GPM Metals Update of Walker Gossan Project
GPM Metals Update of Walker Gossan Project
Toronto, Ontario--(Newsfile Corp. - November 6, 2023) - GPM Metals Inc. (TSXV: GPM) (the "Company" or "GPM") provides an update to its Walker Gossan Project, Arnhem Land, Australia.
安大略省多倫多--(Newsfile Corp.-2023 年 11 月 6 日)- GPM Metals Inc.(多倫多證券交易所股票代碼:GPM)(“公司” 或 “GPM”) 提供了其位於澳大利亞阿納姆地的 Walker Gossan 項目的最新信息。
GPM is pleased to announce that it has recently completed an Airborne Gravity Gradiometry (AGG) Survey over the Walker Gossan Project.
GPM很高興地宣佈,它最近完成了對沃克·戈桑項目的機載重力梯度測量(AGG)調查。
The survey cost of $270,000 has been partially offset by a $100,000 grant under the Geophysics Collaboration Program conducted by the Northern Territory Department of Industry, Tourism and Trade. We thank the Northern Territory Government for their assistance.
北領地工業、旅遊和貿易部開展的地球物理合作計劃下的10萬美元補助金部分抵消了27萬美元的調查成本。我們感謝北領地政府的援助。
The survey results will be available in late November. GPM will engage its exploration team to undertake a comprehensive review of the survey data.
調查結果將於11月下旬公佈。GPM將聘請其勘探團隊對調查數據進行全面審查。
This survey will provide invaluable insights into targets within the approved tenement areas.
這項調查將爲批准的物業單位區域內的目標提供寶貴的見解。
GPM Metals intends to continue with Exploration Programs for existing approved tenements EL385 and EL24305.
GPM Metals打算繼續對現有批准的 EL385 和 EL24305 礦權進行勘探計劃。
CONTACT INFORMATION
聯繫信息
For further information contact:
GPM Metals Inc.
Suite 1101 - 141 Adelaide Street West,
Toronto, Ontario M5H 3L5
Telephone : + 416 628-5904
Email: info@gpmmetals.com
欲了解更多信息,請聯繫:
GPM 金屬公司
阿德萊德西街 1101-141 號套房,
安大略省多倫多 M5H 3L5
電話:+ 416 628-5904
電子郵件:info@gpmmetals.com
Forward-0Looking Statements
前瞻性陳述
This news release contains certain forward-looking information and statements within the meaning of applicable securities laws. The use of any of the words "expect", "anticipate", "continue", "estimate", "may", "might", "will", "project", "should", "believe", "plans", "intends" and similar expressions are intended to identify forward-looking information and/or statements. Forward-looking statements and/or information are based on a number of material factors, expectations and/or assumptions of GPM which have been used to develop such statements and/or information but which may prove to be incorrect. Although GPM believes that the expectations reflected in such forward-looking statements and/or information are reasonable, undue reliance should not be placed on forward-looking statements as GPM can give no assurance that such expectations will prove to be correct. In addition to other factors and assumptions which may be identified herein, assumptions have been made regarding, among other things: results from planned exploration and drilling activities; GPM's future plans for operational expenditures; the accuracy of the interpretations of exploration and drilling activity results; availability of financing to fund current and future plans and expenditures; the impact of increasing competition; the general stability of the economic and political environment in which GPM has property interests; the general continuance of current industry conditions; aboriginal matters; the timely receipt of any required regulatory approvals; the ability of GPM to obtain qualified staff, equipment and/or services in a timely and cost efficient manner; the ability of the operator of each project in which GPM has property interests to operate in a safe, efficient and/or effective manner and to fulfill its respective obligations and current plans; future commodity prices; currency, exchange and/or interest rates; and the regulatory framework regarding royalties, taxes and/or environmental matters in the jurisdictions in which GPM has property interests. The forward-looking information and statements included in this news release are not guarantees of future performance and should not be unduly relied upon. Such information and/or statements, including the assumptions made in respect thereof, involve known and unknown risks, uncertainties and other factors that may cause actual results and/or events to differ materially from those anticipated in such forward-looking information and/or statements including, without limitation: risks associated with the uncertainty of exploration results and estimates, currency fluctuations, the uncertainty of conducting operations under a foreign regime, exploration risk, the uncertainty of obtaining all applicable regulatory approvals, the availability of labour and/or equipment, the fluctuating prices of commodities, the availability of financing and GPM's dependence on its management personnel, other participants in the property areas and/or certain other risks detailed from time-to-time in GPM's public disclosure documents, (including, without limitation, those risks identified in this news release and GPM's current management's discussion and analysis). Furthermore, the forward-looking statements contained in this news release are made as at the date of this news release and the Company does not undertake any obligations to publicly update and/or revise any of the included forward-looking statements, whether as a result of additional information, future events and/or otherwise, except as may be required by applicable securities laws.
