share_log

Hercules Silver Commences Phase III Drill Program

Hercules Silver Commences Phase III Drill Program

Hercules Silver 啓動第三階段鑽探計劃
newsfile ·  05/06 07:00

Toronto, Ontario--(Newsfile Corp. - May 6, 2024) - Hercules Silver Corp. (TSXV: BIG) (OTCQB: BADEF) (FSE: 8Q7) ("Hercules Silver" or the "Company") is pleased to announce that three core drilling rigs are now fully mobilized and drilling the first three holes of an extensive 20,000m drill program at the Company's wholly-owned Hercules Silver Property in western Idaho ("Hercules" or the "Property"). Timberline Drilling of Hayden, Idaho has returned to carry out the program, which will consist of drilling 200m centers along NW-SE fences, starting west of the 2023 discovery area, and testing new magnetic anomalies and conductivity and chargeability anomalies identified by a 2023 deep-seeking 3D induced polarization ("IP") survey ("2023 IP survey").

安大略省多倫多--(Newsfile Corp.-2024 年 5 月 6 日)- 大力神銀業公司 (TSXV: BIG) (OTCQB: BADEF) (FSE: 8Q7) (”赫拉克勒斯銀“或者”公司“)很高興地宣佈,三臺岩心鑽機現已全部動員,並在該公司位於愛達荷州西部的全資Hercules Silver Property鑽探了20,000米的大規模鑽探計劃的前三個孔(“大力神” 或者 “財產”)。愛達荷州海登的Timberline Drilling已返回執行該項目,該項目將包括沿着西北東南圍欄鑽探200米的中心,從2023年發現區以西開始,並測試新的磁異常以及由2023年深度搜索的三維誘導極化識別出的電導率和可充電性異常(”IP“) 調查 (”2023 年知識產權調查“)。

Highlights

亮點

  • Commenced core drilling at Hercules with two Atlas Copco CS14 rigs that have an effective depth capacity of 1,000m and one Atlas Copco CS3001 rig with an effective depth capacity of 2,000m in Hercules ground conditions. Both drills are track-mounted for enhanced maneuverability.

  • The first two CS-14 rigs arrived and began coring HER-24-01 and HER-24-02 ahead of schedule on April 22, to get a head start on challenging drilling conditions that were anticipated in the Upper Plate in that area.

  • The actual number of holes drilled will depend on the depth of holes, which is to be determined based on visual logging of mineralization.

  • Drilling will operate 24/7 on two 12-hour shifts (day and night).

  • Core samples will be sent to the MSA Labs in Langley, British Columbia.

  • The phase III drill program will focus on multiple targets, including (see Figure 1):

    • Drilling on 200m centers along NW-SE fences, starting with three holes to the west, northwest and north from HER-23-05, which had the best copper intercept in 2023 of 185.29m of 0.84% Cu and 111 ppm Mo from 246m to 431.2m, including 45.33m of 1.94% Cu in an upper enrichment blanket.

    • A conductivity anomaly at the Belmont Zone identified by the 2023 IP survey. Prospecting of historical waste dumps at Belmont recently uncovered strong chalcocite mineralization, potentially sourced from an underlying enrichment blanket.

    • Two magnetic high anomalies below the Belmont and Grade Creek Zones, potentially representative of magnetite alteration, commonly associated with a central potassic zone.

    • Near surface chargeability anomaly at the Big Cut Skarn, situated at the edge of the IP survey.

  • A road upgrade project has now been completed with safety berms and 3-inch crushed rock emplaced over the existing dirt surface and subsequently graded to allow for safe vehicle travel in inclement weather conditions. This is expected to reduce standby time at the drills and potentially further extend the drilling season.

  • 開始在赫拉克勒斯進行岩心鑽探,兩臺有效深度容量爲 1,000 米的阿特拉斯·科普柯 CS14 鑽機和一臺在赫拉克勒斯地質條件下有效深度承載能力爲 2,000 米的阿特拉斯·科普柯 CS3001 鑽機。兩臺鑽機均安裝在軌道上,以增強機動性。

  • 前兩臺 CS-14 鑽機抵達並於 4 月 22 日提前開始採礦 HER-24-01 和 HER-24-02,以搶佔該地區上板塊預期的艱難鑽探條件。

  • 鑽孔的實際數量將取決於鑽孔的深度,該深度將根據礦化的目視記錄來確定。

  • 鑽探將進行兩次 12 小時輪班(白天和晚上),全天候運行。

  • 核心樣本將送往位於不列顛哥倫比亞省蘭利的 MSA 實驗室。

  • 第三階段的鑽探計劃將側重於多個目標,包括(見圖 1):

