share_log

Grid Metals Corp Reports Positive Metallurgical Test Results From Donner Lake Lithium Property

Grid Metals Corp Reports Positive Metallurgical Test Results From Donner Lake Lithium Property

Grid Metals Corp. 报告唐纳湖锂业的冶金测试结果呈阳性
Accesswire ·  2023/06/26 07:00

TORONTO, ON / ACCESSWIRE / June 26, 2023 / Grid Metals Corp. (TSXV:GRDM)(OTCQB:MSMGF) ("Grid " or the "Company") is pleased to announce positive initial results from metallurgical tests carried out on drill core samples from its 75% owned Donner Lake Lithium Property. Samples were taken from the Main and Northwest Dykes that together are the subject of an initial NI 43-101 resource estimate currently underway.

多伦多,on/ACCESSWIRE/2023年6月26日/Grid Metals Corp.(多伦多证券交易所股票代码:GRDM)(场外交易市场代码:MSMGF)公司很高兴地宣布,对其拥有75%股权的顿纳湖锂矿的钻芯样品进行了冶金测试,取得了积极的初步结果。样本取自主要堤坝和西北堤坝,这两个堤坝一起是目前正在进行的NI 43-101资源初步评估的主题。

Mineralogical assessment and a bench scale metallurgical test program on composites representing a number of the drill core intervals were completed at XPS Expert Process Solutions, a GLENCORE Company, in Sudbury, Ontario (XPS). XPS is an experienced provider of metallurgical testwork to the lithium industry. The mineralogical study positively identified the main lithium-bearing mineral in the samples as spodumene, the preferred mineral of concentrate feedstock for conversion facilities globally. The bench scale metallurgical testing produced excellent recoveries and marketable concentrate grades.

在安大略省萨德伯里的Glencore公司旗下XPS Expert Process Solutions(XPS)完成了对代表若干钻芯间隔的复合材料的矿物学评估和实验室规模冶金测试计划。XPS是一家经验丰富的锂行业冶金测试供应商。矿物学研究证实,样品中的主要含锂矿物为锂辉石,这是全球转化设施精矿原料的首选矿物。小试冶金试验获得了良好的回收率和市场上的精矿品位。

Highlights from the program were as follows:

节目的亮点如下:

  • Lithium recoveries (expressed as Li2O) to concentrates of 76.9% (Northwest Dyke) and 74.1% (Main Dyke) were achieved using standard grinding and direct flotation methods.
  • Both composite samples produced quality lithium concentrates - 6.2% Li2O for the Northwest Dyke and 5.7% Li2O for the Main Dyke.
  • Head grades (as Li2O %) for the Main and Northwest Dyke composite samples were 1.46% and 1.34 %, respectively, approximating average exploration drilling grades obtained in Grid's drill campaigns.
  • Iron content of the concentrates was low.
  • The mineralogical analyses completed as part of the testwork program found that the main lithium carrier by grade was spodumene, which accounted for 89.3% of the lithium in the Main Dyke and 94.9% of the lithium in the Northwest Dyke.
  • The report was successful in recommending an optimal grind size to maximize recovery from both of the Main Dyke and the Northwest Dyke composites.
  • The report concluded that standard flotation was the best method for recovering lithium from the samples. Testing of Heavy Liquid Separation, as an initial evaluation of the Dense Media Separation process, was conducted and it was determined that this process would not be of material value for enhancing lithium recovery.
  • 锂的回收(表示为Li2.O)浓缩76.9%(西北堤)及74.1%(主堤)是通过使用标准磨矿和直接浮选方法:研究方法。
  • 这两个复合样品都产生了优质锂精矿-6.2%2.O对于西北堤坝和5.7%Li2.O为主堤。
  • 校长职级(Li饰)2.主要和西北堤防复合样品的平均勘探钻探品位分别为1.46%和1.34%,接近网格钻探活动中获得的平均勘探钻探品位。
  • 精矿中铁含量低。
  • 作为测试工作计划的一部分完成的矿物学分析发现锂的主要载体是锂辉石,其中占到了89.3%主堤坝中的锂元素94.9%西北部堤坝中的锂元素。
  • 该报告成功地推荐了最佳研磨粒度,以最大限度地从主堤和西北堤复合材料中回收。
  • 报告得出结论,标准浮选是从样品中回收锂的最佳方法。作为对重介质分离工艺的初步评价,进行了重液分离试验,确定该工艺对提高锂回收率没有实质性价值。

With a successful initial metallurgical program now completed the Company plans to continue additional metallurgical testing in the future and has an upcoming program of complementary metallurgical testwork to be completed at the Tanco Mine. The initial work at Tanco will provide analysis of the potential recovery of Donner Lake material from the Tanco lithium spodumene circuit. Tanco is one of two currently producing lithium operations in Canada and Grid has a Memorandum of Understanding with Sinomine Canada regarding toll milling of material from Donner Lake at the Tanco Mine. In addition, the Company will follow up on recommendations from the XPS report to complete variability testing on future composite samples from the Main and Northwest Dykes.

随着成功的初步冶金项目现已完成,公司计划在未来继续进行额外的冶金测试,并将在Tanco矿完成即将完成的补充冶金测试工作计划。Tanco的初步工作将分析从Tanco锂锂辉石回路中回收东纳湖物质的可能性。Tanco是目前在加拿大生产锂的两家公司之一,GRID与Sinomine Canada签署了一份谅解备忘录,内容是在Tanco矿对Donner湖的材料进行收费碾磨。此外,本公司将跟进XPS报告中的建议,以完成对主堤和西北堤坝未来合成样品的变异性测试。

"We are pleased to now have tangible met test results confirming that spodumene is the dominant lithium mineral and that standard flotation processing appears to be effective at recovering lithium to a marketable concentrate" said Robin Dunbar, CEO of Grid Metals. This is another positive initial milestone for the Donner Lake Lithium Property" he added.