本新聞稿包含適用證券法所指的某些前瞻性信息和陳述。使用 “期望”、“預期”、“繼續”、“估計”、“可能”、“可能”、“將”、“項目”、“應該”、“相信”、“計劃”、“打算” 和類似表述中的任何詞語均旨在識別前瞻性信息和/或陳述。前瞻性陳述和/或信息基於GPM的許多重要因素、預期和/或假設,這些因素用於制定此類陳述和/或信息,但可能被證明是不正確的。儘管GPM認爲此類前瞻性陳述和/或信息中反映的預期是合理的,但不應過分依賴前瞻性陳述,因爲GPM無法保證此類預期會被證明是正確的。除了本文可能確定的其他因素和假設外,還對以下方面做出了假設:計劃勘探和鑽探活動的結果;GPM未來的業務支出計劃;對勘探和鑽探活動結果解釋的準確性;爲當前和未來計劃和支出提供資金的資金的可得性;競爭加劇的影響;GPM擁有財產利益的經濟和政治環境的總體穩定性;當前的行業狀況;原住民事務;及時收到任何必要的監管批准;GPM及時和具有成本效益的方式獲得合格員工、設備和/或服務的能力;GPM擁有財產權益的每個項目的運營商以安全、高效和/或有效的方式運營並履行其各自義務和當前計劃的能力;未來的商品價格;貨幣、匯率和/或利率;以及有關特許權使用費、稅收和/或環境的監管框架重要的是GPM 擁有財產權益的司法管轄區。本新聞稿中包含的前瞻性信息和陳述不能保證未來的表現,不應過度依賴。此類信息和/或陳述,包括就此作出的假設,涉及已知和未知的風險、不確定性和其他因素,可能導致實際結果和/或事件與此類前瞻性信息和/或陳述中的預期存在重大差異,包括但不限於:與勘探結果和估計的不確定性相關的風險、貨幣波動、在外國制度下開展業務的不確定性、勘探風險、獲得所有適用監管的不確定性批准、勞動力和/或設備的可用性、大宗商品價格的波動、融資的可得性以及GPM對管理人員、房地產領域其他參與者的依賴和/或GPM公開披露文件中不時詳述的某些其他風險(包括但不限於本新聞稿和GPM現任管理層的討論和分析中確定的風險)。此外,本新聞稿中包含的前瞻性陳述是截至本新聞稿發佈之日作出的,除非適用的證券法另有要求,否則公司不承擔任何義務公開更新和/或修改所包含的任何前瞻性陳述,無論這些陳述是由於其他信息、未來事件和/或其他原因造成的。
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy and / or accuracy of this release
多倫多證券交易所風險交易所及其監管服務提供商(該術語在多倫多證券交易所風險交易所的政策中定義)均不對本新聞稿的充分性和/或準確性承擔責任
To view the source version of this press release, please visit
要查看本新聞稿的源版本,請訪問