share_log

Talisker Announces More High Grade Results from Bralorne West Focused Around the 55 Vein

Talisker Announces More High Grade Results from Bralorne West Focused Around the 55 Vein

Talisker宣布Bralorne West专注于55号静脉的更多高级结果
Accesswire ·  2022/02/01 07:06

TORONTO, ON / ACCESSWIRE / February 1, 2022 / Talisker Resources Ltd. ("Talisker" or the "Company") (TSX:TSK)(OTCQX:TSKFF) is pleased to announce high-grade results from multiple drill holes highlighted by 43.48 g/t Au over 1.30 metres (SB-2021-096) and 12.72 g/t Au over 1.50 metres within 8.43 g/t Au over 3.25 metres (SB-2021-096) on the 55 and 228 veins respectively at its 100% owned flagship Bralorne Gold Project.

多伦多,于/ACCESSWIRE/2022年2月1日/泰瑞克资源有限公司(“塔里斯克“或”公司") (TSX:TSK)(OTCQX:TSKFF)很高兴地宣布了来自多个钻孔的高等级结果,这些钻孔的重点是超过1.30米的Au 43.48克/吨(SB-2021-096)和12.72克/吨Au超过1.50米以内8.43克/吨Au超过3.25米(SB-2021-096)在其100%拥有的旗舰Bralorne金矿项目的55个和228个矿脉上分别使用(SB-2021-096)。

Key Points:

要点:

  • The drill holes disclosed in this release are located within the Bralorne West block and are focused on the 55 HW and 55 veins.
  • Resource drilling completed on the 55 and 55HW veins now totals 48 holes.
  • Hole SB-2021-096 and SB-2021-098 both intersected high-grade gold on the 55 vein highlighted by 43.48 g/t Au over 1.30 metres and 8.64 g/t Au over 1.00 metre, respectively.
  • Hole SB-2021-096 also intercepted the 228 vein close to the surface which graded 12.72 g/t Au over 1.50 metres with a broader mineralized envelope of 8.43 g/t Au over 3.25 metres.
  • SB-2021-098 intersected the 225 vein highlighted by 13.02 g/t Au over 1.00 metre and a new vein which graded 5.65 g/t over 1.00 metre.
  • 本新闻稿中披露的钻孔位于Bralorne West区块内,集中在55个HW和55个矿脉上。
  • 在55和55HW矿脉上完成的资源钻探现在总共有48个孔。
  • SB-2021-096和SB-2021-098孔都与55号矿脉的高品位金相交超过1.30米的Au 43.48克/吨1.00m以上分别为8.64g/t Au和8.64g/t Au。
  • SB-2021-096孔还截获了靠近地表的228条矿脉。12.72克/吨Au超过1.50米矿化包络范围更广,超过3.25米,矿化包裹体为8.43g/t Au。
  • SB-2021-098与突出显示的225条矿脉相交超过1.00米的Au 13.02克/吨新矿脉1.00m以上,品位5.65g/t。

Terry Harbort, CEO of Talisker commented, "With 48 drill holes now intercepting the 55 and 55HW veins, Talisker anticipates that these two structures will form a major component of our upcoming 2022 resource. With a large volume of assays recently received from the laboratory, we expect a steady newsflow of results as we complete the quality control process and release the results to market."

Talisker首席执行官特里·哈博特(Terry Harbort)评论说:“现在有48个钻孔截取了55和55HW的矿脉,Talisker预计这两个结构将构成我们即将到来的2022年资源的主要组成部分。随着最近从实验室收到大量的分析结果,我们预计随着我们完成质量控制过程并将结果发布到市场上,结果将会稳定的新闻流。”

Seven diamond drills are now operating at the Bralorne Gold Project. A total of 109,207 metres (212 holes) has been drilled since Talisker initiated drilling at the Project in February 2020. Currently there are 1,434 samples at the assay laboratory which are expected to be received by the Company shortly.

