share_log

Hercules Silver Reports Broad Intervals of Silver Including 112.2 Meters of 193 G/t Ag, 0.2% Pb, 0.4% Zn at the Hercules Adit and Belmont Zones

Hercules Silver Reports Broad Intervals of Silver Including 112.2 Meters of 193 G/t Ag, 0.2% Pb, 0.4% Zn at the Hercules Adit and Belmont Zones

Hercules Silver 報告了廣泛的白銀間隔,包括 Hercules Adit 和 Belmont 區域的 112.2 米 193 g/t Ag、0.2% Pb、0.4% Zn
newsfile ·  02/28 08:00

Toronto, Ontario--(Newsfile Corp. - February 28, 2024) - Hercules Silver Corp. (TSXV: BIG) (OTCQB: BADEF) (FSE: 8Q7) ("Hercules Silver" or the "Company") is pleased to report strong silver-lead-zinc results from shallow holes drilled into the Upper Plate above the new Leviathan porphyry copper discovery at its Hercules Silver Property located in western Idaho ("Hercules" or the "Property").

安大略省多倫多--(Newsfile Corp.-2024 年 2 月 28 日)- 大力神銀業公司 (TSXV: BIG) (OTCQB: BADEF) (FSE: 8Q7) (”赫拉克勒斯銀“或者”公司“)很高興地報告,在愛達荷州西部的大力神銀礦業新發現的利維坦斑岩銅礦上方的上層板塊上方鑽出淺孔後,銀鉛鋅取得了強勁的銀鉛鋅成果(“大力神” 或者 “財產”)。

These results showcase the presence of a significant silver system above and potentially related to the Leviathan porphyry copper discovery. Grade and continuity are seen to increase to the northwest, toward the Hercules Adit Zone, in a similar pattern to the underlying porphyry copper system.

這些結果表明,上方存在重要的銀系統,可能與利維坦斑岩銅的發現有關。可以看出,向西北,朝向赫拉克勒斯阿迪特區,品位和連續性將增加,其模式與底層斑岩銅系統類似。

  • HER-23-17 extended the high-grade Hercules Adit footwall shoot down plunge, with 11.3 Meters of 1,660 g/t Ag, 0.7% Pb, 1.75% Zn, one of the best silver intercepts on the Property, within an overall 112.2 Meters of 193 g/t Ag, 0.2% Pb, 0.4% Zn.
  • HER-23-17 延長了高等級 Hercules Adit 足牆向下衝擊,11.3 米的 1,660 g/t Ag、0.7% Pb、1.75% Zn,這是該地產中最好的銀截距之一,總計 112.2 米以內 193 g/t Ag、0.2% Pb、0.4% Zn。
  • HER-23-19 intersected a potentially new mineralized shoot at the hanging wall contact of the Hercules Adit Zone, returning 15.3 Meters of 359 g/t Ag, 0.4% Pb, 0.4% Zn.
  • HER-23-19 在 Hercules Adit Zone 的懸壁接觸點處與一個潛在的新礦化樹枝相交,返回了 15.3 米的 359 g/t Ag、0.4% Pb、0.4% Zn。
  • HER-23-13 intersected 100.1 Meters of 64 g/t Ag, 0.14% Pb, 0.49% Zn including 6.1 Meters of 413 g/t Ag, 1.1% Pb, 1.7% Zn.
  • HER-23-13 與 64 g/t Ag、0.14% Pb、0.49% Zn 的 100.1 米相交,包括 6.1 米 413 g/t Ag、1.1% Pb、1.7% Zn。
  • HER-23-09 intersected 32.2 Meters of 167 g/t Ag, 0.17% Zn.
  • HER-23-09 與 167 g/t Ag、0.17% Zn 的 32.2 米相交。
  • HER-23-22 intersected 58.8 Meters of 140 g/t Ag, 0.43% Pb, 0.69% Zn including 13.7 Meters of 280 g/t Ag, 0.3% Pb, 0.8% Zn.
  • HER-23-22 與 140 g/t Ag、0.43% Pb、0.69% Zn 的 58.8 米相交,包括 13.7 米的 280 g/t Ag、0.3% Pb、0.8% Zn。
  • HER-23-23 intersected 43.9 Meters of 138 g/t Ag, 0.37% Pb, 0.32% Zn including 1.5 Meters of 1,450 g/t Ag, 1.06% Pb, 0.17% Zn.
  • HER-23-23 與 138 g/t Ag、0.37% Pb、0.32% Zn 的 43.9 米相交,包括 1.5 米 1,450 g/t Ag、1.06% Pb、0.17% Zn。
  • The highest silver grades are concentrated at the Hercules Adit Zone, indicating a strengthening trend to the north, in alignment with the copper mineralization observed in the underlying porphyry copper system (Refer to the Company's January 22, 2024 News Release).
  • 最高的銀品位集中在赫拉克勒斯阿迪特區,這表明向北走強的趨勢,這與在底層斑岩銅系統中觀察到的銅礦化情況一致(參見該公司2024年1月22日的新聞稿)。
  • The Hercules Adit Zone continues to remain open down plunge, extending towards a potential porphyry copper target.
  • Hercules Adit Zone 繼續保持開放態勢,向潛在的斑岩銅目標延伸。
  • Planning for the 2024 drill campaign is underway, with the program scheduled to commence when weather conditions permit. Additional details regarding the drill plan will be disclosed as targets are finalized.
  • 2024年的演習計劃正在進行中,該計劃計劃在天氣條件允許時開始。目標最終確定後,將披露有關鑽探計劃的更多細節。

