share_log

Additional High-Grade, Visible Gold Drilling Results From the Chance Zone at Blue Lagoon's Dome Mountain Project

Additional High-Grade, Visible Gold Drilling Results From the Chance Zone at Blue Lagoon's Dome Mountain Project

蓝泻湖穹顶山项目机会区额外的高品位可见金矿钻探结果
Accesswire ·  2022/04/20 09:05

VANCOUVER, BC / ACCESSWIRE / April 20, 2022 / Blue Lagoon Resources Inc. (the "Company") (CSE:BLLG);(FSE:7BL);(OTCQB:BLAGF) is pleased to announce that recent lab results from its 2021 Phase Two program has encountered high-grade vein intercepts, some with visible gold, at the Company's 100% owned, year-round accessible, Dome Mountain Gold Project located a short 50-minute drive from Smithers, B.C.

温哥华,卑诗省/ACCESSWIRE/2022年4月20日/蓝泻湖资源公司(“公司)(CSE:BLG);(FSE:7BL);(OTCQB:BLAGF)高兴地宣布,其2021年第二阶段计划的最新实验室结果在公司100%拥有的、全年可达的穹顶山黄金项目中遇到了高品位矿脉截获,其中一些具有可见的黄金,该项目距离不列颠哥伦比亚省史密瑟斯仅50分钟的车程。

Highlights:

重点:

  • 16.8 g/t Au over 0.42 meters, 22.12 g/t Au over 2.14 meters and 33.08 g/t Au over 1.40 meters in hole DM-21-200
  • 10.51 g/t Au over 1.05 meters and 14.49 g/t Au over 1.91 meters in hole DM-21-206 with visible gold
  • 0.42米以上16.8克/吨金,2.14米以上22.12克/吨金,1.40米以上33.08克/吨金在DM-21-200井中
  • 1.05米以上10.51克/吨Au和1.91米以上14.49 g/t Au在DM-21-206洞中可见的金子

Significant assays from new results for holes drilled in the Chance Zone are fully summarized in Table 1. These results continue to show the high degree of prospectivity offered by the Chance Zone and clearly indicate that follow-up drilling is warranted.

表1全面总结了对机会区钻孔的新结果进行的重要分析。这些结果继续显示机会区提供的高度前景,并清楚地表明后续钻探是有必要的。

Drilling in the Chance Zone was designed to test this northwest trending structural zone for high-grade quartz carbonate veins. Multiple holes were drilled from the same pads at varying azimuths designed to test the boundaries of the structural zone. Recent results show multiple new veins were hit in most holes including DM-21-200 which encountered 16.8 g/t Au over 0.42 meters; 22.12 g/t Au over 2.14 meters and 33.08 g/t Au over 1.40 meters and hole DM-21-206 which encountered 10.51 g/t Au over 1.05 meters and 14.49 g/t Au over 1.91 meters including some intervals displaying visible gold (Figure 1).

Chance Zone的钻探旨在测试这一西北向构造带的高品位石英碳酸盐矿脉。为了测试构造区的边界,在不同的方位从相同的衬垫上钻出了多个孔。最近的结果显示,包括DM-21-200在内的大多数井眼都有多条新静脉被击中0.42米以上16.8克/吨金;2.14米以上22.12克/吨金;1.40米以上33.08克/吨金S和DM-21-206井遇到1.05米以上10.51克/吨Au和1.91米以上14.49 g/t Au包括一些间隔显示可见的金子(图1)。

Gold mineralization is consistently associated with quartz-carbonate veins displaying pyrite and other sulfides including galena, sphalerite, arsenopyrite and chalcocite. Strong carbonate wall rock alteration is ubiquitous and narrow, zone parallel quartz carbonate veinlets up to 30-50 veins per meter are common in the hangingwall and footwall of mineralized zones.

金矿化与显示黄铁矿和方铅矿、闪锌矿、毒砂、辉铜矿等其他硫化物的石英-碳酸盐矿脉一致。强烈的碳酸盐岩围岩蚀变普遍且范围狭窄,矿化带的上盘和下盘中常见的条带平行的石英碳酸盐细脉可达每米30~50条。

Hole DM-21-200 was drilled from a pad 275 meters southwest of the pad for holes DM-21-186 (with visible gold) through DM-21-189. Hole 200 was drilled sub-vertical (-85 degrees) and encountered sulfide rich quartz carbonate veins between 77.5 meters to 78.9 meters that contained 10% pyrite and trace to 2% arsenopyrite that grade 33.08 g/t Au and 72.3 g/t Ag.

DM-21-200孔是从垫片西南275米处钻出的,用于DM-21-186孔(可见金色)至DM-21-189孔。200孔在近垂直(-85度)处钻进,在77.5~78.9米处遇到富含硫化物的石英碳酸盐脉,含黄铁矿10%,含2%毒砂,Au品位33.08 g/t,Ag品位72.3 g/t。

Hole DM-21-206 was drilled from a pad located 130 meters southeast of hole DM-21-200. Hole 206 was drilled at an azimuth of 235 degrees and at a -50 degree inclination and encountered a 1.91 meters intercept from 101.32 to 103.23 meters, including visible gold at 103.10 meters, that grades 14.49 g/t Au and 29.2 g/t Ag hosted within a quartz carbonate vein with up to 20% pyrite.

