share_log

PetroSun Announces Upcoming Lithium Demonstration Project and Provides Update Regarding Helium Drilling Activity

PetroSun Announces Upcoming Lithium Demonstration Project and Provides Update Regarding Helium Drilling Activity

PetroSun公司宣布即将到来的锂示范项目并提供有关氦钻探活动的最新情况
Accesswire ·  2022/02/09 07:36

Demonstration Project Will Utilize Proprietary and Exclusively Licensed Technology
• Demonstrations Are Expected to Extract Lithium and Rare Metals from Raw Ore
• PetroSun Also Announces Three Drilling Projects to Further Develop Helium Assets

示范项目将采用专有和独家许可的技术
·预计将举行示威活动,从原材料中提取锂和稀有金属
·PetroSun还宣布了三个钻探项目,以进一步开发氦资产

PHOENIX, AZ / ACCESSWIRE / February 9, 2022 / PetroSun, Inc. (OTC PINK:PSUD)(the "Company"), concurrently with the comprehensive recapitalization that it separately announced today, announced a demonstration project in Phoenix, Arizona that is expected to extract lithium from raw ore taken from the Company's mining concessions in northern Mexico using its patented and exclusively licensed lithium separation technologies. The Company also provided an update regarding its developmental drilling activities relating to helium targets in the Holbrook Basin of Arizona and the Golden Eagle Gas Field of Utah.

亚利桑那州凤凰城/ACCESSWIRE/2022年2月9日/PetroSun公司(场外交易代码:PSUD)(以下简称“公司”)在今天宣布进行全面资本重组的同时,宣布了在亚利桑那州凤凰城的一个示范项目,该项目预计将利用其专利和独家许可的锂分离技术,从该公司在墨西哥北部采矿特许权中开采的原矿石中提取锂。该公司还提供了与亚利桑那州霍尔布鲁克盆地和犹他州金鹰气田氦目标相关的开发钻探活动的最新情况。

The lithium processing demonstration project announced by the Company will utilize a prototype processing train designed to extract lithium and other elements from raw ore using the Company's patented and licensed technologies. The project will be set up in Phoenix, Arizona, and demonstrations are expected to commence in the spring of 2022. The demonstration project is expected to extract lithium from raw ore from the Company's Mexican concessions and from brine water from U.S. sources.

该公司宣布的锂加工示范项目将利用一个原型加工列车,利用该公司的专利和许可技术从原矿石中提取锂和其他元素。该项目将在亚利桑那州凤凰城设立,示威活动预计将于2022年春季开始。该示范项目预计将从该公司墨西哥特许权的原始矿石和美国来源的盐水中提取锂。

PetroSun, Inc. President Gordon M. LeBlanc, Jr. commented that, "The demonstration project represents the culmination of years of investment by the Company in leading-edge technologies, which we expect to apply to our portfolio of lithium projects, among other potential uses. We expect the Company's patented, owned and licensed technologies to allow the extraction of lithium and rare metals at a lower cost and using less water than comparable processes. Moreover, our planned extraction facilities are modular and mobile, providing the Company with flexibility to deploy the technology to address diverse opportunities."

PetroSun,Inc.总裁小戈登·M·勒布朗(Gordon M.LeBlanc,Jr.)他评论说:“这个示范项目代表着公司多年来对尖端技术的投资达到顶峰,我们预计这些技术将应用于我们的锂项目组合,以及其他潜在用途。我们预计,公司的专利、拥有和许可的技术将允许以比可比工艺更低的成本和更少的水提取锂和稀有金属。此外,我们计划的提取设施是模块化和移动式的,为公司提供了灵活地部署技术以应对不同机会的能力。”

In the Company's helium segment, PetroSun intends to drill and complete one to two wells in the Holbrook Basin over the next ninety days. The wellbores are expected to provide well control data that will assist in proving up helium reserves and additional production to support a helium processing plant.

在该公司的氦气部分,太阳石油公司打算在未来90天内在霍尔布鲁克盆地钻探和完成一至两口油井。这些钻井预计将提供井控数据,这些数据将有助于证明氦储量和额外产量,以支持一个氦加工厂。

The Company also announced that it intends to commence recompletion operations within the next ninety days on an extended lateral line to an existing well in the Golden Eagle Gas Field in Utah. The Company is targeting a 7,500-foot lateral line, which will be completed within the Ismay formation.