In a similar pattern to the increasing copper grades reported in the Lower Plate, the silver grades also appear to increase in a northerly direction, with the most promising grades found at the Hercules Adit Zone (Refer to Figures 2 and 3). This correlation suggests a potential relationship between the two mineralization styles, possibly representing different levels within a porphyry system.

與下盤中報告的銅品位上升的模式類似,白銀品位似乎也朝北方向上升,其中最有希望的品位出現在赫拉克勒斯評估區(參見圖2和圖3)。這種相關性表明兩種礦化類型之間存在潛在關係,可能代表斑岩系統中的不同水平。

Large porphyry systems are often characterized by successive episodes of mineralization. In the later stages of certain systems, shallow silver mineralization may migrate up vertical structures above the porphyry center, and extend laterally across favorable host units, such as the Hercules Rhyolite. It's possible that the gently dipping silver within the Hercules Rhyolite may originate from a vertical feeder structure above a porphyry center.

大型斑岩系統的特徵通常是連續的礦化。在某些系統的後期階段,淺層銀礦化可能會向斑岩中心上方的垂直結構向上遷移,並橫向延伸到有利的宿主單元,例如大力神流紋岩。在赫拉克勒斯流紋岩中緩緩浸泡的銀可能來自斑岩中心上方的垂直饋電結構。

Drilling thus far has indicated increasing silver grades to the northwest, toward the Hercules Adit Zone, which may continue to increase below the post-mineral Brownlee Formation. The best silver on surface occurs further north at the largely untested Hercules Ridge and Grade Creek zones, which also carry significant copper, with some samples even exhibiting rare copper staining in the Hercules Rhyolite (Photo 1). In addition, the Upper Plate geology at the Belmont Zone also carries anomalously high copper on surface and as reported by historical mining activity in the early 1900's1. These factors, along with convincing geophysical trends present these zones as compelling targets for the upcoming 2024 drilling campaign, as we look to explore their porphyry copper potential at depth.

到目前爲止,鑽探表明,向西北方向朝向大力神阿迪特區的白銀品位有所提高,該地帶可能會繼續上升到礦後布朗利地層以下。地表上最好的銀出現在更北邊的大力神嶺和Grade Creek地帶,這些區域也含有大量的銅,有些樣品甚至在大力神流紋岩中顯示出稀有的銅染色(照片1)。此外,正如20世紀初的歷史採礦活動所報告的那樣,貝爾蒙特區的上板塊地質地表含銅量也異常高1。這些因素,加上令人信服的地球物理趨勢,使這些區域成爲即將到來的2024年鑽探活動的引人注目的目標,因爲我們希望在深度探索其斑岩銅潛力。

Chris Paul, CEO and Director of the Company, noted: "We're encouraged to see another line of evidence for increasing grades to the northwest as we work closely with Barrick Gold Corporation's senior technical team to plan our 2024 drill campaign. The program will be aimed at systematically stepping out on the Leviathan porphyry copper discovery as well as testing a multitude of new targets identified by our team. The objective is to have three diamond core rigs operational on site to complete a series of systematic step-outs from discovery hole HER-23-05, as well as several larger scale step-outs, and scout drilling of select reconnaissance targets. We look forward to sharing the details of the drill plan as we finalize specific targets in advance of the field season.