    • 沿着西北-東南圍欄在 200 米中心鑽探,首先從 HER-23-05 向西、西北和向北鑽三個孔,該鑽孔在 2023 年的銅截距最好,從 2.46 米到 4.312 米爲 111 ppm,其中 1.94% 的銅截距爲 185.29m,從 2.46 米到 4.312 億個,其中上層富集層中有 4.533 億個 1.94% 的銅。

    • 2023 年知識產權調查發現貝爾蒙特區的電導率異常。最近對貝爾蒙特歷史廢物堆放場的勘探發現了強烈的硫鋁石礦化作用,可能來自底層的富集層。

    • 貝爾蒙特和格雷德溪區下方的兩個磁高位異常,可能代表磁鐵礦蝕變,通常與中心鉀區有關。

    • 位於知識產權調查邊緣的Big Cut Skarn的近地表充電率異常。

  • 道路升級項目現已完成,在現有泥土表面鋪設安全護堤和3英寸的碎石,隨後進行分級,以便車輛在惡劣天氣條件下安全行駛。預計這將減少鑽探的待機時間,並有可能進一步延長鑽探季節。

Chris Paul, CEO and Director of the Company, commented, "Our much-anticipated Phase III drill program is officially underway, with all three drill rigs mobilized and turning. This is the largest program we have had to date and is backed by an immense amount of planning and interpretation supported by our largest shareholder, Barrick Gold Corporation. The team has been on site since April 14, further re-logging the 2023 drill core and developing new insights into the porphyry controls and targets. Important vein controls are now being recognized which appear to contribute a large portion of the copper endowment at Leviathan.

公司首席執行官兼董事Chris Paul評論說:“我們備受期待的第三階段鑽探計劃已正式啓動,所有三臺鑽機均已調動並進行轉向。這是我們迄今爲止規模最大的項目,由我們的最大股東巴里克黃金公司提供的大量規劃和解釋支持。該團隊自4月14日以來一直在現場,進一步重新記錄了2023年的鑽芯,並對斑岩控制和目標有了新的見解。重要的靜脈控制措施現已得到認可,這似乎佔了利維坦銅礦儲量的很大一部分。

In addition, our road upgrade project is now complete, preventing a significant amount of what would have been standby time for the drills, after a late season snow event occurred at the end of April. Our roads are now expected to be safe for vehicle and equipment access even in poor weather conditions. We look forward to sharing further updates as we enter a very exciting chapter of the Company's history."

此外,在4月底發生季末降雪事件之後,我們的道路升級項目現已完成,從而縮短了演習的大量待機時間。現在,即使在惡劣的天氣條件下,我們的道路也有望安全地通行車輛和設備。在我們進入公司歷史上非常激動人心的篇章之際,我們期待分享更多的最新消息。”

Phase III Drill Program

第三階段鑽探計劃

Hercules entered the early stages of a new porphyry discovery last year with a series of initial deep drill holes which encountered strong phyllic alteration, typical of the margins of a porphyry system, over an approximate 450m x 500m area.

去年,赫拉克勒斯進入了新斑岩發現的早期階段,最初鑽出了一系列深層鑽孔,這些鑽孔在大約450m x 500m的區域內遇到了強烈的斑岩系統的邊緣,這是斑岩系統邊緣的典型現象。

The first three planned holes of the 2024 field season are now currently being drilled as shown on Figure 1. Information from these first holes will influence the planning of subsequent holes. The Company has elected to commence the phase III program with three step-out holes to the west, northwest and north of HER-23-05, which is an area viewed as having the highest potential for early success. The aim is to then drill 200m centers along NW-SE oriented fences, to generate meaningful cross-sections within this high priority area. This will help our technical team understand the overall geometry of the system and optimize the orientation (dip and azimuth) of drill holes which will then test more far field targets such as Belmont and Grade Creek.

2024年油田季節的前三個計劃鑽孔目前正在鑽探中,如圖1所示。來自第一批鑽孔的信息將影響後續鑽孔的規劃。該公司已選擇在 HER-23-05 的西、西北和北部開設三個階梯式鑽孔開始第三階段的項目,該地區被認爲最有可能取得早期成功。然後,目標是沿着朝向西北的圍欄鑽出 200 米的中心,以便在這個高度優先的區域內生成有意義的橫截面。這將幫助我們的技術團隊了解系統的整體幾何形狀,優化鑽孔的方向(傾角和方位角),從而測試更多的遠場目標,例如貝爾蒙特和格拉德克里克。

The objectives of the phase III program are to:

第三階段計劃的目標是:

1) Utilize systematic step-outs to vector into the highest-grade portion of the system;

1) 利用系統步進向量進入系統的最高等級部分;

2) Identify the overall size of the target; and

2) 確定目標的總體規模;以及

3) Recognize the geometry of the system to further refine the 3D target model.