Bralorne金矿项目目前有7个钻石钻机在作业。自2020年2月Talisker开始在该项目钻探以来,总共钻了109,207米(212个洞)。目前,化验实验室有1,434个样本,预计公司很快就会收到。

SB-2021-096 Hole Description

SB-2021-096孔说明

  • Located in the Bralorne West block and hosted in dioritic intrusive
  • 228 vein intersected from 67.00 to 70.25 m
  • 55 HW splay intersected from 278.00 to 280.45 m
  • 55 HW vein intersected from 287.45 to 288.65 m with visible gold
  • 55 splayintersected from 307.70 to 309.00 m with visible gold
  • 55 vein intersected from 323.1 to 328.60 m with visible gold
  • 位于布拉洛恩西部地块,赋存于闪长岩侵入岩中
  • 228条静脉从67.00米到70.25米相交
  • 55 HW展宽相交,从278.00米到280.45米
  • 55 HW矿脉相交于287.45米至288.65米之间,呈可见的金色
  • 55个横幅从307.70米到309.00米,可见金色
  • 55条矿脉从323.1米到328.60米相交,带有可见的金色

SB-2021-098 Hole Description

SB-2021-098孔说明

  • Located in the Bralorne West block and hosted in dioritic intrusive
  • New vein intersected from 173.50 to 174.50 m
  • 225 vein intersected from 263.10 to 264.10 m
  • 101 vein intersected from 373.12 to 374.28 m
  • 55 splay intersected from 424.00 to 425.00 m
  • 55 vein intersected from 434.00 to 435.00 m
  • 位于布拉洛恩西部地块,赋存于闪长岩侵入岩中
  • 新静脉相交距离从173.50米到174.50米
  • 225m的交叉点在263.10米到264.10米之间
  • 静脉相交距离从373.12米到374.28米
  • 55个范围从424.00米到425.00米相交
  • 55条静脉相交距离从434.00米到435.00米

Complete results have been received for all reported holes. All major vein structures intersected and reported in this release are considered to be classic Bralorne crack-seal quartz-carbonate veins. The veins display densely banded sulphide septae, hosting fine-grained arsenopyrite and pyrite mineralization with strong silica-sericite alteration halos. All reported drill assay results are available on the Company's website at the following link:

已收到所有报告的孔的完整结果。本新闻稿中报道的所有相交的主要脉体构造均被认为是典型的Bralorne裂缝封闭型石英-碳酸盐脉体。脉体呈致密条带状硫化物隔层,赋存细粒毒砂和黄铁矿矿化,具有较强的硅绢云母蚀变晕。所有报告的钻探化验结果均可在公司网站上查阅,链接如下:

Table 1: Bralorne Gold Project - Drill Holes SB-2021-096 and 098

Diamond Drill Hole Name

From

(m)

To

(m)

Interval

(m)

Au

(g/t)