公司首席執行官兼董事克里斯·保羅指出:”在我們與巴里克黃金公司的高級技術團隊密切合作規劃2024年的鑽探活動時,我們很高興看到另一條證據表明西北地區的等級有所提高。該計劃將旨在系統地探索利維坦斑岩銅的發現,並測試我們團隊確定的衆多新目標。目標是讓三臺鑽石岩心鑽機在現場投入運行,以完成從 HER-23-05 發現洞進行的一系列系統性跨越,以及幾次更大規模的踏出以及對選定偵察目標的偵察鑽探。我們期待與大家分享鑽探計劃的細節,因爲我們在實地考察季節之前最終確定了具體目標。

We'd also like to thank Barrick for the tremendous technical support they've provided us with so far. I'm proud of our teams combined efforts and cooperation at interpreting the data and generating a robust 3D model for use towards the drill planning."

我們還要感謝巴里克迄今爲止爲我們提供的大量技術支持。我爲我們的團隊在解釋數據和生成用於鑽探規劃的可靠三維模型方面共同努力與合作感到自豪。”

Table 1: Significant Intercepts* at the Hercules Adit Zone

表 1:赫拉克勒斯審核區的重要截獲次數*

Hole ID From (m) To (m) Interval (m) Ag (g/t) Pb (%) Zn (%) Mn (%)
HER-23-13 40.23 140.36 100.1 64 0.14 0.49 1.0
including 44.81 50.90 6.1 413 1.10 1.70 3.7
including 97.29 99.49 2.2 560 0.17 0.19 2.0
including 130.06 131.58 1.5 723 - 0.19 1.2
HER-23-17 39.47 151.70 112.2 193 0.18 0.43 1.4
including 39.47 54.25 14.8 118 0.16 0.31 2.1
including 136.64 147.89 11.3 1,660 0.70 1.75 2.4
HER-23-19 34.75 50.08 15.3 359 0.40 0.40 2.0
AND 82.24 85.80 3.6 142 0.56 0.74 1.2
HER-23-22 0.00 58.83 58.8 140 0.43 0.69 2.0
including 45.11 58.83 13.7 280 0.30 0.80 3.7
HER-23-23 0.00 38.10 43.9 138 0.37 0.32 2.6
including 25.91 38.10 12.2 398 0.40 0.46 4.9
including 25.91 27.43 1.5 1,450 1.06 0.17 3.9
HER-23-24 19.81 29.11 9.3 61 0.75 0.15 1.1
洞 ID 從 (m) 到 (m) 間隔 (m) 銀 (g/t) 鉛 (%) 鋅 (%) 錳 (%)
HER-23-13 40.23 140.36 100.1 64 0.14 0.49 1.0
包括 44.81 50.90 6.1 413 1.10 1.70 3.7
包括 97.29 99.49 2.2 560 0.17 0.19 2.0
包括 130.06 131.58 1.5 723 - 0.19 1.2
她-23-17 39.47 151.70 112.2 193 0.18 0.43 1.4
包括 39.47 54.25 14.8 118 0.16 0.31 2.1
包括 136.64 147.89 11.3 1,660 0.70 1.75 2.4
HER-23-19 34.75 50.08 15.3 359 0.40 0.40 2.0
82.24 85.80 3.6 142 0.56 0.74 1.2
HER-23-22 0.00 58.83 58.8 140 0.43 0.69 2.0
包括 45.11 58.83 13.7 280 0.30 0.80 3.7
HER-23-23 0.00 38.10 43.9 138 0.37 0.32 2.6
包括 25.91 38.10 12.2 398 0.40 0.46 4.9
包括 25.91 27.43 1.5 1,450 1.06 0.17 3.9
HER-23-24 19.81 29.11 9.3 61 0.75 0.15 1.1