DM-21-206孔是在DM-21-200孔东南130米处的一个垫子上钻成的。206号孔的方位角为235度,倾角为-50度,从101.32米到103.23米的距离为1.91米,其中包括103.10米处的可见金,金的品位为14.49g/t,银的品位为29.2g/t,赋存于黄铁矿含量高达20%的石英碳酸盐矿脉中.

"The significance of these intercepts cannot be understated" said Bill Cronk, Chief Geologist for Blue Lagoon Resources. "Most holes drilled thus far have encountered multiple high-grade veins highlighting the fact that there are many new veins for follow up within the prolific newly identified Chance Structural Zone. Only about 1/3 of the strike of this zone has been tested and every single pad drilled to date has resulted in significant gold intercepts," he added.

蓝色泻湖资源公司的首席地质学家比尔·克朗克说:“这些拦截的重要性不容小觑。”他补充道:“到目前为止,大多数钻孔都遇到了多个高品位矿脉,这突显了这样一个事实,即在多产的新发现的Chance构造带内,有许多新的矿脉需要跟进。该带只有大约三分之一的走向进行了测试,迄今钻探的每一个垫子都导致了重大的黄金截获。”

Figure 1

图1

TABLE 1

表1

*True widths not yet defined

*尚未定义真实宽度

Geological, geochemical and structural data and observations support the current deposit model as a carbonate-hosted, base metal gold (alkali gold) deposit.

地质、地球化学和构造数据和观察结果支持目前的矿床模式为碳酸盐赋存的贱金属金(碱金)矿床。

QUALITY ASSURANCE AND CONTROL
Core selected for sampling was cut in half with a core saw or split with a hydraulic splitter with one half bagged for shipping. Strict chain of custody storing, and shipping protocol was maintained. All core preparation and analyses were completed by Bureau Veritas Minerals, located in Vancouver, BC. Core was crushed, split, and pulverized with 250 grams passing 200 mesh. Each sample was analyzed for gold by fire assay with ICP-MS finish (BVM code FA350) and for multi-elements by 4-acid digestion ICP with ES finish (BVM code MA250) Any gold overlimits (>10 ppm Au) were analyzed with by gravimetric fire assay (BVM code FA550). Standards and Blanks were inserted by Company staff. The sampling program was undertaken by Company personnel by and under the direction of Lorrie Farrell P.Geo.

质量保证和控制
选择取样的岩芯用岩心锯切成两半,或用液压劈裂器将一半装袋运输。严格的保管、储存和运输协议都得到了维护。所有的岩心准备和分析都由位于不列颠哥伦比亚省温哥华的Bureau Veritas Minerals完成。芯子被粉碎、劈裂和粉碎,250克通过200目。每个样品用火焰试金分析金(BVM代号FA350),多元素分析用4酸消解-ES光洁剂(BVM代号MA250)。任何金的超标(>10ppm Au)用重量火试金分析(BVM代号FA550)。标准和空白是由公司员工插入的。抽样计划由公司人员在Lorrie Farrell P.Geo的指导下进行。

The scientific and technical data contained in this news release was approved by William Cronk, P.Geo., a qualified person as defined in NI 43-101 and a consultant to the Company.

本新闻稿中包含的科学和技术数据由William Cronk,P.Geo批准,他是NI 43-101中定义的合格人员,也是公司的顾问。

For further information, please contact:
Rana Vig
President and Chief Executive Officer
Telephone: 604-218-4766
Email: rana@ranavig.com

如需更多信息,请联系:
拉娜·维格
总裁兼首席执行官
电话:604-218-4766
电子邮件:raa@ranavig.com

The CSE has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. Statement Regarding Forward-Looking Information: This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that Blue Lagoon Resources Inc. (the "Company") expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include results of exploration activities may not show quality and quantity necessary for further exploration and exploitation of minerals deposits, market prices, and continued availability of capital and financing, permitting and other approvals, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

CSE未对本新闻稿的充分性或准确性进行审查,也不承担任何责任。关于前瞻性信息的陈述:本新闻稿包括某些可被视为“前瞻性陈述”的陈述。本新闻稿中除有关历史事实的陈述外,涉及Blue Lagoon Resources Inc.(以下简称“公司”)预期发生的事件或发展的所有陈述均为前瞻性陈述。前瞻性陈述是指不是历史事实的陈述,一般但并非总是以“预期”、“计划”、“预期”、“相信”、“打算”、“估计”、“项目”、“可能”和类似的表述,或事件或条件“将”、“将”、“可能”、“可能”或“应该”发生。尽管公司认为这些前瞻性陈述中表达的预期是基于合理的假设,但这些陈述并不能保证未来的业绩,实际结果可能与前瞻性陈述中的结果大不相同。可能导致实际结果与前瞻性表述中的结果大不相同的因素包括:勘探活动的结果可能没有显示进一步勘探和开采矿藏所需的质量和数量、市场价格、资本和融资的持续可获得性、许可和其他批准以及一般经济、市场或商业条件。请投资者注意,任何此类陈述都不是对未来业绩的保证,实际结果或发展可能与前瞻性陈述中预测的大不相同。前瞻性陈述是基于公司管理层在陈述发表之日的信念、估计和意见。除适用的证券法另有规定外, 如果管理层的信念、估计或意见或其他因素发生变化,公司不承担更新这些前瞻性陈述的义务。

SOURCE: Blue Lagoon Resources Inc.

资料来源:蓝色泻湖资源公司。


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发