3) 識別系統的幾何形狀,進一步完善三維目標模型。

Figure 1: Phase III initial drill holes HER-24-01 through -03, IP chargeability at 800m elevation, soil geochemistry and surface traces of deep magnetic anomalies.

圖 1:第三階段初始鑽孔 HER-24-01 至 -03、海拔 800 米處的 IP 充電能力、土壤地球化學和深層磁異常的表面痕跡。

Figure 2: CS-14 drill rig set up and coring on HER-24-02.

圖 2:CS-14 鑽機在 HER-24-02 上設置和取芯。

Figure 3: CS-3001 drill rig mobilizing on HER-24-03 pad. HER-24-02 pad in background.

圖 3:CS-3001 鑽機在 HER-24-03 底盤上移動。背景中的 HER-24-02 墊子。

Figure 4: Coarse gravel and safety berm road upgrades, Belmont Zone.

圖 4:貝爾蒙特區的粗糙碎石和安全護堤道路升級。

Qualified Person

合格人員

The scientific and technical information in this news release has been reviewed and approved for disclosure by Christopher Longton BS, CPG, Hercules' Vice President, Exploration. Mr. Longton is a "Qualified Person" for Hercules Silver within the meaning of National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

本新聞稿中的科學和技術信息已由大力神勘探副總裁CPG克里斯托弗·朗頓BS審查並批准披露。根據國家儀器43-101——礦業項目披露標準,朗頓先生是Hercules Silver的 “合格人士”。

Conference Participation

會議參與情況

The Company is pleased to announce that members of its executive team are participating in the upcoming Canaccord Genuity 3rd Annual Global Metals & Mining Conference taking place May 7-9, 2024, in Palm Desert, California.

公司很高興地宣佈,其執行團隊成員將參加即將於2024年5月7日至9日在加利福尼亞州棕櫚沙漠舉行的Canaccord Genuity第三屆年度全球金屬與礦業會議。

About Hercules Silver Corp.

關於赫拉克勒斯白銀公司

Hercules Silver Corp. (TSXV: BIG) (OTCQB: BADEF) (FSE: 8Q7) is an exploration Company focused on developing Idaho's newest copper and silver district.

Hercules Silver Corp.(多倫多證券交易所股票代碼:BIG)(場外交易代碼:BADEF)(FSE:8Q7)是一家勘探公司,專注於開發愛達荷州最新的銅銀區。

The 100% owned Hercules Project located northwest of Cambridge, hosts the newly discovered Leviathan porphyry copper system, one of the most important discoveries in the region to date. The Company is well positioned for growth through continued drilling, supported by extensive historical and current exploration and a strategic investment by Barrick Gold.

這個 100% 所有權的赫拉克勒斯項目位於劍橋西北部,擁有新發現的利維坦斑岩銅系統,這是該地區迄今爲止最重要的發現之一。在廣泛的歷史和當前勘探以及Barrick Gold的戰略投資的支持下,通過持續的鑽探,該公司完全有能力實現增長。

With the potential for significant scale, the Company's management and board of directors aims to build on its proven track record which includes the discovery and development of numerous precious metals projects worldwide.

該公司的管理層和董事會有可能擴大其良好的業績記錄,包括在全球範圍內發現和開發衆多貴金屬項目。

For further information please contact:

欲了解更多信息,請聯繫:

Nisha Hasan
Investor Relations
Telephone +1 (604) 425-1408
Email: nisha@herculessilver.com

妮莎·哈桑
投資者關係
電話 +1 (604) 425-1408
電子郵件:nisha@herculessilver.com

Chris Paul
CEO & Director
Telephone +1 (604) 670-5527
Email: chris@herculessilver.com

克里斯·保羅
首席執行官兼董事
電話 +1 (604) 670-5527
電子郵件:chris@herculessilver.com

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. Any securities referred to herein have not and will not be registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws of an exemption from such registration is available.

