いてNiskプロジェクトの地質モデルを作成し、昨年12月に完成し、2022年3月に報告された非常に成功した初期Power Nickel 2400メートル掘削プロジェクトのガイドラインとした。(以下の図5および表3を参照して、日付が2022年3月30日のプレスリリースに基づいて修正される)。
図3−NISKプロジェクトの他の既知鉱物に対する位置。
この地域の既存インフラに対する図4−NISKプロジェクトの位置。
図5.2021年演習計画結果の大部分。
表3:2021年の掘削活動期間中に得られた大きな成果。
*UTM NAS 83,18 Nエリア
**コア長の70%~90%の真の幅の推定
QAQCとサンプリング
GeoVectorManagement Inc.は、岩心掘削とコアサンプリングを含む実際の掘削計画を実行するために雇われたコンサルティング会社である。
すべてのサンプルは、ケベック州Val-d‘Orに位置する独立商業実験室ALS Global(“ALS”)に提出され、サンプル調製および分析を行った。ALSはPower Nickelから独立した商業実験室であり、このプロジェクトには興味がない。ALSはISO 9001と17025認証と認可された実験室だ。ALSによって提出された試料は、標準的な製造方法で動作し、ME−ICP 61 a(33元素キット;0.4 g試料;中間四次酸消化)およびPGM−ICP 27(白金、パラジウムおよび金;30 g火炎分析および誘導結合プラズマ発光分光分析)方法を用いて分析した。ALSはまた、適切なサンプル準備およびデバイス較正を確保するために、自己の内部粗さおよびパルプ反復分析を行う。
GeoVectorのQAQC計画は,定期的にサンプルフローにCRM基準,コピー,空白を挿入し,すべての結果を厳密に審査することを含む.
現在発表されているプレスリリースで公表されている結果は鉱化間隔内で完全であるが、報告された2つの孔の上部の結果は未解決のままである。完全に集積された穴を分析したこれらの部分についてQAQCとデータ検証を行ったが,大きな誤りは観察されなかった。
資格のある人
ケネス·ウィリアムソンGéo M.S.C.3 DGeo Solution Inc.からPower Nickelまでのコンサルタントは、本プレスリリースに含まれる技術開示を審査および承認する独立した合格者である。
Power Nickel Inc.について
Power Nickelはカナダの一次探査会社で、カナダとチリの高い潜在力の銅、金と電池金属探査に集中している。
2021年2月1日、Power Nickel(当時チリ金属会社と呼ばれていた)はCritical Elements Lithium Corp.(CRE:TSXV)からNiskプロジェクトの80%株式を買収する選択権を完成した
NISKの財産には大きな陸上陣地(20キロの打撃長)が含まれており、多くの高度な迎撃がある。Power Nickelは一連の掘削計画を通じて現在の高品位ニッケル銅PGE鉱化ニッケル43-101資源を拡大することに集中し、最初のNisk発見区をテストし、潜在ニッケル鉱に隣接する陸包を探査することを目的としている。
6月8日に発表されたPower Nickelこれは…。2021年には、金三角センターに位置するGolden Ivanプロジェクトの100%買収を完了することで合意された。金三角報告の鉱物資源(過去の生産と現在の資源)には合計6700万オンスの金、5.69億オンスの銀、270億ポンドの銅がある。ここには2つの既知の鉱物(金鉱とMagee)と,過去に生産されたSilverado鉱の一部があり,1921年から1939年の間に採掘されたと報告されている。これらの鉱脈は多金属鉱脈として記述され、大量の銀、鉛、亜鉛、プラス/減金、およびプラス/減銅を含む。
Power Nickelは5つの不動産を100%所有しており、総面積は50,000エーカーを超え、戦略的にチリ北部の多産鉄酸化物銅金鉱帯に位置している。また、コパキール銅モリブデン鉱の将来の任意の生産に対して、Teck Resources Inc.の子会社に売却されたNSR特許使用料の3%の権益を持っている。売却協定の条項によると、Teckは3%のNSR特許使用料をいつでも300万ドルで買収する権利がある。コパキール銅鉱はテークがチリ第一地域で生産したQuebrada Blanca銅鉱に隣接している。
Power Nickel社についてもっと知りたいのですが、ご連絡ください
CEO Terry Lynchさん
647-448-8044
メール:terry@Powerickel.com
さらなる資料が必要でしたら、読者からのご連絡をお待ちしております
Powerニッケル社です。
カナダベンチャービル
リッチモンド通り東82号202号スイート
トロントです
トロント証券取引所創業ボード取引所およびその監督サービス提供者(この用語はトロント証券取引所の政策において定義されている)は、本プレスリリースの十分性または正確性に責任を負わない。
前向き陳述に関する注意事項
本プレスリリースに含まれるいくつかの陳述は、証券法の適用が指す会社に関する“前向き陳述”と考えられる可能性がある。前向き表現は、歴史的事実ではない表現を意味するが、一般に、常に“予想”、“計画”、“予想”、“信じる”、“意図”、“推定”、“プロジェクト”、“潜在”、“表明”、“機会”、“可能”および同様の表現、またはイベントまたは条件“将”、“将”、“可能”、“可能”または“すべき”で発生するわけではない。会社はこれらの展望性陳述の中で表現された期待は合理的な仮定に基づいていると考えているが、これらの陳述は未来の業績に対する保証ではなく、リスクと不確定要素の影響を受け、実際の結果或いは現実は展望性陳述中のと大きく異なる可能性がある。このような重大なリスクおよび不確実性は、NISK不動産での計画活動および一般運営資金用途を支援するために、会社が十分な資本を調達する能力、会社の将来のNISK不動産での活動のタイミングとコスト、その鉱物所有権と特許権の良好な地位の維持、経済状況または金融市場の変化、鉱物探査および採鉱作業に関連する固有の危険、金属の未来価格、全体的な経済状況の変化、鉱物資源と埋蔵量推定の正確性、新しい発見の潜在力、などを含むが、これらに限定されない。会社が探査·掘削·開発プロジェクトに必要な許可と同意を得る能力を獲得すれば, 当社のプロジェクト計画及び業務目標,当社がその鉱物資源を貨幣化する一般的な能力,及び当社の運営,環境法律及び法規の遵守,主要管理者への依存及び採鉱業の全体競争に影響を与える可能性のある環境及びその他の法律又は法規の変更について,速やかに当該等の許可及び同意を取得する。前向き陳述は、会社経営陣が発表の日に発表した合理的な信念、推定と意見に基づいている。法律に別途規定がある以外に、会社は経営陣の信念、推定または意見またはその他の要素が変化したときにこれらの前向き陳述を更新する義務はない。
1近傍物件への引用は参考までであり,Power Nickelが近傍物件と同様の結果になる保証はない.
資料源:Powerニッケル社です。
Accesswire.comでソースコードバージョンを表示する: