share_log

Talisker Intercepts High Grade Gold on the 52 Vein Across 660 Metres of Strike Length

Talisker Intercepts High Grade Gold on the 52 Vein Across 660 Metres of Strike Length

Talisker在52号矿脉上截获660米走向长度的高品位黄金
Accesswire ·  2022/01/25 07:06

TORONTO, ON / ACCESSWIRE / January 25, 2022 / Talisker Resources Ltd. ("Talisker" or the "Company") (TSX:TSK)(OTCQX:TSKFF) is pleased to announce high-grade results from multiple drill holes highlighted by 55.25 g/t Au over 1.3 metres (SB-2021-090) and 23.58 g/t Au over 1.80 metres within 5.26 g/t Au over 8.90 metres (SB-2021-087) on the 52 Vein at its 100% owned flagship Bralorne Gold Project.

多伦多,ON/ACCESSWIRE/2022年1月25日/Talisker Resources Ltd.(“塔里斯克“或”公司") (多伦多证券交易所:TSK)(OTCQX:TSKFF)很高兴地宣布了来自多个钻孔的高等级结果,这些钻孔的重点是1.3米以上55.25克/吨Au(SB-2021-090)和23.58克/吨Au超过1.80米以内5.26克/吨Au超过8.90米(SB-2021-087)在其100%拥有的旗舰Bralorne Gold Project的52号静脉上。

Key Points:

要点:

  • The drill holes in this release are located within the Bralorne East Complex.
  • All three drill holes in this release intersected the 52 vein over a 660-metre strike length.
  • Hole SB-2021-090 intersected the 52 vein highlighted by 55.25 g/t Au over 1.30 metres and the J vein which intersected 10.10 g/t Au over 0.55 metres.
  • SB-2021-087 intersected the 52 vein highlighted by 23.85 g/t Au over 1.80 metres within 5.26 g/t Au over 8.90 metres.
  • Hole SB-2021-085 intersected the 52 vein highlighted by 14.13 g/t Au over 2.50 metres and a New vein highlighted by 7.59 g/t Au over 1.45 metres.
  • The previous drilling on the 52 vein returned high-grade assays highlighted by hole SB-2021-069 which returned 10.09 g/t Au over 4.35 metres and SB-2021-030 which returned 19.95g/t Au over 1.00 metres.
  • 本新闻稿中的钻孔位于Bralorne East综合体内。
  • 这份新闻稿中的所有三个钻孔都与52号矿脉相交,走向长度为660米。
  • SB-2021-090孔与突出显示的52号矿脉相交1.30米以上55.25克/吨AuJ脉与10.10g/t Au相交超过0.55m。
  • SB-2021-087与突出显示的52条矿脉相交23.85克/吨Au超过1.80米以内5.26克/吨Au超过8.90米.
  • SB-2021-085孔与突出显示的52号矿脉相交2.50米以上14.13克/吨Au1.45米以上的新矿脉为7.59g/t Au。
  • 之前在52个矿脉上的钻探返回了高品位的化验,其中SB-2021-069孔的Au含量为10.09克/吨,超过4.35米,SB-2021-030孔的Au含量为19.95克/吨,超过1.00米。

Terry Harbort, CEO of Talisker, commented, "These three holes confirm high grade mineralization over a significant strike length, highlighting the extensive vein continunity known as one of the defining characteristics of the Bralorne deposit. We are very pleased with the consistency of the gold mineralization intercepted in this structure and see the 52 vein building to one of the important ore bodies of our upcoming resource."

Talisker首席执行官Terry Harbort评论说:“这三个洞证实了在一个重要的走向长度上的高品位矿化,突出了广泛的矿脉连续性,这是Bralorne矿床的决定性特征之一。我们对在这个构造中截获的金矿化的一致性感到非常高兴,并看到52个矿脉正在形成我们即将开采的重要矿体之一。”

Six diamond drills and 1 RC drill are currently operating at Bralorne. A total of 104,162 metres (197 holes) has been completed since Talisker initiated drilling at the Project in February 2020. 26,365 samples are currently at the assay laboratory and are expected to be received by the Company shortly.