Zone

Method Reported

SB-2021-096

66

67

1

0.88

228 Vein

Au-AA26
SB-2021-096

67

67.5

0.5

2.82

Au-AA26
SB-2021-096

67.5

68.5

1

9.73

Au-AA26
SB-2021-096

68.5

69

0.5

18.70

Au-AA26
SB-2021-096

69

70.25

1.25

5.52

Au-AA26
SB-2021-096

70.25

71

0.75

0.34

Au-AA26
SB-2021-096

71

72

1

0.21

Au-AA26
SB-2021-096

278

279

1

8.10

55HW Splay

Au-AA26
SB-2021-096

279

280.45

1.45

0.96

Au-AA26
SB-2021-096

287.45

288.1

0.65

0.59

55HW Vein

Au-AA26
SB-2021-096

288.1

288.65

0.55

11.25

Au-AA26
SB-2021-096

288.65

289.5

0.85

0.47

Au-AA26
SB-2021-096

307.7

308.5

0.8

10.10

55 Vein

Au-AA26
SB-2021-096

308.5

309

0.5

96.90

Au-AA26
SB-2021-096

309

309.5

0.5

0.03

Au-AA26
SB-2021-096

309.5

310.05

0.55

0.07

Au-AA26
SB-2021-096

310.05

311.5

1.45

1.27

Au-AA26
SB-2021-096

323.1

323.6

0.5

13.30

55 Splay Vein

Au-AA26
SB-2021-096

323.6

325

1.4

0.05

Au-AA26
SB-2021-096

325

326

1

0.02

Au-AA26
SB-2021-096

326

327.1

1.1

0.16

Au-AA26
SB-2021-096

327.1

327.6

0.5

0.86

Au-AA26
SB-2021-096

327.6

328.1

0.5

4.37

Au-AA26
SB-2021-096

328.1

328.6

0.5

4.75

Au-AA26
SB-2021-096

328.6

329.4

0.8

0.47

Au-AA26
SB-2021-096

329.4

330.5

1.1

0.25

Au-AA26
SB-2021-098

173.5

174

0.5

9.04

New Vein

Au-AA26
SB-2021-098

174

174.5

0.5

2.26

Au-AA26
SB-2021-098

260.9

261.9

1

0.58

225 Vein

Au-AA26
SB-2021-098

261.9

262.4

0.5

1.51

Au-AA26
SB-2021-098

262.4

263.1

0.7

0.02

Au-AA26
SB-2021-098

263.1

263.6

0.5

23.60

Au-AA26
SB-2021-098

263.6

264.1

0.5

2.44

Au-AA26
SB-2021-098

264.1

264.6

0.5

0.13

Au-AA26
SB-2021-098

264.6

265.6

1

0.20

Au-AA26
SB-2021-098

265.6

266.9

1.3

0.37

Au-AA26
SB-2021-098

373.12

373.74

0.62

4.89

101 Vein

Au-AA26
SB-2021-098

373.74

374.28

0.54

0.84

Au-AA26
SB-2021-098

374.28

374.8

0.52

0.61

Au-AA26
SB-2021-098

424

424.5

0.5

7.59

55 Splay Vein

Au-AA26
SB-2021-098

424.5

425

0.5

0.80

Au-AA26
SB-2021-098

434

434.5

0.5

11.40

55 Vein

Au-AA26
SB-2021-098

434.5

435

0.5

5.87

Au-AA26
SB-2021-098

435

435.5

0.5

0.02

Au-AA26
SB-2021-098

435.5

436

0.5

0.54

Au-AA26
SB-2021-098

436

436.5

0.5

2.72

Au-AA26

Notes: Diamond drill hole SB-2021-096 has collar orientation of Azimuth 203; Dip -45. Diamond drill hole SB-2021-098 has a collar orientation of Azimuth 189; Dip -45. True widths are estimated at 40 - 90% of intercept lengths and are based on oriented core measurements where available. Method Reported includes the most up-to-date information as of the date of this press release.

表1:Bralorne金矿项目-SB-2021-096和098号钻孔

金刚石钻孔名称

从…

(m)

(m)

间隔

(m)

Au

(克/吨)