Table 2: Significant Intercepts* at the Belmont Zone

表 2:貝爾蒙特區域的重要截獲量*

Hole ID From (m) To (m) Interval (m) Ag (g/t) Pb (%) Zn (%) Mn (%)
HER-23-09 0.00 32.19 32.2 167 - 0.17 1.7
HER-23-10 0.00 12.19 12.2 58 - 0.14 1.0
HER-23-12 0.00 21.18 21.2 137 - 0.18 1.0
including 18.47 19.66 1.2 1813 - 0.16 1.2
洞 ID 從 (m) 到 (m) 間隔 (m) 銀 (g/t) 鉛 (%) 鋅 (%) 錳 (%)
HER-23-09 0.00 32.19 32.2 167 - 0.17 1.7
HER-23-10 0.00 12.19 12.2 58 - 0.14 1.0
HER-23-12 0.00 21.18 21.2 137 - 0.18 1.0
包括 18.47 19.66 1.2 1813 - 0.16 1.2

Table 3: Significant Intercepts* at the Frogpond Zone

表 3:Frogpond 區域的重要截獲量*

Hole ID From (m) To (m) Interval (m) Ag (g/t) Pb (%) Zn (%) Mn (%)
HER-23-15 LOST. REDRILLED AS HER-23-16
HER-23-16 115.06 130.76 15.7 163 0.27 0.17 3.9
洞 ID 從 (m) 到 (m) 間隔 (m) 銀 (g/t) 鉛 (%) 鋅 (%) 錳 (%)
她-23-15 丟失了。改成她的 23-16
HER-23-16 115.06 130.76 15.7 163 0.27 0.17 3.9

*The intervals reported represent drill intercepts and insufficient data are available
at this time to state the true thickness of the mineralized intervals.

*報告的間隔表示鑽探截獲次數,可用數據不足
此時要說明礦化間隔的真實厚度。

Table 4: Upper Plate Silver Intercepts* in Deep Porphyry Drill Holes

表 4:深斑岩鑽孔中的上板銀截面*

Hole ID From (m) To (m) Interval (m) Ag (g/t) Pb (%) Zn (%) Mn (%) Notes
HER-23-08 0.00 104.00 104.0 10 - 0.19 1.4
HER-23-11 12.98 44.96 32.0 14 - 0.13 0.8
AND 71.93 81.93 10.0 17 0.19 1.30 2.4
HER-23-20 19.29 45.87 26.6 103
0.24 1.1 HER-23-20 designed to target porphyry but was lost immediately before intersecting lower plate
AND 199.80 223.72 23.9 46

1.0
including 199.80 204.22 4.4 70 0.14 0.17 1.3
including 222.50 223.72 1.2 564 - 0.11 0.6 Hole lost after this sample
HER-23-21 0.00 25.91 25.9 32
0.10 1.5
including 0.00 13.72 13.7 52

1.2
洞 ID 從 (m) 到 (m) 間隔 (m) 銀 (g/t) 鉛 (%) 鋅 (%) 錳 (%) 注意事項
HER-23-08 0.00 104.00 104.0 10 - 0.19 1.4
HER-23-11 12.98 44.96 32.0 14 - 0.13 0.8
71.93 81.93 10.0 17 0.19 1.30 2.4
HER-23-20 19.29 45.87 26.6 103
0.24 1.1 HER-23-20 專爲瞄準斑岩而設計,但在與下板相交之前立即丟失
199.80 223.72 23.9 46

1.0
包括 199.80 204.22 4.4 70 0.14 0.17 1.3
包括 222.50 223.72 1.2 564 - 0.11 0.6 這個樣本之後鑽孔丟失了
HER-23-21 0.00 25.91 25.9 32
0.10 1.5
包括 0.00 13.72 13.7 52

1.2

*The intervals reported represent drill intercepts and insufficient data are available at this time to state the true thickness of the mineralized intervals.