6个钻石钻机和1个RC钻机目前正在布拉洛恩作业。自2020年2月Talisker开始在该项目钻探以来,总共完成了104,162米(197个孔)的钻探。26,365个样本目前在化验实验室,预计公司很快就会收到。

Hole Descriptions:

孔描述:

SB-2021-085

SB-2021-085

  • Located in the Bralorne East Block and hosted in dioritic intrusive
  • New vein intersected from 296.25 to 299.00 m
  • 52 vein intersected from 387.00 to 389.50 m hosting visible gold
  • 位于布拉洛恩东部地块,赋存于闪长岩侵入岩中
  • 新静脉相交距离从296.25米到299.00米
  • 52条矿脉从387.00米到389.50米相交,赋存可见的金矿

SB-2021-087

SB-2021-087

  • Located in the Bralorne East Block and hosted in granitic intrusive
  • 51 BFW vein intersected from 298.50 to 300 m
  • 52 vein intersected from 495.20 to 497.00 m
  • New vein intersected from 659.55 to 660.80 m
  • 位于布拉洛恩东部地块,赋存于花岗岩侵入岩中
  • 51条BFW静脉从298.50米到300m相交
  • 52条静脉相交距离从495.20米到497.00米
  • 新静脉相交距离从659.55米到660.80米

SB-2021-090

SB-2021-090

  • Located in the Pioneer Block and hosted in volcanics
  • 52 vein intersected from 190.00 to 191.30 m hosting visible gold
  • J vein intersected from 598.65 to 599.75 m
  • 位于先锋地块,位于火山岩中
  • 52条矿脉从190.00米到191.30米相交,赋存可见的金矿
  • J静脉相交距离从598.65米到599.75米

Complete results have been received for all reported holes as outlined in Table 1 below. All major vein structures intersected and reported in this release are considered to be classic Bralorne crack-seal quartz-carbonate veins. The veins display densely banded sulphide septae, hosting fine-grained arsenopyrite and pyrite mineralization with strong silica-sericite alteration halos. All reported drill assay results are available on the Company's website at the following link:

已收到下面表1中列出的所有报告孔的完整结果。本新闻稿中报道的所有相交的主要脉体构造均被认为是典型的Bralorne裂缝封闭型石英-碳酸盐脉体。脉体呈致密条带状硫化物隔层,赋存细粒毒砂和黄铁矿矿化,具有较强的硅绢云母蚀变晕。所有报告的钻探化验结果均可在公司网站上查阅,链接如下:

Table 1: Bralorne Gold Project - Drill Holes SB-2021-085, 087, 090

Diamond Drill
Hole Name

From
(m)

To
(m)

Interval
(m)

Au
(g/t)