分带

报告的方法

SB-2021-096

66

67

1

0.88

228条静脉

Au-AA26
SB-2021-096

67

67.5

0.5

2.82

Au-AA26
SB-2021-096

67.5

68.5

1

9.73

Au-AA26
SB-2021-096

68.5

69

0.5

18.70

Au-AA26
SB-2021-096

69

70.25

1.25

5.52

Au-AA26
SB-2021-096

70.25

71

0.75

0.34

Au-AA26
SB-2021-096

71

72

1

0.21

Au-AA26
SB-2021-096

278

279

1

8.10

55HW展开

Au-AA26
SB-2021-096

279

280.45

1.45

0.96

Au-AA26
SB-2021-096

287.45

288.1

0.65

0.59

55HW矿脉

Au-AA26
SB-2021-096

288.1

288.65

0.55

11.25

Au-AA26
SB-2021-096

288.65

289.5

0.85

0.47

Au-AA26
SB-2021-096

307.7

308.5

0.8

10.10

55条静脉

Au-AA26
SB-2021-096

308.5

309

0.5

96.90

Au-AA26
SB-2021-096

309

309.5

0.5

0.03

Au-AA26
SB-2021-096

309.5

310.05

0.55

0.07

Au-AA26
SB-2021-096

310.05

311.5

1.45

1.27

Au-AA26
SB-2021-096

323.1

323.6

0.5

13.30

55条张开静脉

Au-AA26
SB-2021-096

323.6

325

1.4

0.05

Au-AA26
SB-2021-096

325

326

1

0.02

Au-AA26
SB-2021-096

326

327.1

1.1

0.16

Au-AA26
SB-2021-096

327.1

327.6

0.5

0.86

Au-AA26
SB-2021-096

327.6

328.1

0.5

4.37

Au-AA26
SB-2021-096

328.1

328.6

0.5

4.75

Au-AA26
SB-2021-096

328.6

329.4

0.8

0.47

Au-AA26
SB-2021-096

329.4

330.5

1.1

0.25

Au-AA26
SB-2021-098

173.5

174

0.5

9.04

新脉络

Au-AA26
SB-2021-098

174

174.5

0.5

2.26

Au-AA26
SB-2021-098

260.9

261.9

1

0.58

225条静脉

Au-AA26
SB-2021-098

261.9

262.4

0.5

1.51

Au-AA26
SB-2021-098

262.4

263.1

0.7

0.02

Au-AA26
SB-2021-098

263.1

263.6

0.5

23.60

Au-AA26
SB-2021-098

263.6

264.1

0.5

2.44

Au-AA26
SB-2021-098

264.1

264.6

0.5

0.13

Au-AA26
SB-2021-098

264.6

265.6

1

0.20

Au-AA26
SB-2021-098

265.6

266.9

1.3

0.37

Au-AA26
SB-2021-098

373.12

373.74

0.62

4.89

101条静脉

Au-AA26
SB-2021-098

373.74

374.28

0.54

0.84

Au-AA26
SB-2021-098

374.28

374.8

0.52

0.61

Au-AA26
SB-2021-098

424

424.5

0.5

7.59

55条张开静脉

Au-AA26
SB-2021-098

424.5

425

0.5

0.80

Au-AA26
SB-2021-098

434

434.5

0.5

11.40

55条静脉

Au-AA26
SB-2021-098

434.5

435

0.5

5.87

Au-AA26
SB-2021-098

435

435.5

0.5

0.02

Au-AA26
SB-2021-098

435.5

436

0.5

0.54

Au-AA26
SB-2021-098

436

436.5

0.5

2.72

Au-AA26

注:钻石钻孔SB-2021-096的卡箍方位为203°;Dip-45°。SB-2021-098金刚石钻孔的钻具方位为189°;倾角为45°。真实宽度估计为截距长度的40%-90%,并基于可用的定向岩心测量。报告的方法包括截至本新闻稿发布日期的最新信息。

Qualified Person

合格人员

The technical information contained in this news release relating to the drill results at the Bralorne Gold Project has been approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker's Vice President, Exploration and Resource Development, who is a "qualified person" within the meaning of National Instrument 43-101, Standards of Disclosure for Mineral Projects.

本新闻稿中包含的有关Bralorne金矿钻探结果的技术信息已获得Talisker负责勘探和资源开发的副总裁Leonardo de Souza(BSC,澳大利亚矿业管理委员会(CP)会员224827)的批准,他是National Instrument 43-101“矿物项目披露标准”所指的“合格人士”。

About Talisker Resources Ltd.

关于Talisker Resources Ltd.

Talisker (taliskerresources.com) is a junior resource company involved in the exploration of gold projects in British Columbia, Canada. Talisker's projects include two advanced-stage projects, the Bralorne Gold Complex and the Ladner Gold Project, both advanced-stage projects with significant exploration potential from historical high-grade producing gold mines, as well as its Spences Bridge Project where the Company holds ~85% of the emerging Spences Bridge Gold Belt and several other early-stage Greenfields projects. With its properties comprising 296,983 hectares over 346 claims, three leases and 198 crown grant claims, Talisker is a dominant exploration player in south-central British Columbia. The Company is well funded to advance its aggressive systematic exploration program at its projects.

Talisker(taliskerresource ces.com)是一家初级资源公司,在加拿大不列颠哥伦比亚省从事金矿项目的勘探。Talisker的项目包括两个高级项目,即Bralorne Gold Complex和Ladner Gold Project,这两个项目都是从历史上生产的高品位金矿中获得巨大勘探潜力的高级项目,以及Spence Bridge项目,该公司持有Emerging Spence Bridge金矿带约85%的股份,以及其他几个早期绿地项目。Talisker的物业面积296983公顷,涉及346项索赔、3份租约和198项皇冠拨款索赔,是不列颠哥伦比亚省中南部的主要勘探公司。该公司有充足的资金来推进其项目中积极的系统勘探计划。

For further information, please contact:

如需更多信息,请联系:

Terry Harbort
President and CEO
Terry.harbort@taliskerresources.com
+1 416 361 2808

