share_log

ACME Lithium to Attend PDAC 2024 Convention in Toronto, March 3rd - 6th

ACME Lithium to Attend PDAC 2024 Convention in Toronto, March 3rd - 6th

ACME Lithium 將參加 3 月 3 日至 6 日在多倫多舉行的 PDAC 2024 年大會
newsfile ·  02/29 08:30

Vancouver, British Columbia--(Newsfile Corp. - February 29, 2024) - ACME Lithium Inc. (CSE: ACME) (OTCQB: ACLHF) (the "Company", or "ACME") is pleased to announce that the Company will be attending and exhibiting at Booth #2406 at the Prospectors & Developers Association of Canada's ("PDAC") Convention at the Metro Toronto Convention Centre ("MTCC") from Sunday, March 3rd to Wednesday, March 6th, 2024.

不列顛哥倫比亞省溫哥華--(Newsfile Corp.-2024 年 2 月 29 日)- ACME Lithium Inc (案例:ACME) (OTCQB:ACLHF) (“公司” 或 “ACME”)很高興地宣佈,公司將從3月3日星期日起參加在大多倫多會議中心(“MTCC”)舉行的加拿大勘探者與開發商協會(“PDAC”)會議的 #2406 號展位並參展第三方 至3月6日星期三第四,2024。

On February 6th, 2024 ACME reported an exploration summary and hydrogeological evaluation report for ACME's Phase 1 and Phase 2 programs at its Clayton Valley, Nevada lithium brine project which included an estimated inferred lithium carbonate equivalent (LCE) resource of approximately 302,900 metric tons (units rounded). ACME intends to file a NI 43-101 compliant report on its Clayton Valley project within 45 days of this prior announcement.

2 月 6 日第四,2024年 ACME報告了ACME在其內華達州克萊頓谷鋰鹽水項目第一和第二階段項目的勘探摘要和水文地質評估報告,其中包括估計推斷的約302,900公噸(單位四捨五入)的碳酸鋰當量(LCE)資源。ACME打算在上次宣佈後的45天內就其克萊頓谷項目提交一份符合北愛爾蘭43-101標準的報告。

ACME's Clayton Valley Nevada lithium brine project (the "Project") is contiguous to the northwest of one of the only operating lithium brine operations in North America, Albemarle Corporation's Silver Peak lithium deposit and facility which has been in production since 1966.

ACME的內華達州克萊頓谷鋰鹽水項目(“項目”)毗鄰北美僅有的運營鋰鹽水業務之一,即自1966年以來一直在生產的雅寶公司的銀峯鋰礦牀和設施的西北部。

About PDAC

關於 PDAC

The World's Premier Mineral Exploration & Mining Convention is the leading convention for people, governments, companies and organizations connected to mineral exploration. In addition to meeting more than 1,100 exhibitors, 2,500 investors and 24,000 attendees in person in 2023, participants could also attend programming, courses and networking events.

全球首屈一指的礦產勘探和採礦會議是與礦產勘探相關的個人、政府、公司和組織的主要會議。除了在2023年親自與1,100多家參展商、2,500名投資者和24,000名與會者會面外,參與者還可以參加節目、課程和社交活動。

The annual convention is held in Toronto, Canada. It has grown in size, stature and influence since it began in 1932 and today is the event of choice for the world's mineral industry.

年度大會在加拿大多倫多舉行。自1932年成立以來,它的規模、地位和影響力不斷提高,如今已成爲世界礦業的首選活動。

For more information and/or to register for the conference,
please visit: .

欲了解更多信息和/或註冊會議,
請訪問:。

About ACME Lithium Inc.

關於 ACME Lithium Inc.

Led by an experienced team, ACME Lithium is a mineral exploration Company focused on acquiring, exploring, and developing battery metal projects in partnership with leading technology and commodity companies. ACME has acquired or is under option to acquire a 100-per-cent interest in a project area located in Clayton Valley, Nevada and has entered into option agreements with third parties on its Fish Lake Valley, Esmeralda County Nevada project, and at Shatford, Birse, and Cat-Euclid Lakes in southeastern Manitoba.