Zone

Method Reported

SB-2021-085

296.25

297.7

1.45

7.59

New vein

Au-SCR24
SB-2021-085

297.7

298.5

0.8

0.32

Au-AA26
SB-2021-085

298.5

299

0.5

3.72

Au-SCR24
SB-2021-085

387

387.5

0.5

7.75

52 Vein

Au-SCR24
SB-2021-085

387.5

388

0.5

29.60

Au-SCR24
SB-2021-085

388

388.5

0.5

5.84

Au-SCR24
SB-2021-085

388.5

389

0.5

2.35

Au-SCR24
SB-2021-085

389

389.5

0.5

25.10

Au-SCR24
SB-2021-087

294.65

295.15

0.5

0.35

51BFW Vein

Au-AA26
SB-2021-087

295.15

295.65

0.5

1.06

Au-SCR24
SB-2021-087

295.65

296.15

0.5

1.09

Au-SCR24
SB-2021-087

296.15

296.98

0.83

0.79

Au-SCR24
SB-2021-087

296.98

297.5

0.52

0.49

Au-SCR24
SB-2021-087

297.5

298

0.5

1.45

Au-SCR24
SB-2021-087

298

298.5

0.5

0.59

Au-SCR24
SB-2021-087

298.5

299.1

0.6

7.69

Au-SCR24
SB-2021-087

299.1

300

0.9

0.90

Au-SCR24
SB-2021-087

300

301

1

0.25

Au-SCR24
SB-2021-087

301

302

1

0.10

Au-SCR24
SB-2021-087

302

303

1

0.20

Au-SCR24
SB-2021-087

303

303.5

0.5

0.21

Au-SCR24
SB-2021-087

303.5

304

0.5

0.10

Au-SCR24
SB-2021-087

495.2

495.72

0.52

80.90

52 Vein

Au-AA26
SB-2021-087

495.72

497

1.28

0.30

Au-AA26
SB-2021-087

497

498

1

0.26

Au-AA26
SB-2021-087

498

499

1

0.09

Au-AA26
SB-2021-087

499

500

1

0.41

Au-AA26
SB-2021-087

500

501.1

1.1

1.07

Au-AA26
SB-2021-087

501.1

502

0.9

0.26

Au-AA26
SB-2021-087

502

503

1

0.33

Au-AA26
SB-2021-087

503

503.6

0.6

2.28

Au-AA26
SB-2021-087

659.55

660.25

0.7

8.21

New Vein

Au-SCR24
SB-2021-087

660.25

660.8

0.55

0.16

Au-AA26
SB-2021-090

190

190.75

0.75

0.07

52 Vein

Au-AA26
SB-2021-090

190.75

191.3

0.55

130.50

Au-SCR24
SB-2021-090

598.65

599.2

0.55

0.41

J Vein

Au-AA26
SB-2021-090

599.2

599.75

0.55

10.10

Au-SCR24

Notes: Diamond drill hole SB-2021-085 has collar orientation of Azimuth 177; Dip -45. Diamond drill hole SB-2021-087 has a collar orientation of Azimuth 177; Dip -47. Diamond drill hole SB-2021-090 has a collar orientation of Azimuth 176; Dip -63. True widths are estimated at 40 - 90% of intercept lengths and are based on oriented core measurements where available. Method Reported includes the most up-to-date information as of the date of this press release.

表1:Bralorne金矿项目-钻孔SB-2021-087090

金刚石钻头
孔名称

从…
(m)


(m)

间隔
(m)

Au
(克/吨)

分带

报告的方法

SB-2021-085

296.25

297.7

1.45

7.59

新脉络

Au-SCR24
SB-2021-085

297.7

298.5

0.8

0.32

Au-AA26
SB-2021-085

298.5

299

0.5

3.72

Au-SCR24
SB-2021-085

387

387.5

0.5

7.75

52条静脉

Au-SCR24
SB-2021-085

387.5

388

0.5

29.60

Au-SCR24
SB-2021-085

388

388.5

0.5

5.84

Au-SCR24
SB-2021-085

388.5

389

0.5

2.35

Au-SCR24
SB-2021-085

389

389.5

0.5

25.10

Au-SCR24
SB-2021-087

294.65

295.15

0.5

0.35

51BFW静脉

Au-AA26
SB-2021-087

295.15

295.65

0.5

1.06

Au-SCR24
SB-2021-087

295.65

296.15

0.5

1.09

Au-SCR24
SB-2021-087

296.15

296.98

0.83

0.79

Au-SCR24
SB-2021-087

296.98

297.5

0.52

0.49

Au-SCR24
SB-2021-087

297.5

298

0.5

1.45

Au-SCR24
SB-2021-087

298

298.5

0.5

0.59

Au-SCR24
SB-2021-087

298.5

299.1

0.6

7.69

Au-SCR24
SB-2021-087

299.1

300

0.9

0.90

Au-SCR24
SB-2021-087

300

301

1

0.25

Au-SCR24
SB-2021-087

301

302

1

0.10

Au-SCR24
SB-2021-087

302

303

1

0.20

Au-SCR24
SB-2021-087

303

303.5

0.5

0.21

Au-SCR24
SB-2021-087

303.5

304

0.5

0.10

Au-SCR24
SB-2021-087

495.2

495.72

0.52

80.90

52条静脉

Au-AA26
SB-2021-087

495.72

497

1.28

0.30

Au-AA26
SB-2021-087

497

498

1

0.26

Au-AA26
SB-2021-087

498

499

1

0.09

Au-AA26
SB-2021-087

499

500

1

0.41

Au-AA26
SB-2021-087

500

501.1

1.1

1.07

Au-AA26
SB-2021-087

501.1

502

0.9

0.26

Au-AA26
SB-2021-087

502

503

1

0.33

Au-AA26
SB-2021-087

503

503.6

0.6

2.28

Au-AA26
SB-2021-087

659.55

660.25

0.7

8.21

新脉络

Au-SCR24
SB-2021-087

660.25

660.8

0.55

0.16

Au-AA26
SB-2021-090

190

190.75

0.75

0.07

52条静脉

Au-AA26
SB-2021-090

190.75

191.3

0.55

130.50

Au-SCR24
SB-2021-090

598.65

599.2

0.55

0.41

J脉

Au-AA26
SB-2021-090

599.2

599.75

0.55

10.10

Au-SCR24

注:钻石钻孔SB-2021-085的卡箍方位为177°;Dip-45°。SB-2021-087金刚石钻孔的钻具方位为177°;倾角为47°。SB-2021-090金刚石钻孔的钻具方位为176°;倾角为63°。真实宽度估计为截距长度的40%-90%,并基于可用的定向岩心测量。报告的方法包括截至本新闻稿发布日期的最新信息。

Talisker is providing an opportunity for shareholders and other interested parties to participate in a Webinar to be held at 4:15 pm ET on Tuesday, January 25th. To register, please click on the following link - .

Talisker正在为股东和其他感兴趣的各方提供参加网络研讨会的机会,该研讨会将于美国东部时间1月25日(星期二)下午4点15分举行。。如欲登记,请按以下连结-.

Qualified Person

合格人员

The technical information contained in this news release relating to the drill results at the Bralorne Gold Project has been approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker's Vice President, Exploration and Resource Development, who is a "qualified person" within the meaning of National Instrument 43-101, Standards of Disclosure for Mineral Projects.

本新闻稿中包含的有关Bralorne金矿钻探结果的技术信息已获得Talisker负责勘探和资源开发的副总裁Leonardo de Souza(BSC,澳大利亚矿业管理委员会(CP)会员224827)的批准,他是National Instrument 43-101“矿物项目披露标准”所指的“合格人士”。

About Talisker Resources Ltd.

关于Talisker Resources Ltd.

Talisker (taliskerresources.com) is a junior resource company involved in the exploration of gold projects in British Columbia, Canada. Talisker's projects include two advanced stage projects, the Bralorne Gold Complex and the Ladner Gold Project, both advanced stage projects with significant exploration potential from historical high-grade producing gold mines, as well as its Spences Bridge Project where the Company holds ~85% of the emerging Spences Bridge Gold Belt and several other early-stage Greenfields projects. With its properties comprising 296,983 hectares over 346 claims, three leases and 198 crown grant claims, Talisker is a dominant exploration player in the south-central British Columbia. The Company is well funded to advance its aggressive systematic exploration program at its projects.

Talisker(taliskerresource ces.com)是一家初级资源公司,在加拿大不列颠哥伦比亚省从事金矿项目的勘探。Talisker的项目包括两个高级项目:Bralorne Gold Complex和Ladner Gold Project,这两个项目都是从历史上生产的高品位金矿中获得巨大勘探潜力的高级项目,以及Spence Bridge项目,该公司持有Emerging Spence Bridge金矿带约85%的股份,以及其他几个早期绿地项目。Talisker的物业面积296983公顷,涉及346项索赔、3份租约和198项皇冠拨款索赔,是不列颠哥伦比亚省中南部的主要勘探公司。该公司有充足的资金来推进其项目中积极的系统勘探计划。

For further information, please contact:
Terry Harbort
President and CEO
Terry.harbort@taliskerresources.com
+1 416 361 2808

如需更多信息,请联系:
特里·哈博特
总裁兼首席执行官
邮箱:terry.harbort@taliskerresource ces.com
+1 416 361 2808