特里·哈博特
总裁兼首席执行官
邮箱:terry.harbort@taliskerresource ces.com
+1 416 361 2808

Sample Preparation and QAQC

样品制备与QAQC

Drill core at the Bralorne Gold Project is drilled in HQ to NQ size ranges (63.5mm and 47.6mm respectively). Drill core samples are minimum 50 cm and maximum 160 cm long along the core axis. Samples are focused on an interval of interest such as a vein or zone of mineralization. Shoulder samples bracket the interval of interest such that a total sampled core length of not less than 3m both above and below the interval of interest must be assigned. Sample QAQC measures of unmarked certified reference materials (CRMs), blanks, and duplicates are inserted into the sample sequence and make up 9% of the samples submitted to the lab for holes reported in this release. Sample preparation and analyses is carried out by ALS Global in North Vancouver, British Columbia, Canada and SGS Canada in Burnaby, British Columbia, Canada. Drill core sample preparation includes drying in an oven at a maximum temperature of 60°C, fine crushing of the sample to at least 70% passing less than 2 mm, sample splitting using a riffle splitter, and pulverizing a 250 g split to at least 85% passing 75 microns (ALS code PREP-31 / SGS code PRP89). Gold in diamond drill core is analysed by fire assay and atomic absorption spectroscopy (AAS) of a 50g sample (ALS code Au-AA26 / SGS code GO_FAA50V10), while multi-element chemistry is analysed by 4- Acid digestion of a 0.25 g sample split with detection by inductively coupled plasma mass spectrometer (ICP-MS) for 48 elements (Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In, K, La, Li, Mg, Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr, Ta, Te, Th, Ti, Tl, U, V, W, Y, Zn, Zr). Gold assay technique (ALS code Au-AA26 / SGS code FAA50V10) has an upper detection limit of 100 ppm. Any sample that produces an over-limit gold value via the gold assay technique is sent for gravimetric finish (ALS method Au-GRA22 / SGS method GO_FAG50V) which has an upper detection limit of 1,000 ppm Au. Samples where visible gold was observed are sent directly to screen metallics analysis and all samples that fire assay above 1 ppm Au are re-analysed with method (ALS code Au-SCR24 / SGS code - 6 - GO_FAS50M) which employs a 1kg pulp screened to 100 microns with assay of the entire oversize fraction and duplicate 50g assays on the undersize fraction. Where possible all samples initially sent to screen metallics processing will also be re-run through the fire assay with gravimetric finish provided there is enough material left for further processing

Bralorne金矿项目的钻芯钻进的尺寸范围从HQ到NQ(分别为63.5 mm和47.6 mm)。钻芯样品沿岩心轴线最小为50厘米,最长为160厘米。样品集中在感兴趣的区间,如矿脉或矿化带。肩部样本包括感兴趣的区间,因此必须指定感兴趣的区间上下的总取样岩心长度均不小于3m。未标记的认证标准物质(CRM)、空白和复制品的样品QAQC测量被插入到样品序列中,并占本新闻稿中报告的孔洞提交给实验室的样品的9%。样品准备和分析由加拿大不列颠哥伦比亚省北温哥华的ALS Global和加拿大不列颠哥伦比亚省本纳比的SGS Canada进行。钻芯样品制备包括在最高温度为60°C的烤箱中烘干,将样品粉碎至至少70%(小于2 mm),使用刮刀分割器将样品分割,并将250克裂解样品粉碎到至少85%(ALS代码PREP-31/SGS代码PRP89)(ALS代码PREP-31/SGS代码PRP89)。用火试法和原子吸收光谱法(AAS)对50g样品(ALS代码Au-Aa26/SGS代码GO_FAA50V10)中的金进行分析,同时对0.25g样品进行4酸消解,用电感耦合等离子体质谱(ICP-MS)检测48种元素(Ag,Al,As,Ba,Be,Bi,Ca,Cd,Ce,Co,Cr,Cs,Cu,Fe,Ga,Ge,Hf,In,K,Ce,Co,Cr,Cs,Cu,Fe,Ga,Ge,Hf,In,K,Ce,Co,Cr,Cs,Cu,Fe,Ga,Ge,Hf,In,K,...Li、Mg、Mn、Mo、Na、Nb、Ni、P、Pb、Rb、Re、S、Sb、Sc、Se、Sn、Sr、Ta、Te、Th、Ti、Tl、U、V、W、Y、Zn、Zr)。金检测技术(ALS代码au-aa26/SGS代码FAA50V10)的检测上限为100ppm。任何通过金分析技术产生超限金值的样品都将被送去进行重量分析(ALS方法Au-GRA22/SGS方法GO_FAG50V),其检测下限上限为1, 1000ppm Au。观察到可见金的样品被直接送到金属分析筛查,所有火试金值高于1ppm的样品都用方法(ALS代码Au-SCR24/SGS代码-6-GO_FAS50M)重新分析,该方法使用1公斤纸浆筛分至100微米,对整个过大组分进行分析,对较小组分重复50g测试。在可能的情况下,所有最初送往筛分金属加工的样品,只要有足够的材料可供进一步加工,也将用重量分析方法重新进行火试。