*報告的間隔代表鑽探截距,目前沒有足夠的數據來說明礦化區間的真實厚度。

Table 5: Reported Drill Hole Locations

表 5:報告的鑽孔位置

Hole ID Easting Northing Elevation Depth (m) Azimuth Dip
HER-23-08 511414 4956760 1402 713.9 110 -70.0
HER-23-09 511449 4955610 1246 77.4 73.69 -44.8
HER-23-10 511449 4955610 1246 220.8 106.93 -44.8
HER-23-11 511577 4956352 1430 419.2 50.2 -60.5
HER-23-12 511449 4955610 1246 49.7 24.9 -65.3
HER-23-13 511132 4957113 1340 159.4 115.1 -56.9
HER-23-14 511966 4955967 1436 378.5 126.7 -59.9
HER-23-15 511061 4956765 1278 43.9 190.1 -60.2
HER-23-16 511039 4956641 1291 136.1 0 -90.0
HER-23-17 511132 4957113 1340 158.7 164.99 -63.7
HER-23-18 511987 4956137 1449 151.5 19.71 -50.4
HER-23-19 511132 4957113 1340 185.2 151.99 -71.0
HER-23-20 511342 4956557 1372 226.0 200.29 -80.1
HER-23-21 511638 4956352 1436 1007.1 240.43 -80.2
HER-23-22 511079 4956969 1293 76.6 79.81 -55.0
HER-23-23 511079 4956969 1293 87.7 159.96 -45.1
HER-23-24 511097 4956950 1291 42.7 90.17 -44.9
HER-23-25 511927 4956202 1438 126.4 240.5 -45.3
HER-23-26 511091 4956230 1349 799.6 64.89 -64.7
洞 ID 向東 北方 海拔 深度 (m) 方位角
HER-23-08 511414 4956760 1402 713.9 110 -70.0
HER-23-09 511449 4955610 1246 77.4 73.69 -44.8
HER-23-10 511449 4955610 1246 220.8 106.93 -44.8
HER-23-11 511577 4956352 1430 419.2 50.2 -60.5
HER-23-12 511449 4955610 1246 49.7 24.9 -65.3
HER-23-13 511132 4957113 1340 159.4 115.1 -56.9
她-23-14 511966 4955967 1436 378.5 126.7 -59.9
她-23-15 511061 4956765 1278 43.9 190.1 -60.2
HER-23-16 511039 4956641 1291 136.1 0 -90.0
她-23-17 511132 4957113 1340 158.7 164.99 -63.7
HER-23-18 511987 4956137 1449 151.5 19.71 -50.4
HER-23-19 511132 4957113 1340 185.2 151.99 -71.0
HER-23-20 511342 4956557 1372 226.0 200.29 -80.1
HER-23-21 511638 4956352 1436 1007.1 240.43 -80.2
HER-23-22 511079 4956969 1293 76.6 79.81 -55.0
HER-23-23 511079 4956969 1293 87.7 159.96 -45.1
HER-23-24 511097 4956950 1291 42.7 90.17 -44.9
HER-23-25 511927 4956202 1438 126.4 240.5 -45.3
HER-23-26 511091 4956230 1349 799.6 64.89 -64.7

Sample Analysis and QAQC

樣本分析和質量控制

All drill core and rock samples were prepped and analyzed at MSA Labs in Langley, British Columbia, an ISO 17025 and ISO 9001 certified laboratory. Samples were dried and crushed to 2mm, from which a 250g sub-sample split was then pulverized to 85% passing a 75 micron sieve. Following preparation, assays were determined by the IMS-230 method. A 0.25g aliquot of the prepared pulp was digested in a 4-acid solution consisting of hydrochloric, nitric, perchloric and hydrofluoric acids. 4-acid is a near total digest and only the most highly resistant minerals are not dissolved. The resulting solution was analyzed via ICP-MS and ICP-ES for 48 elements and was corrected for inter-element spectral interferences. Lower detection limits for this procedure are 0.01 ppm for silver, 0.5 ppm for lead, 2 ppm for zinc, and 0.2 ppm for copper. Mercury is not reported due to volatilization in reaction with hydrofluoric acid and gold is not reported due to the small, 0.25g aliquot size being insufficient to overcome the nugget effect.

所有鑽芯和岩石樣本均在不列顛哥倫比亞省蘭利的MSA實驗室進行準備和分析,該實驗室是經過ISO 17025和ISO 9001認證的實驗室。將樣品乾燥並壓碎至 2 毫米,然後通過 75 微米的篩子將分裂的 250 克子樣品粉碎至 85%。製備完成後,檢測結果通過 IMS-230 方法確定。在由鹽酸、硝酸、高氯酸和氫氟酸組成的四酸溶液中消化了 0.25 克等分的製備紙漿。4-酸幾乎可以完全消化,只有抗性最強的礦物質不溶解。通過ICP-MS和ICP-ES對48種元素的溶液進行了分析,並針對元素間光譜干擾進行了校正。該程序的下限銀的檢出限爲0.01 ppm,鉛的下限爲0.5 ppm,鋅的下限爲2 ppm,銅的下限爲0.2 ppm。由於與氫氟酸反應時會揮發,沒有報告汞,也沒有報告金,因爲0.25g的等分試樣大小不足以克服金塊效應。

Samples with initial results beyond the upper detection limit of the IMS-230 method were analyzed by procedures ICF-6Ag, ICF-6Pb and ICF-6Zn. The thresholds were 100 ppm for silver, and >1% for lead and zinc. Preliminary silver assays that returned values >1000 ppm were determined by fire assay with a 50g charge for the final result.