该公司还宣布,它打算在未来90天内开始在犹他州金鹰气田一口现有油井的延伸侧线上进行重完井作业。该公司的目标是一条7500英尺长的侧线,将在伊斯梅地层内完成。

Mr. LeBlanc commented, "All three of the planned drilling projects are part of PetroSun's helium development program. We expect drilling and completion of these two Holbrook Basin wells and the recompletion of the well in the Golden Eagle Gas Field to prove up helium reserves and to support helium processing plants within these fields. In addition to helium, we expect our wells at Golden Eagle will also produce natural gas."

勒布朗评论说,“这三个计划中的钻井项目都是太阳石油公司氦开发计划的一部分。我们预计这两口霍尔布鲁克盆地油井的钻探和完工,以及金鹰气田油井的重新完工,将证明氦储量,并支持这些气田内的氦加工厂。除了氦,我们预计我们在金鹰气田的油井还将生产天然气。”

ABOUT PETROSUN, INC.
PetroSun, Inc. owns and operates significant projects in helium production and lithium mining, in addition to owning and licensing patented technologies applicable to mineral extraction, water purification, electric bicycle-based vehicles and agriculture. The Company holds mineral leases that are prospective for helium on over 280,000 gross acres in the Holbrook Basin of Arizona and the Paradox Basin of Utah. The Company is also acquiring six contiguous mining concessions in northern Mexico that are prospective for lithium and other rare metals suspended in zeolite clays. The Company trades on the OTC Pink Sheets under the symbol "PSUD".

关于PetroSun公司
除了拥有和许可适用于矿物开采、净水、电动自行车车辆和农业的专利技术外,PetroSun公司还拥有和运营氦生产和锂开采方面的重要项目。该公司在亚利桑那州的霍尔布鲁克盆地和犹他州的Paradox盆地持有有望开采氦的矿产租约,总面积超过28万英亩。该公司还在墨西哥北部收购六个相邻的采矿特许权,这些特许权有望开采悬浮在沸石粘土中的锂和其他稀有金属。该公司在场外粉单交易,交易代码为“PSUD”。

Forward-Looking Statements Disclaimer:

前瞻性声明免责声明:

This press release contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Act of 1934, as amended. In some cases, you can identify forward-looking statements by the following words: "anticipate", "believe", "continue", "could", "estimate", "expect", "intend", "may", "ongoing", "plan", "potential", "predict", "project", "should", "will", "would", or the negative of these terms or other comparable terminology, although not all forward-looking statements contain these words. Forward-looking statements are not a guarantee of future performance or results and will not necessarily be accurate indications of the times at, or by, which such performance or results will be achieved. Forward-looking statements are based on information available at the time the statements are made and involve known and unknown risks, uncertainty and other factors that may cause our results, levels of activity, performance or achievements to be materially different from the information expressed or implied by the forward-looking statements in this press release. This press release should be considered in light of all filings of the Company that are disclosed on the OTCMarket.com website.

本新闻稿包含符合1933年“证券法”第27A条(经修订)和“1934年证券法”(经修订)第21E条规定的前瞻性陈述。在某些情况下,您可以通过以下词语来识别前瞻性表述:“预期”、“相信”、“继续”、“可能”、“估计”、“预期”、“打算”、“可能”、“正在进行”、“计划”、“潜在”、“预测”、“项目”、“应该”、“将”、“将”或这些术语或其他类似术语的否定词,尽管并不是所有的前瞻性表述都包含这些词语。前瞻性陈述不是对未来业绩或结果的保证,也不一定是对实现这些业绩或结果的时间或时间的准确指示。前瞻性陈述以发表陈述时可获得的信息为基础,涉及已知和未知的风险、不确定性和其他因素,这些风险、不确定性和其他因素可能导致我们的结果、活动水平、业绩或成就与本新闻稿中的前瞻性陈述明示或暗示的信息大不相同。本新闻稿应考虑到OTCMarket.com网站上披露的该公司的所有文件。

Contact:
PetroSun, Inc.
2999 North 44th Street, Suite 620
Phoenix, Arizona 85018
480-425-4290
Website:

联系方式:
太阳石油公司(PetroSun,Inc.)
北第44街2999号,620套房
亚利桑那州凤凰城85018
480-425-4290
网站:

SOURCE: PetroSun, Inc.

资料来源:太阳石油公司(PetroSun,Inc.)


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发