ACME Lithium是一家礦產勘探公司,由經驗豐富的團隊領導,專注於與領先的技術和大宗商品公司合作收購、勘探和開發電池金屬項目。ACME已經收購或有選擇收購位於內華達州克萊頓谷的項目區域的100%權益,並已就其魚湖谷、內華達州埃斯梅拉達縣項目以及曼尼托巴省東南部的沙特福德、伯斯和卡特歐幾里德湖項目與第三方簽訂了期權協議。

On behalf of the Board of Directors

代表董事會

Steve Hanson
Chief Executive Officer, President and Director
Telephone: (604) 564-9045
info@acmelithium.com

史蒂夫·漢森
首席執行官、總裁兼董事
電話:(604) 564-9045
info@acmelithium.com

For Investor Inquiries:
Anthony Simone
Simone Capital
Telephone: (416) 881-5154
asimone@simonecapital.ca

投資者查詢:
安東尼西蒙尼
西蒙妮資本
電話:(416) 881-5154
asimone@simonecapital.ca

Neither the CSE nor its regulations service providers accept responsibility for the adequacy or accuracy of this news release. This news release contains certain statements which may constitute forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from exploration, drilling or development at ACME's project properties. Information inferred from the interpretation of drilling, sampling and other technical results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. ACME's project location adjacent to or nearby lithium projects does not guarantee exploration success or that mineral resources or reserves will be defined on ACME's properties. Exploration, development, and activities conducted by regional companies provide assistance and additional data for exploration work being completed by ACME. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Unless otherwise indicated, the market and industry data contained herein is based upon information from industry and other publications and the knowledge and experience of management. While we believe that this data is reliable, market and industry data is subject to variations and cannot be verified with complete certainty due to limits on the availability and reliability of raw data, the voluntary nature of the data gathering process and other limitations and uncertainties inherent in any statistical survey. We have not independently verified any of the data from third-party sources referred to in this news release or ascertained the underlying assumptions relied upon by such sources. All technical and scientific disclosure pertaining to our mineral property interests in this news release have been reviewed by a Qualified Person, meaning an individual who is an engineer or geoscientist with at least five years of experience in mineral exploration, mine development or operation or mineral project assessment, or any combination of these; has experience relevant to the subject matter of the mineral project and the technical report; and is a member or licensee in good standing of a professional association.

CSE及其監管服務提供商均不對本新聞稿的充分性或準確性承擔責任。本新聞稿包含某些可能構成適用證券法所指的前瞻性信息的陳述(“前瞻性陳述”)。前瞻性陳述不是歷史事實的陳述,通常但並非總是用 “預期”、“計劃”、“預期”、“相信”、“打算”、“估計”、“項目”、“潛在” 和類似的表達方式來標識,或者事件或條件 “將”、“將”、“可能” 或 “應該” 發生,在本新聞稿中,包括但不限於 ACME項目物業的勘探、鑽探或開發的屬性、時機和預期收益。從對鑽探、取樣和其他技術結果的解釋中推斷出的信息也可以被視爲前瞻性陳述,因爲它構成了對項目實際開發時間和是否實際開發時可能出現的內容的預測。ACME的項目位置與鋰項目相鄰或附近,並不能保證勘探成功,也不能保證礦產資源或儲量將在ACME的房產上確定。區域公司開展的勘探、開發和活動爲ACME正在完成的勘探工作提供了援助和其他數據。這些前瞻性陳述受到各種風險和不確定性的影響,這些風險和不確定性可能導致實際事件或結果與前瞻性陳述中反映的事件或結果存在重大差異,包括但不限於:與金屬價格波動相關的風險;與及時籌集足夠資金以按可接受的條件爲計劃的工作提供資金相關的不確定性;天氣、物流、技術或其他因素導致的計劃工作發生變化;工作結果可能無法達到預期;以及意識到公司財產的潛在價值;發生事故、設備故障和勞資糾紛或其他意想不到的困難或中斷的風險;工作計劃中可能出現成本超支或意外支出;公司運營造成的環境污染或破壞風險以及其他風險和不確定性。任何前瞻性陳述僅代表截至其發表之日,除非適用的證券法另有要求,否則公司不承擔更新任何前瞻性陳述的任何意圖或義務,無論是由於新信息、未來事件或業績還是其他原因。除非另有說明,否則此處包含的市場和行業數據基於來自行業和其他出版物的信息以及管理層的知識和經驗。儘管我們認爲這些數據是可靠的,但由於原始數據的可用性和可靠性的限制、數據收集過程的自願性質以及任何統計調查固有的其他限制和不確定性,市場和行業數據可能會有所不同,無法完全確定地進行驗證。我們尚未獨立驗證本新聞稿中提及的來自第三方來源的任何數據,也未確定此類來源所依賴的基本假設。本新聞稿中與我們的礦產權益有關的所有技術和科學披露均已由合格人員審查,即工程師或地球科學家,在礦產勘探、礦山開發或運營或礦產項目評估或其任何組合方面至少有五年的經驗;具有與礦產項目主題和技術報告相關的經驗;並且是專業協會的成員或被許可人。

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論