通過 ICF-6Ag、ICF-6pB 和 ICF-6Zn 程序對初始結果超過 IMS-230 方法檢出上限的樣本進行了分析。銀的閾值爲100 ppm,鉛和鋅的閾值大於1%。返回值>1000 ppm的初步銀化驗是通過火試確定的,最終結果爲50g的電荷。

MSA Labs employs internal quality control standards, duplicates and blank samples at set frequencies.

MSA Labs 採用內部質量控制標準、設定頻率的重複樣品和空白樣本。

Blind certified reference materials (CRMs) and blank samples were systematically inserted by the Company into the sample stream and analyzed as part of the Company's quality assurance/quality control protocol.

作爲公司質量保證/質量控制協議的一部分,公司系統地將盲目認證參考材料(CRM)和空白樣本插入樣本流中並進行分析。

Qualified Person

合格人員

The scientific and technical information in this news release has been reviewed and approved for disclosure by Christopher Longton BS, CPG, Hercules' Vice President, Exploration. Mr. Longton is a "Qualified Person" for Hercules Silver within the meaning of National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

本新聞稿中的科學和技術信息已由大力神勘探副總裁CPG克里斯托弗·朗頓BS審查並批准披露。根據國家儀器43-101——礦業項目披露標準,朗頓先生是Hercules Silver的 “合格人士”。

About Hercules Silver Corp.

關於赫拉克勒斯白銀公司

Hercules Silver Corp. is a junior mining company focused on the exploration and development of the 100% owned Hercules Silver Project, northwest of Cambridge, Idaho.

Hercules Silver Corp. 是一家初級礦業公司,專注於愛達荷州劍橋西北部100%擁有的Hercules Silver項目的勘探和開發。

The Hercules project is a disseminated silver-lead-zinc system with 28,000 meters of historical drilling across 3.5 kilometers of strike. The discovery of the new Leviathan porphyry copper system adds significant upside to the Property. The company is well positioned for growth through the drill bit, having completed extensive surface exploration consisting of soil and rock sampling, geological mapping, IP geophysics.

Hercules 項目是一個分佈式銀鉛鋅系統,在 3.5 千米的礦井中進行了28,000米的歷史鑽探。新的利維坦斑岩銅系統的發現爲該物業增加了顯著的上升空間。該公司已經完成了包括土壤和岩石採樣、地質測繪、知識產權地球物理學在內的廣泛的地表勘探,爲通過鑽頭實現增長做好了充分的準備。

The Company's management team brings significant exploration experience through the discovery and development of numerous precious metals projects worldwide.

該公司的管理團隊通過在全球範圍內發現和開發衆多貴金屬項目,帶來了豐富的勘探經驗。

For further information please contact:

欲了解更多信息,請聯繫:

Chris Paul
CEO & Director
Telephone +1 (604) 670-5527
Email: chris@herculessilver.com

克里斯·保羅
首席執行官兼董事
電話 +1 (604) 670-5527
電子郵件:chris@herculessilver.com

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. Any securities referred to herein have not and will not be registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws of an exemption from such registration is available.

本新聞稿不構成美國任何證券的賣出要約或收購要約的邀請。此處提及的任何證券過去和將來都不會根據經修訂的1933年《美國證券法》進行註冊(”《美國證券法》“) 或任何州證券法,除非根據美國證券法和適用的州證券法進行註冊,否則不得在美國境內或向美國人出售或出售,除非根據美國證券法和適用的州證券法進行註冊,可以豁免此類註冊。

Disclaimer for Forward-Looking Information

前瞻性信息免責聲明

This news release contains certain information that may be deemed "forward-looking information" with respect to the Company within the meaning of applicable securities laws. Such forward-looking information involves known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking information. Forward-looking information includes statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur. Forward-looking information contained in this press release may include, without limitation, the expected execution of future exploration programs on the Property; assay results of future drill holes; results of operations, and the expected financial performance of the Company.