Sample Preparation and QAQC

样品制备与QAQC

Drill core at the Bralorne project is drilled in HQ to NQ size ranges (63.5mm and 47.6mm respectively). Drill core samples are minimum 50 cm and maximum 160 cm long along the core axis. Samples are focused on an interval of interest such as a vein or zone of mineralization. Shoulder samples bracket the interval of interest such that a total sampled core length of not less than 3m both above and below the interval of interest must be assigned. Sample QAQC measures of unmarked certified reference materials (CRMs), blanks, and duplicates are inserted into the sample sequence and make up 9% of the samples submitted to the lab for holes reported in this release. Sample preparation and analyses is carried out by ALS Global in North Vancouver, British Columbia, Canada and SGS Canada in Burnaby, British Columbia, Canada. Drill core sample preparation includes drying in an oven at a maximum temperature of 60°C, fine crushing of the sample to at least 70% passing less than 2 mm, sample splitting using a riffle splitter, and pulverizing a 250 g split to at least 85% passing 75 microns (ALS code PREP-31 / SGS code PRP89). Gold in diamond drill core is analysed by fire assay and atomic absorption spectroscopy (AAS) of a 50g sample (ALS code Au-AA26 / SGS code GO_FAA50V10), while multi-element chemistry is analysed by 4- Acid digestion of a 0.25 g sample split with detection by inductively coupled plasma mass spectrometer (ICP-MS) for 48 elements (Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In, K, La, Li, Mg, Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr, Ta, Te, Th, Ti, Tl, U, V, W, Y, Zn, Zr). Gold assay technique (ALS code Au-AA26 / SGS code FAA50V10) has an upper detection limit of 100 ppm. Any sample that produces an over-limit gold value via the gold assay technique is sent for gravimetric finish (ALS method Au-GRA22 / SGS method GO_FAG50V) which has an upper detection limit of 1,000 ppm Au. Samples where visible gold was observed are sent directly to screen metallics analysis and all samples that fire assay above 1 ppm Au are re-analysed with method (ALS code Au-SCR24 / SGS code - 6 - GO_FAS50M) which employs a 1kg pulp screened to 100 microns with assay of the entire oversize fraction and duplicate 50g assays on the undersize fraction. Where possible all samples initially sent to screen metallics processing will also be re-run through the fire assay with gravimetric finish provided there is enough material left for further processing.

Bralorne项目的钻芯钻进尺寸范围从HQ到NQ(分别为63.5 mm和47.6 mm)。钻芯样品沿岩心轴线最小为50厘米,最长为160厘米。样品集中在感兴趣的区间,如矿脉或矿化带。肩部样本包括感兴趣的区间,因此必须指定感兴趣的区间上下的总取样岩心长度均不小于3m。未标记的认证标准物质(CRM)、空白和复制品的样品QAQC测量被插入到样品序列中,并占本新闻稿中报告的孔洞提交给实验室的样品的9%。样品准备和分析由加拿大不列颠哥伦比亚省北温哥华的ALS Global和加拿大不列颠哥伦比亚省本纳比的SGS Canada进行。钻芯样品制备包括在最高温度为60°C的烤箱中烘干,将样品粉碎至至少70%(小于2 mm),使用刮刀分割器将样品分割,并将250克裂解样品粉碎到至少85%(ALS代码PREP-31/SGS代码PRP89)(ALS代码PREP-31/SGS代码PRP89)。用火试法和原子吸收光谱法(AAS)对50g样品(ALS代码Au-Aa26/SGS代码GO_FAA50V10)中的金进行分析,同时对0.25g样品进行4酸消解,用电感耦合等离子体质谱(ICP-MS)检测48种元素(Ag,Al,As,Ba,Be,Bi,Ca,Cd,Ce,Co,Cr,Cs,Cu,Fe,Ga,Ge,Hf,In,K,Ce,Co,Cr,Cs,Cu,Fe,Ga,Ge,Hf,In,K,Ce,Co,Cr,Cs,Cu,Fe,Ga,Ge,Hf,In,K,...Li、Mg、Mn、Mo、Na、Nb、Ni、P、Pb、Rb、Re、S、Sb、Sc、Se、Sn、Sr、Ta、Te、Th、Ti、Tl、U、V、W、Y、Zn、Zr)。金检测技术(ALS代码au-aa26/SGS代码FAA50V10)的检测上限为100ppm。任何通过金分析技术产生超限金值的样品都将被送去进行重量分析(ALS方法Au-GRA22/SGS方法GO_FAG50V),其检测下限上限为1, 1000ppm Au。观察到可见金的样品被直接送到金属分析筛查,所有火试金值高于1ppm的样品都用方法(ALS代码Au-SCR24/SGS代码-6-GO_FAS50M)重新分析,该方法使用1公斤纸浆筛分至100微米,对整个过大组分进行分析,对较小组分重复50g测试。在可能的情况下,所有最初送往筛分金属加工的样品,只要有足够的材料可供进一步加工,也将用重量法进行火试。

