share_log

Blue Lagoon Hits 14.8 g/t AU and 38.3 g/t AG over 7.3m In Newly Discovered Chance Zone

Blue Lagoon Hits 14.8 g/t AU and 38.3 g/t AG over 7.3m In Newly Discovered Chance Zone

藍瀉湖在新發現的機遇區超過7.3米,AU和AG分別達到14.8g/t和38.3g/t
Accesswire ·  2022/02/07 07:30

VANCOUVER, BC / ACCESSWIRE / February 7, 2022 / Blue Lagoon Resources Inc. (the "Company") (CSE:BLLG)(FSE:7BL)(OTCQB:BLAGF) is pleased to announce that recent drilling has encountered new, high-grade vein intercepts at the Company's 100% owned, year-round accessible, Dome Mountain Gold Project located a short 50-minute drive from Smithers, B.C.

温哥華,BC/ACCESSWIRE/2022年2月7日/藍瀉湖資源公司(“公司)(CSE:BLG)(多倫多證券交易所股票代碼:7BL)(場外交易市場代碼:BLAGF)很高興地宣佈,最近的鑽探在距離不列顛哥倫比亞省史密瑟斯短短50分鐘車程的公司全資擁有、全年可達的穹頂山金礦項目遇到了新的高品位礦脈截獲。

Hole DM-21-224 was drilled from the most southern pad in the newly discovered Chance Structural Corridor (see news release Dec 7, 2021) and drilled at an Azimuth of 167 Degrees. The target here was the continuation of mineralization seen in the corridor where the structural trend intersected the proposed eastern continuation of the Boulder Vein. The hole encountered a new, high-grade vein running 14.8 g/t Au and 38.3 g/t Ag over 7.3m. A second high-grade vein running 26.9 g/t Au and +100.0 g/t* Ag over 1.04 meters was encountered further down hole.

DM-21-224孔是從新發現的Chance構造走廊(見2021年12月7日的新聞稿)的最南端墊上鑽成的,方位角為167度。這裏的目標是在走廊中看到的礦化繼續存在,在那裏,構造趨勢與擬議的博爾德礦脈東部延續相交。該井遇到了一個新的高品位礦脈,礦脈的Au含量為14.8g/t,Ag含量為38.3g/t,超過7.3米。第二個高品位礦脈的Au含量為26.9g/t,Ag含量為+100.0 g/t*,超過1.04m。

Table 1 DM-21-224

表1DM-21-224

Hole ID

From (m)

To (m)

Interval (m)

Au g/t

Ag g/t

DM-21-244

186.92

187.63

0.71

7.46

10

DM-21-244

247

247.8

0.8

6.89

25

DM-21-244

381.2

388.51

7.31

14.8

38.3

including

381.2

381.6

0.4

47.3

87

including

383

384.1

1.1

62.6

+100.00*

including

387.93

388.51

0.58

31.5

58

DM-21-244

443.52

444.56

1.04

26.9

+100.00*

孔ID

發件人(M)

至(M)

間隔(M)

Au g/t

AG g/t

DM-21-244

186.92

187.63

0.71

7.46

10

DM-21-244

247

247.8

0.8

6.89

25

DM-21-244

381.2

388.51

7.31

14.8

38.3

包括

381.2

381.6

0.4

47.3

87

包括

383

384.1

1.1

62.6

+100.00*

包括

387.93

388.51

0.58

31.5

58

DM-21-244

443.52

444.56

1.04

26.9

+100.00*

*Ag over 100ppm detection limit will be re-run with silver assay

*超過100ppm檢測限的Ag將用銀化驗重新運行

"We knew we were in a good zone in the Chance Structural Corridor which has shown us multiple mineralized intercepts in previous holes" said William Cronk, Chief Geologist for Blue Lagoon Resources. "We systematically worked our way south and then drilled south-southeast into the proposed eastern extension of the Boulder Vein in anticipation of mineralization at the intersection of two strong lineaments; the Chance Structural Zone and the eastern extension of the Boulder Vein. Previously reported intercepts were high grade in this area and the expectation is that we will be able to follow this intercept with near term holes which will test for further high-grade mineralization at depth and along strike," he added.

藍色瀉湖資源公司的首席地質學家威廉·克朗克(William Cronk)説:“我們知道我們處在機會構造走廊(Chance Structure Corridor)的一個很好的區域,這向我們展示了在之前的洞穴中發現了多個礦化截獲點。”他補充説:“我們系統地向南工作,然後向東南方向鑽探到擬議中的Boulder礦脈東部延伸段,預計在兩個強大的線形構造-Chance構造區和Boulder脈東部延伸的交匯處有礦化。之前報道的截獲段在這一地區的品位很高,預計我們將能夠在近期通過鑽孔測試深度和走向上進一步的高品位礦化,”他補充道。

Drilling is now being conducted from the same pad as that for DM-21-224 for east-west mineralization north of the pad. Once completed, the drill rig will move approximately 100m south and focus on this high-grade intercept.