Grid Metals首席执行官Robin Dunbar表示:“我们很高兴现在有了切实的MET测试结果,证实锂辉石是主要的锂矿物,标准浮选工艺似乎有效地将锂回收到市场上的精矿。”这是东纳湖锂矿又一个积极的初步里程碑。

Grid anticipates announcing the results of an initial resource estimate from the Donner Lake Lithium Property in the coming weeks. The Company has also commenced field operations to follow up on lithium exploration targets that were identified by lithogeochemical data collected during the summer/fall field program in 2022.

栅极预计将公布初步资源估计的结果在接下来的几周里从唐纳湖锂矿开采出来。该公司还已开始现场作业,以跟进2022年夏/秋季油田计划期间收集的岩石地球化学数据确定的锂勘探目标。

Dr. Dave Peck, P.Geo., has reviewed and approved the technical content of this release.

P.Geo的Dave Peck博士已审核并批准了本新闻稿的技术内容。

About Grid Metals Corp.

关于网格金属公司

Grid Metals is focused on both lithium and Ni-Cu-PGM in the Bird River area approximately 150 km north east of Winnipeg Manitoba. The Donner Lake Lithium Property is a 75% owned property subject to a joint venture agreement where the joint venture partner has the right to purchase 20% of the 100% owned Grid subsidiary that owns its 75% Donner Lake interest. In addition to activity at Donner Lake the Company has the Falcon West Lithium Property located southeast of Winnipeg and a PEA stage Ni-Cu-PGM-Co project (Makwa-Mayville) undergoing exploration and development activity.

Grid Metals的重点是位于温尼伯-马尼托巴省东北约150公里处的伯德河地区的锂和镍-铜-铂矿。唐纳湖锂矿是一处拥有75%股权的物业,受合资协议的约束,合资伙伴有权购买拥有其75%权益的电网子公司20%的股份。除了在唐纳湖的活动外,该公司还拥有位于温尼伯东南的Falcon West Lithium资产,以及正在进行勘探和开发活动的PEA阶段Ni-Cu-PGM-Co项目(Makwa-Mayville)。

On Behalf of the Board of Grid Metals Corp.
For more information about the Company please see the Company website at or contact:
Robin Dunbar - President, CEO & Director Telephone: 416-955-4773 Email: rd@gridmetalscorp.com
David Black - Investor Relations Email: info@gridmetalscorp.com

代表电网金属公司董事会。
欲了解更多有关本公司的信息,请访问本公司网站或联系:
董事首席执行官罗宾·邓巴-总裁电话:416-955-4773电子邮件:rd@gridmetalcorp.com
David·布莱克-投资者关系部电子邮件:info@gridmetalcorp.com

We seek safe harbour. This news release contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of the Securities Act (Ontario) (together, "forward-looking statements"). Such forward-looking statements include the Company's closing of the proposed financial transactions, sale of royalty and property interests. the overall economic potential of its properties, the availability of adequate financing and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements expressed or implied by such forward- looking statements to be materially different. Such factors include, among others, risks and uncertainties relating to potential political risk, uncertainty of production and capital costs estimates and the potential for unexpected costs and expenses, physical risks inherent in mining operations, metallurgical risk, currency fluctuations, fluctuations in the price of nickel, cobalt, copper and other metals, completion of economic evaluations, changes in project parameters as plans continue to be refined, the inability or failure to obtain adequate financing on a timely basis, and other risks and uncertainties, including those described in the Company's Management Discussion and Analysis for the most recent financial period and Material Change Reports filed with the Canadian Securities Administrators and available at .

我们寻求安全的避风港。本新闻稿包含1995年美国私人证券诉讼改革法所指的前瞻性陈述和(安大略省)证券法所指的前瞻性信息(统称为“前瞻性陈述”)。这些前瞻性陈述包括该公司完成拟议的金融交易、出售特许权使用费和财产权益。该公司物业的整体经济潜力、充足融资的可获得性以及可能导致该等前瞻性表述明示或暗示的实际结果、业绩或成就存在重大差异的已知和未知风险、不确定因素和其他因素。这些因素包括,与潜在的政治风险有关的风险和不确定因素,生产和资本成本估算的不确定性,以及可能出现意外成本和开支的可能性,采矿作业固有的实物风险,冶金风险,货币波动,镍、钴、铜和其他金属价格的波动,经济评估的完成,随着计划的不断完善项目参数的变化,无法或未能及时获得足够的融资,以及其他风险和不确定性,包括公司最近财务期间的管理讨论和分析以及提交给加拿大证券管理人的重大变化报告中描述的风险和不确定性

Neither the TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

多伦多证券交易所及其法规服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

This news release does not constitute an offer of securities for sale in the United States. The securities being offered have not been, nor will they be, registered under the United States Securities Act of 1933, as amended, and such securities may not be offered or sold within the United States absent U.S. registration or an applicable exemption from U.S. registration requirements.

本新闻稿不构成在美国出售证券的要约。正在发行的证券尚未在美国注册,也不会在美国注册1933年证券法,并且在没有美国注册或适用的豁免美国注册要求的情况下,此类证券不得在美国境内发行或销售。

SOURCE: Grid Metals Corp.

资料来源:格栅金属公司


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发