Caution Regarding Forward-Looking Information

关于前瞻性信息的警告

Certain statements contained in this press release constitute forward-looking information. These statements relate to future events or future performance. The use of any of the words "could", "intend", "expect", "believe", "will", "projected", "estimated" and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on Talisker's current belief or assumptions as to the outcome and timing of such future events. Actual future results may differ materially. Those assumptions and factors are based on information currently available to Talisker. Although such statements are based on reasonable assumptions of Talisker's management, there can be no assurance that any conclusions or forecasts will prove to be accurate.

本新闻稿中包含的某些陈述属于前瞻性信息。这些陈述与未来事件或未来表现有关。使用“可能”、“打算”、“预期”、“相信”、“将会”、“预计”、“估计”以及与非历史事实有关的类似表述和陈述,旨在识别前瞻性信息,并基于Talisker对此类未来事件的结果和时间的当前信念或假设。未来的实际结果可能会大不相同。这些假设和因素是基于Talisker目前掌握的信息。尽管这样的陈述是基于对Talisker管理层的合理假设,但不能保证任何结论或预测将被证明是准确的。

While Talisker considers these statements to be reasonable based on information currently available, they may prove to be incorrect. Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include market risks and the demand for securities of the Company, risks inherent in the exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined, risks relating to variations in grade or recovery rates, risks relating to changes in mineral prices and the worldwide demand for and supply of minerals, risks related to increased competition and current global financial conditions and the COVID-19 pandemic, access and supply risks, reliance on key personnel, operational risks, and regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks.

虽然Talisker认为根据目前获得的信息,这些说法是合理的,但它们可能被证明是不正确的。前瞻性信息涉及已知和未知的风险、不确定性和其他因素,这些风险、不确定性和其他因素可能导致实际结果、业绩或成就与前瞻性信息明示或暗示的任何未来结果、业绩或成就大不相同。这些因素包括市场风险和对公司证券的需求;矿藏勘探和开发过程中固有的风险,包括随着计划的不断调整而改变项目参数的风险;与品位或回收率变化有关的风险;与矿价变化和全球矿产供需变化有关的风险;与竞争加剧和当前全球金融状况以及新冠肺炎大流行有关的风险;准入和供应风险;对关键人员的依赖;运营风险;以及监管风险,包括与获得必要的许可证和许可证有关的风险、融资、资本化和流动性风险

The forward-looking information contained in this news release is made as of the date hereof, and Talisker is not obligated to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable securities laws. Because of the risks, uncertainties and assumptions contained herein, investors should not place undue reliance on forward-looking information. The foregoing statements expressly qualify any forward-looking information contained herein.

本新闻稿中包含的前瞻性信息是截至本文发布之日的,Talisker没有义务因新信息、未来事件或其他原因而更新或修改任何前瞻性信息,除非适用的证券法要求这样做。由于本文包含的风险、不确定性和假设,投资者不应过度依赖前瞻性信息。前述陈述明确限定了本文中包含的任何前瞻性信息。

Figure 1: SB-2021-085 hole location within the Bralorne East Block.

图1:Bralorne East Block内的SB-2021-085孔位置。

Figure 2: SB-2021-087 hole location within the Bralorne East Block.

图2:Bralorne East Block内的SB-2021-087孔位置。

Figure 3: SB-2021-090 hole location within the Pioneer Block.

图3:SB-2021-090先锋区块内的孔位置。

Figure 4: SB-2021-085, 087 and 090 cross section with vein intersections and grade.

图4:SB-2021-085、087和090横截面,带静脉交叉点和坡度。

SOURCE: Talisker Resources Ltd.

资料来源:泰利斯克资源有限公司


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发