share_log

Blue Lagoon Hits 14.8 g/t AU and 38.3 g/t AG over 7.3m In Newly Discovered Chance Zone

Blue Lagoon Hits 14.8 g/t AU and 38.3 g/t AG over 7.3m In Newly Discovered Chance Zone

蓝泻湖在新发现的机遇区超过7.3米,AU和AG分别达到14.8g/t和38.3g/t
Accesswire ·  2022/02/07 07:30

VANCOUVER, BC / ACCESSWIRE / February 7, 2022 / Blue Lagoon Resources Inc. (the "Company") (CSE:BLLG)(FSE:7BL)(OTCQB:BLAGF) is pleased to announce that recent drilling has encountered new, high-grade vein intercepts at the Company's 100% owned, year-round accessible, Dome Mountain Gold Project located a short 50-minute drive from Smithers, B.C.

温哥华,BC/ACCESSWIRE/2022年2月7日/蓝泻湖资源公司(“公司)(CSE:BLG)(多伦多证券交易所股票代码:7BL)(场外交易市场代码:BLAGF)很高兴地宣布,最近的钻探在距离不列颠哥伦比亚省史密瑟斯短短50分钟车程的公司全资拥有、全年可达的穹顶山金矿项目遇到了新的高品位矿脉截获。

Hole DM-21-224 was drilled from the most southern pad in the newly discovered Chance Structural Corridor (see news release Dec 7, 2021) and drilled at an Azimuth of 167 Degrees. The target here was the continuation of mineralization seen in the corridor where the structural trend intersected the proposed eastern continuation of the Boulder Vein. The hole encountered a new, high-grade vein running 14.8 g/t Au and 38.3 g/t Ag over 7.3m. A second high-grade vein running 26.9 g/t Au and +100.0 g/t* Ag over 1.04 meters was encountered further down hole.

DM-21-224孔是从新发现的Chance构造走廊(见2021年12月7日的新闻稿)的最南端垫上钻成的,方位角为167度。这里的目标是在走廊中看到的矿化继续存在,在那里,构造趋势与拟议的博尔德矿脉东部延续相交。该井遇到了一个新的高品位矿脉,矿脉的Au含量为14.8g/t,Ag含量为38.3g/t,超过7.3米。第二个高品位矿脉的Au含量为26.9g/t,Ag含量为+100.0 g/t*,超过1.04m。

Table 1 DM-21-224

表1DM-21-224

Hole ID

From (m)

To (m)

Interval (m)

Au g/t

Ag g/t

DM-21-244

186.92

187.63

0.71

7.46

10

DM-21-244

247

247.8

0.8

6.89

25

DM-21-244

381.2

388.51

7.31

14.8

38.3

including

381.2

381.6

0.4

47.3

87

including

383

384.1

1.1

62.6

+100.00*

including

387.93

388.51

0.58

31.5

58

DM-21-244

443.52

444.56

1.04

26.9

+100.00*

孔ID

发件人(M)

至(M)

间隔(M)

Au g/t

AG g/t

DM-21-244

186.92

187.63

0.71

7.46

10

DM-21-244

247

247.8

0.8

6.89

25

DM-21-244

381.2

388.51

7.31

14.8

38.3

包括

381.2

381.6

0.4

47.3

87

包括

383

384.1

1.1

62.6

+100.00*

包括

387.93

388.51

0.58

31.5

58

DM-21-244

443.52

444.56

1.04

26.9

+100.00*

*Ag over 100ppm detection limit will be re-run with silver assay

*超过100ppm检测限的Ag将用银化验重新运行

"We knew we were in a good zone in the Chance Structural Corridor which has shown us multiple mineralized intercepts in previous holes" said William Cronk, Chief Geologist for Blue Lagoon Resources. "We systematically worked our way south and then drilled south-southeast into the proposed eastern extension of the Boulder Vein in anticipation of mineralization at the intersection of two strong lineaments; the Chance Structural Zone and the eastern extension of the Boulder Vein. Previously reported intercepts were high grade in this area and the expectation is that we will be able to follow this intercept with near term holes which will test for further high-grade mineralization at depth and along strike," he added.