本新聞稿不構成美國任何證券的賣出要約或收購要約的邀請。此處提及的任何證券過去和將來都不會根據經修訂的1933年《美國證券法》進行註冊(”《美國證券法》“) 或任何州證券法,除非根據美國證券法和適用的州證券法進行註冊,否則不得在美國境內或向美國人出售或出售,除非根據美國證券法和適用的州證券法進行註冊,可以豁免此類註冊。

Disclaimer for Forward-Looking Information

前瞻性信息免責聲明

This news release contains certain information that may be deemed "forward-looking information" with respect to the Company within the meaning of applicable securities laws. Such forward-looking information involves known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking information. Forward-looking information includes statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur. Forward-looking information contained in this press release may include, without limitation, the expected execution of future exploration programs on the Property; assay results of future drill holes; results of operations, and the expected financial performance of the Company.

本新聞稿包含某些信息,根據適用的證券法,這些信息可能被視爲與公司有關的 “前瞻性信息”。此類前瞻性信息涉及已知和未知的風險、不確定性和其他因素,這些因素可能導致公司的實際業績、業績或成就或行業發展與此類前瞻性信息所表達或暗示的預期業績、業績或成就存在重大差異。前瞻性信息包括不是歷史事實的陳述,通常以 “期望”、“計劃”、“預期”、“相信”、“打算”、“估計”、“項目”、“潛力” 和類似的表述來識別,或者事件或條件 “將”、“會”、“可能” 或 “應該” 發生。本新聞稿中包含的前瞻性信息可能包括但不限於該物業未來勘探計劃的預期執行情況;未來鑽孔的化驗結果;經營業績以及公司的預期財務業績。

Although the Company believes the forward-looking information contained in this news release is reasonable based on information available on the date hereof, by its nature, forward-looking information involves assumptions and known and unknown risks, uncertainties and other factors which may cause our actual results, level of activity, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information.

儘管根據本新聞稿發佈之日可用的信息,公司認爲本新聞稿中包含的前瞻性信息是合理的,但就其性質而言,前瞻性信息涉及假設以及已知和未知的風險、不確定性和其他因素,這些因素可能導致我們的實際業績、活動水平、業績或成就或其他未來事件與此類前瞻性信息所表達或暗示的任何未來業績、業績或成就存在重大差異。

Examples of such assumptions, risks and uncertainties include, without limitation, assumptions, risks and uncertainties associated with general economic conditions; the Covid-19 pandemic; adverse industry events; the receipt of required regulatory approvals and the timing of such approvals; that the Company maintains good relationships with the communities in which it operates or proposes to operate, future legislative and regulatory developments in the mining sector; the Company's ability to access sufficient capital from internal and external sources, and/or inability to access sufficient capital on favorable terms; mining industry and markets in Canada and generally; the ability of the Company to implement its business strategies; competition; the risk that any of the assumptions prove not to be valid or reliable, which could result in delays, or cessation in planned work, risks associated with the interpretation of data, the geology, grade and continuity of mineral deposits, the possibility that results will not be consistent with the Company's expectations, as well as other assumptions risks and uncertainties applicable to mineral exploration and development activities and to the Company, including as set forth in the Company's public disclosure documents filed on the SEDAR+ website at .

此類假設、風險和不確定性的示例包括但不限於與總體經濟狀況相關的假設、風險和不確定性;Covid-19疫情;不利的行業事件;所需的監管批准的獲得和此類批准的時間;公司與其運營或擬運營的社區保持良好關係;採礦業未來的立法和監管發展;公司從內部和外部來源獲得足夠資本的能力,和/或無法以優惠條件獲得足夠的資本;加拿大乃至整個採礦業和市場;公司實施業務戰略的能力;競爭;任何假設被證明無效或不可靠,可能導致計劃工作延遲或停止的風險,與數據解釋、礦牀的地質、品位和連續性相關的風險,結果與公司預期不一致的可能性以及其他假設風險和不確定性適用於礦產勘探和開發活動以及公司,包括公司在SEDAR+網站上提交的公開披露文件中規定的內容,網址爲。

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS PRESS RELEASE REPRESENTS THE EXPECTATIONS OF HERCULES SILVER AS OF THE DATE OF THIS PRESS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE HERCULES SILVER MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

本新聞稿中包含的前瞻性信息代表了赫拉克勒斯·西爾弗截至本新聞稿發佈之日的預期,因此,該日期之後可能會發生變化。讀者不應過分重視前瞻性信息,也不應像其他任何日期一樣依賴這些信息。儘管 HERCULES SILVER 可以選擇更新這些信息,但除非適用法律有要求,否則它不承諾在任何特定時間更新這些信息。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

多倫多證券交易所風險投資交易所及其監管服務提供商(該術語在多倫多證券交易所風險投資交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論