目前正在從與DM-21-224相同的地塊進行鑽探,以便在地塊以北進行東西走向的礦化。一旦完成,鑽機將向南移動約100米,並將重點放在這一高級攔截上。

Assay results for 28 holes remain outstanding.

28個洞的化驗結果仍然很突出。

QUALITY ASSURANCE AND CONTROL

質量保證和控制

All core analyses in DM-21-224 were completed by Act Labs out of Kamloops B,C. Canada. Core selected for sampling was cut with a core saw in half with one half bagged for shipping. Strict chain of custody storing, and shipping protocol were maintained. Core was crushed, split, and pulverized with 250 grams passing 140 mesh (RX1). Each sample was analyzed by IF2 4-acid digestion ICP with ES finish 1A2-ICP fire assay (30g) with ICP-MS finish, and all Au overlimits >30ppm were analyzed with 1A3 fire assay and gravimetric finish. Standards and Blanks were inserted by Company staff. The sampling program was undertaken by Company personnel by and under the direction of Lorie Farrell PGEO..

DM-21-224中的所有核心分析都是由加拿大坎盧普斯B的Act Labs完成的。選擇取樣的巖芯用巖心鋸切成兩半,一半裝袋裝船。嚴格的保管鏈、儲存鏈和運輸協議都得到了維護。芯子被粉碎、劈開和粉碎,250克通過140目(RX1)。樣品經IF24酸消解後,用ES Finish 1A2-ICP火試劑法(30g)和ICP-MS光潔劑進行分析,Au超標量>30ppm用1A3火試劑法和重量法分析。標準和空白是由公司員工插入的。抽樣計劃由公司人員在Lorie Farrell PGeo的指導下進行。

The scientific and technical data contained in this news release was approved by William Cronk, P.Geo., a qualified person as defined in NI 43-101 and a consultant to the Company.

本新聞稿中包含的科學和技術數據得到了William Cronk,P.Geo,NI 43-101中定義的合格人員和公司顧問的批准。

For further information, please contact:

如需更多信息,請聯繫:

Rana Vig
President and Chief Executive Officer
Telephone: 604-218-4766
Email: rana@ranavig.com

拉娜·維格(Rana Vig)
總裁兼首席執行官
電話:604-218-4766
電子郵件:raa@ranavig.com

The CSE has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. Statement Regarding Forward-Looking Information: This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that Blue Lagoon Resources Inc. (the "Company") expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include results of exploration activities may not show quality and quantity necessary for further exploration and exploitation of minerals deposits, market prices, and continued availability of capital and financing, permitting and other approvals, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

CSE未對本新聞稿的充分性或準確性進行審查,也不承擔任何責任。關於前瞻性信息的陳述:本新聞稿包括某些可被視為“前瞻性陳述”的陳述。本新聞稿中除有關歷史事實的陳述外,涉及Blue Lagoon Resources Inc.(“本公司”)預期將發生的事件或發展的所有陳述均為前瞻性陳述。前瞻性表述是指不是歷史事實的表述,一般但不總是由“預期”、“計劃”、“預期”、“相信”、“打算”、“估計”、“項目”、“潛在”和類似表述來識別,或者事件或條件“將”、“將”、“可能”、“可能”或“應該”發生。儘管公司認為這些前瞻性陳述中表達的預期是基於合理的假設,但這些陳述並不能保證未來的業績,實際結果可能與前瞻性陳述中的結果大不相同。可能導致實際結果與前瞻性陳述中的結果大不相同的因素包括:勘探活動的結果可能沒有顯示進一步勘探和開採礦藏所需的質量和數量、市場價格、資本和融資的持續可獲得性、許可和其他批准,以及一般的經濟、市場或商業條件。請投資者注意,任何此類陳述都不能保證未來的業績,實際結果或發展可能與前瞻性陳述中預測的大不相同。前瞻性陳述是基於公司管理層在陳述發表之日的信念、估計和意見。除適用的證券法另有規定外, 如果管理層的信念、估計或意見或其他因素髮生變化,公司沒有義務更新這些前瞻性陳述。

SOURCE: Blue Lagoon Resources Inc.

資料來源:藍色瀉湖資源公司。


View source version on accesswire.com:
在accesswire.com上查看源代碼版本:

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論