蓝色泻湖资源公司的首席地质学家威廉·克朗克(William Cronk)说:“我们知道我们处在机会构造走廊(Chance Structure Corridor)的一个很好的区域,这向我们展示了在之前的洞穴中发现了多个矿化截获点。”他补充说:“我们系统地向南工作,然后向东南方向钻探到拟议中的Boulder矿脉东部延伸段,预计在两个强大的线形构造-Chance构造区和Boulder脉东部延伸的交汇处有矿化。之前报道的截获段在这一地区的品位很高,预计我们将能够在近期通过钻孔测试深度和走向上进一步的高品位矿化,”他补充道。

Drilling is now being conducted from the same pad as that for DM-21-224 for east-west mineralization north of the pad. Once completed, the drill rig will move approximately 100m south and focus on this high-grade intercept.

目前正在从与DM-21-224相同的地块进行钻探,以便在地块以北进行东西走向的矿化。一旦完成,钻机将向南移动约100米,并将重点放在这一高级拦截上。

Assay results for 28 holes remain outstanding.

28个洞的化验结果仍然很突出。

QUALITY ASSURANCE AND CONTROL

质量保证和控制

All core analyses in DM-21-224 were completed by Act Labs out of Kamloops B,C. Canada. Core selected for sampling was cut with a core saw in half with one half bagged for shipping. Strict chain of custody storing, and shipping protocol were maintained. Core was crushed, split, and pulverized with 250 grams passing 140 mesh (RX1). Each sample was analyzed by IF2 4-acid digestion ICP with ES finish 1A2-ICP fire assay (30g) with ICP-MS finish, and all Au overlimits >30ppm were analyzed with 1A3 fire assay and gravimetric finish. Standards and Blanks were inserted by Company staff. The sampling program was undertaken by Company personnel by and under the direction of Lorie Farrell PGEO..

DM-21-224中的所有核心分析都是由加拿大坎卢普斯B的Act Labs完成的。选择取样的岩芯用岩心锯切成两半,一半装袋装船。严格的保管链、储存链和运输协议都得到了维护。芯子被粉碎、劈开和粉碎,250克通过140目(RX1)。样品经IF24酸消解后,用ES Finish 1A2-ICP火试剂法(30g)和ICP-MS光洁剂进行分析,Au超标量>30ppm用1A3火试剂法和重量法分析。标准和空白是由公司员工插入的。抽样计划由公司人员在Lorie Farrell PGeo的指导下进行。

The scientific and technical data contained in this news release was approved by William Cronk, P.Geo., a qualified person as defined in NI 43-101 and a consultant to the Company.

本新闻稿中包含的科学和技术数据得到了William Cronk,P.Geo,NI 43-101中定义的合格人员和公司顾问的批准。

For further information, please contact:

如需更多信息,请联系:

Rana Vig
President and Chief Executive Officer
Telephone: 604-218-4766
Email: rana@ranavig.com

拉娜·维格(Rana Vig)
总裁兼首席执行官
电话:604-218-4766
电子邮件:raa@ranavig.com

The CSE has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. Statement Regarding Forward-Looking Information: This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that Blue Lagoon Resources Inc. (the "Company") expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include results of exploration activities may not show quality and quantity necessary for further exploration and exploitation of minerals deposits, market prices, and continued availability of capital and financing, permitting and other approvals, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

CSE未对本新闻稿的充分性或准确性进行审查,也不承担任何责任。关于前瞻性信息的陈述:本新闻稿包括某些可被视为“前瞻性陈述”的陈述。本新闻稿中除有关历史事实的陈述外,涉及Blue Lagoon Resources Inc.(“本公司”)预期将发生的事件或发展的所有陈述均为前瞻性陈述。前瞻性表述是指不是历史事实的表述,一般但不总是由“预期”、“计划”、“预期”、“相信”、“打算”、“估计”、“项目”、“潜在”和类似表述来识别,或者事件或条件“将”、“将”、“可能”、“可能”或“应该”发生。尽管公司认为这些前瞻性陈述中表达的预期是基于合理的假设,但这些陈述并不能保证未来的业绩,实际结果可能与前瞻性陈述中的结果大不相同。可能导致实际结果与前瞻性陈述中的结果大不相同的因素包括:勘探活动的结果可能没有显示进一步勘探和开采矿藏所需的质量和数量、市场价格、资本和融资的持续可获得性、许可和其他批准,以及一般的经济、市场或商业条件。请投资者注意,任何此类陈述都不能保证未来的业绩,实际结果或发展可能与前瞻性陈述中预测的大不相同。前瞻性陈述是基于公司管理层在陈述发表之日的信念、估计和意见。除适用的证券法另有规定外, 如果管理层的信念、估计或意见或其他因素发生变化,公司没有义务更新这些前瞻性陈述。

SOURCE: Blue Lagoon Resources Inc.

资料来源:蓝色泻湖资源公司。


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发