share_log

United Lithium Corp Adds Second Drill to the Bergby Lithium Project

United Lithium Corp Adds Second Drill to the Bergby Lithium Project

联合锂公司为Bergby锂项目增加第二个钻探
GlobeNewswire ·  2022/02/17 02:12

Figure 1

图1

Second drill for the Bergby Lithium Project
Bergby锂项目的第二次钻探

VANCOUVER, British Columbia, Feb. 17, 2022 (GLOBE NEWSWIRE) -- United Lithium Corp. (CSE: ULTH; OTC: ULTHF; FWB: 0UL) ("ULTH" or the "Company"), is pleased to announce a second rig will begin drilling next week at the Bergby lithium project in Sweden. Doubling the drilling production rate will accelerate the project and enable new target areas to be tested sooner. The Company is seeking to add a third drill to the project, with the capacity to maneuver across rough terrain while maintaining a minimal environmental footprint.

温哥华,不列颠哥伦比亚省,2022年2月17日(环球通讯社)联合锂公司(CSE:ULTH;场外交易:超高频;FWB:0UL) ("ULTH“或”公司),很高兴地宣布,第二个钻井平台将于下周开始在瑞典的Bergby锂项目钻探。将钻井生产率提高一倍将加速该项目,并使新的目标区域能够更快地进行测试。该公司正寻求在该项目中增加第三个钻机,能够在保持最小环境足迹的同时,在崎岖的地形上机动。

A photo accompanying this announcement is available at

随附此公告的照片可在以下网址查阅:

"We are pleased with the progress we have made since drilling started last fall, and recognize that the best stage of the mining cycle to compress time is exploration," states the Company's President and CEO Michael Dehn. "With a large under-explored property with surface showings that are kilometres apart in areas littered with boulders has presented a mobility challenge, but the ingenuity of the Swedish drillers has provided solutions for us."

该公司总裁兼首席执行官迈克尔·德恩表示:“我们对自去年秋天开始钻探以来取得的进展感到高兴,并认识到开采周期中压缩时间的最佳阶段是勘探。”“这里有一处未被开发的大型地产,地面露出的地方相距数公里,散落着巨石,这给流动性带来了挑战,但瑞典钻探者的聪明才智为我们提供了解决方案。”

Drilling is expected to continue through 2022. With two drills on the property, one will continue exploration test and step-out drilling, while the second drill infills and extends mineralization in known lithium-bearing pegmatites.

钻探预计将持续到2022年。随着两次钻探,其中一次将继续勘探测试和分步钻探,而第二次钻探充填并延伸了已知的含锂伟晶岩中的矿化。

Mark Saxon (FAusMM), Technical Advisor to the Company, is a qualified person as defined by National Instrument 43-101 (Standards of Disclosure for Mineral Projects) and has prepared or reviewed the scientific and technical information in this press release.

公司技术顾问Mark Saxon(FAusMM)是National Instrument 43-101(矿产项目披露标准)定义的合格人员,他已准备或审阅了本新闻稿中的科学技术信息。

On behalf of the Board of Directors,
United Lithium Corp.

我谨代表董事会:
联合锂公司(United Lithium Corp.)

Michael Dehn, President, CEO and Director

董事总裁、首席执行官迈克尔·德恩

For further information, please contact the Company at:
michaeldehn@unitedlithiumcorp.com

如需更多信息,请与本公司联系,网址为:
邮箱:michaeldehn@unitedlithiumcorp.com

About United Lithium Corp.
United Lithium Corp. (CSE: ULTH) is an exploration & development company energized by the global demand for lithium. The Company is targeting lithium projects in politically safe jurisdictions with advanced infrastructure that allows for rapid and cost-effective exploration, development and production opportunities.

联合锂公司简介
联合锂公司(CSE:ULTH)是一家受全球锂需求推动的勘探开发公司。该公司的目标是政治上安全的司法管辖区的锂项目,这些项目拥有先进的基础设施,可以提供快速、经济高效的勘探、开发和生产机会。

The Company's consolidated financial statements and related management's discussion and analysis are available on the Company's website at or under its profile on SEDAR at .

公司的综合财务报表和相关管理层的讨论和分析可在公司网站上的SEDAR简介下查阅,网址为:。

Forward Looking Statements

前瞻性陈述

This news release contains "forward-looking information" within the meaning of applicable securities laws, including in relation to statements regarding the Company's business and plans, including with respect to undertaking further acquisitions and carrying out exploration activities in respect of its mineral projects, including the Project. Although the Company believes that the expectations reflected in the forward-looking information are reasonable, there can be no assurance that such expectations will prove to be correct. Readers are cautioned not to place undue reliance on forward-looking information. Such forward-looking statements are subject to risks and uncertainties that may cause actual results, performance and developments to differ materially from those contemplated by these statements depending on, among other things, the risks that the Company does not complete any further acquisitions; that the Company does not carry out exploration activities in respect of its mineral projects, including the Project, as planned (or at all); and that the Company may not be able to carry out its business plans as expected. Except as required by law, the Company expressly disclaims any obligation and does not intend to update any forward-looking statements or forward-looking information in this news release. Although the Company believes that the expectations reflected in the forward-looking information are reasonable, there can be no assurance that such expectations will prove to be correct and makes no reference to profitability based on sales reported. The statements in this news release are made as of the date of this release.

本新闻稿包含适用证券法所指的“前瞻性信息”,包括有关该公司业务和计划的陈述,包括对其矿产项目(包括该项目)进行进一步收购和进行勘探活动的陈述。尽管公司认为前瞻性信息中反映的预期是合理的,但不能保证这些预期将被证明是正确的。提醒读者不要过度依赖前瞻性信息。这些前瞻性陈述会受到风险和不确定性的影响,可能会导致实际结果、业绩和发展与这些陈述预期的结果、业绩和发展大不相同,这些风险包括(但不限于)公司未完成任何进一步收购的风险;公司未按计划(或根本没有)进行包括该项目在内的矿产项目的勘探活动;以及公司可能无法按预期执行其业务计划。除法律另有规定外,公司明确表示不承担任何义务,不打算更新本新闻稿中的任何前瞻性陈述或前瞻性信息。尽管公司认为前瞻性信息中反映的预期是合理的,但不能保证这些预期将被证明是正确的,也不能参考基于报告的销售额的盈利能力。本新闻稿中的陈述是截至本新闻稿发布之日作出的。

The CSE does not accept responsibility for the adequacy or accuracy of this release

CSE不对本新闻稿的充分性或准确性承担责任


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发