Caution Regarding Forward-Looking Information

关于前瞻性信息的警告

Certain statements contained in this press release constitute forward-looking information. These statements relate to future events or future performance. The use of any of the words "could", "intend", "expect", "believe", "will", "projected", "estimated" and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on Talisker's current belief or assumptions as to the outcome and timing of such future events. Actual future results may differ materially. In particular, this release contains forward-looking information relating to, among other things, effective time of the rights provided to New Gold under the Investor Rights Agreement, the completion of New Gold's strategic investment; the completion of the Offering, the use of proceeds, the operations of the Company and the timing which could be affected by the current global COVID-19 pandemic. Those assumptions and factors are based on information currently available to Talisker. Although such statements are based on reasonable assumptions of Talisker's management, there can be no assurance that any conclusions or forecasts will prove to be accurate.

本新闻稿中包含的某些陈述属于前瞻性信息。这些陈述与未来事件或未来表现有关。使用“可能”、“打算”、“预期”、“相信”、“将会”、“预计”、“估计”以及与非历史事实有关的类似表述和陈述,旨在识别前瞻性信息,并基于Talisker对此类未来事件的结果和时间的当前信念或假设。未来的实际结果可能会大不相同。特别是,本新闻稿包含与根据投资者权利协议向New Gold提供的权利的生效时间、New Gold的战略投资完成、发售完成、收益的使用、公司的运营以及可能受到当前全球新冠肺炎疫情影响的时间有关的前瞻性信息。这些假设和因素是基于Talisker目前掌握的信息。尽管这样的陈述是基于对Talisker管理层的合理假设,但不能保证任何结论或预测将被证明是准确的。

While Talisker considers these statements to be reasonable based on information currently available, they may prove to be incorrect. Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include market risks and the demand for securities of the Company, risks inherent in the exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined, risks relating to variations in grade or recovery rates, risks relating to changes in mineral prices and the worldwide demand for and supply of minerals, risks related to increased competition and current global financial conditions and the COVID-19 pandemic, access and supply risks, reliance on key personnel, operational risks, and regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks.

虽然Talisker认为根据目前获得的信息,这些说法是合理的,但它们可能被证明是不正确的。前瞻性信息涉及已知和未知的风险、不确定性和其他因素,这些风险、不确定性和其他因素可能导致实际结果、业绩或成就与前瞻性信息明示或暗示的任何未来结果、业绩或成就大不相同。这些因素包括市场风险和对公司证券的需求;矿藏勘探和开发过程中固有的风险,包括随着计划的不断调整而改变项目参数的风险;与品位或回收率变化有关的风险;与矿价变化和全球矿产供需变化有关的风险;与竞争加剧和当前全球金融状况以及新冠肺炎大流行有关的风险;准入和供应风险;对关键人员的依赖;运营风险;以及监管风险,包括与获得必要的许可证和许可证有关的风险、融资、资本化和流动性风险

The forward-looking information contained in this news release is made as of the date hereof, and Talisker is not obligated to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable securities laws. Because of the risks, uncertainties and assumptions contained herein, investors should not place undue reliance on forward-looking information. The foregoing statements expressly qualify any forward-looking information contained herein.

本新闻稿中包含的前瞻性信息是截至本文发布之日的,Talisker没有义务因新信息、未来事件或其他原因而更新或修改任何前瞻性信息,除非适用的证券法要求这样做。由于本文包含的风险、不确定性和假设,投资者不应过度依赖前瞻性信息。前述陈述明确限定了本文中包含的任何前瞻性信息。

Figure 1: SB-2021-096 hole location within the Bralorne West block.

图1:Bralorne West区块内的SB-2021-096孔位置。

Figure 2: SB-2021-098 hole location within the Bralorne West block.

图2:Bralorne West区块内的SB-2021-098孔位置

Figure 3: SB-2021-096 and 098 cross section with vein intersections and grade.

图3:带静脉交叉点和坡度的SB-2021-096和098横截面。

SOURCE: Talisker Resources Ltd.

资料来源:泰利斯克资源有限公司


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发