本新聞稿包含某些信息,根據適用的證券法,這些信息可能被視爲與公司有關的 “前瞻性信息”。此類前瞻性信息涉及已知和未知的風險、不確定性和其他因素,這些因素可能導致公司的實際業績、業績或成就或行業發展與此類前瞻性信息所表達或暗示的預期業績、業績或成就存在重大差異。前瞻性信息包括不是歷史事實的陳述,通常以 “期望”、“計劃”、“預期”、“相信”、“打算”、“估計”、“項目”、“潛力” 和類似的表述來識別,或者事件或條件 “將”、“會”、“可能” 或 “應該” 發生。本新聞稿中包含的前瞻性信息可能包括但不限於該物業未來勘探計劃的預期執行情況;未來鑽孔的化驗結果;經營業績以及公司的預期財務業績。

Although the Company believes the forward-looking information contained in this news release is reasonable based on information available on the date hereof, by its nature, forward-looking information involves assumptions and known and unknown risks, uncertainties and other factors which may cause our actual results, level of activity, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information.

儘管根據本新聞稿發佈之日可用的信息,公司認爲本新聞稿中包含的前瞻性信息是合理的,但就其性質而言,前瞻性信息涉及假設以及已知和未知的風險、不確定性和其他因素,這些因素可能導致我們的實際業績、活動水平、業績或成就或其他未來事件與此類前瞻性信息所表達或暗示的任何未來業績、業績或成就存在重大差異。

Examples of such assumptions, risks and uncertainties include, without limitation, assumptions, risks and uncertainties associated with general economic conditions; the Covid-19 pandemic; adverse industry events; the receipt of required regulatory approvals and the timing of such approvals; that the Company maintains good relationships with the communities in which it operates or proposes to operate, future legislative and regulatory developments in the mining sector; the Company's ability to access sufficient capital from internal and external sources, and/or inability to access sufficient capital on favorable terms; mining industry and markets in Canada and generally; the ability of the Company to implement its business strategies; competition; the risk that any of the assumptions prove not to be valid or reliable, which could result in delays, or cessation in planned work, risks associated with the interpretation of data, the geology, grade and continuity of mineral deposits, the possibility that results will not be consistent with the Company's expectations, as well as other assumptions risks and uncertainties applicable to mineral exploration and development activities and to the Company, including as set forth in the Company's public disclosure documents filed on the SEDAR+ website at .

此類假設、風險和不確定性的示例包括但不限於與總體經濟狀況相關的假設、風險和不確定性;Covid-19疫情;不利的行業事件;所需的監管批准的獲得和此類批准的時間;公司與其運營或擬運營的社區保持良好關係;採礦業未來的立法和監管發展;公司從內部和外部來源獲得足夠資本的能力,和/或無法以優惠條件獲得足夠的資本;加拿大乃至整個採礦業和市場;公司實施業務戰略的能力;競爭;任何假設被證明無效或不可靠,可能導致計劃工作延遲或停止的風險,與數據解釋、礦牀的地質、品位和連續性相關的風險,結果與公司預期不一致的可能性以及其他假設風險和不確定性適用於礦產勘探和開發活動以及公司,包括公司在SEDAR+網站上提交的公開披露文件中規定的內容,網址爲。

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS PRESS RELEASE REPRESENTS THE EXPECTATIONS OF HERCULES SILVER AS OF THE DATE OF THIS PRESS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE HERCULES SILVER MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

本新聞稿中包含的前瞻性信息代表了赫拉克勒斯·西爾弗截至本新聞稿發佈之日的預期,因此,該日期之後可能會發生變化。讀者不應過分重視前瞻性信息,也不應像其他任何日期一樣依賴這些信息。儘管 HERCULES SILVER 可以選擇更新這些信息,但除非適用法律有要求,否則它不承諾在任何特定時間更新這些信息。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

多倫多證券交易所風險投資交易所及其監管服務提供商(該術語在多倫多證券交易所風險投資交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

________________________
1 1918. Hershey, O. Preliminary geological report on the Raymond and Allison groups, Washington County, Idaho

______________________
1 1918。俄亥俄州赫希愛達荷州華盛頓縣雷蒙德和艾莉森群的初步地質報告

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論