share_log

Talisker Restarts Drilling at Bralorne and Continues to Intercept New High-Grade Veins

Accesswire ·  2022/01/13 07:06

TORONTO, ON / ACCESSWIRE / January 13, 2022 / Talisker Resources Ltd. ("Talisker" or the "Company") (TSX:TSK)(OTCQX:TSKFF) is pleased to announce the restart of drilling at its 100% owned flagship Bralorne Gold Project. In addition, the Company has received high-grade results from drill hole SB-2021-077A highlighted by 22.99 g/t Au over 2.0 metres within 2.89 g/t Au over 18.40 metres.

安大略省多伦多/ACCESSWIRE/2022年1月13日/塔利斯克资源有限公司(“Talisker” 或 “公司”)(多伦多证券交易所股票代码:TSK)(OTCQX: TSKFF)欣然宣布重启其100%所有权的旗舰Bralorne黄金项目的钻探。此外,该公司从 SB-2021-077A 钻孔中获得了高品位的结果,突出显示在 2.0 米以上,金含量为 22.99 g/t Au,在 18.40 米以上的 2.89 g/t Au 范围内。

Key Points:

要点:

  • The Company has initiated drilling with a total of six drill rigs with a seventh starting later in the month.
  • Hole SB-2021-077A intersected high-grade mineralization within a newly defined vein highlighted by 22.99 g/t Au over 2.0 metres within a broader zone of 2.89 g/t Au over 18.40 metres.
  • Another new vein was intersected between 664.5 and 665 metres grading 9.08 g/t Au.
  • The 55FW vein was intersected between 900.28 and 901.3 metres grading 6.47 g/t Au.
  • SB-2021-077A is the 10th intersection on the 55FW vein.
  • The 53 vein was intersected at a depth of 1,007.7 metres and graded 35.40 g/t over 0.5 metres within 3.14 g/t Au over 6.20 metres.
  • SB-2021-077A is the 34th intersection on the 53 vein highlighted by previously released results of 6.83 g/t Au over 1.5 metres (hole SB-2020-008), 16.42 g/t Au over 1.10 metres (hole SB-2021-012) and 8.67 g/t Au over 1.25 metres within 2.04 g/t Au over 15.10 metres (hole SB-2021-049).
  • The Company continues to advance rapidly to its maiden resource for the Bralorne Gold Project expected during Q2 2022.
  • 该公司已开始钻探,共有六台钻机,第七台将于本月晚些时候开始。
  • SB-2021-077A 孔在一条新定义的矿脉内与高品位矿化层相交,在 18.40 米以上的更宽的区域内,2.99 g/t Au 在 2.89 g/t Au 的更宽区域内突出显示了 2.99 g/t Au。
  • 另一条新矿脉相交于664.5至665米之间,金品位为9.08 g/t。
  • 55FW 矿脉在 900.28 到 901.3 米之间相交,金品位为 6.47 g/t。
  • SB-2021-077A 是 10第四 55FW 静脉的交叉点。
  • 这条53号矿脉在1,007.7米的深度相交,在超过6.20米的3.14克/吨金矿范围内,0.5米处的等级为35.40克/吨。
  • SB-2021-077A 是 34第四 此前公布的结果突显了53号矿脉的交叉点,其中1.5米以上(SB-2020-008 洞)为6.83克/吨金,超过1.10米(SB-2021-012 孔)为16.42克/吨金,在1.25米以内超过1.25米的金含量为8.67克/吨金(钻孔 SB-2021-049)。
  • 该公司继续快速开发预计在2022年第二季度推出的Bralorne黄金项目的首个资源。

Terry Harbort, President and CEO of Talisker commented, "We are very pleased to be starting drilling again at Bralorne following what was a challenging 2021 for our communities, staff and the junior exploration industry as a whole. Talisker advanced strongly last year with our drill program and we invisage a further 20,000m to reach our planned resource target."

Talisker总裁兼首席执行官Terry Harbort评论说:“我们很高兴在2021年我们的社区、员工和整个初级勘探行业经历了充满挑战的2021年之后,再次开始在Bralorne进行钻探。去年,Talisker的钻探计划取得了强劲的进展,我们计划再钻探20,000米,以实现我们计划的资源目标。”

A total of 83,847 metres consisting of 164 holes of a planned and fully funded 100,000 metres was drilled at the Bralorne Gold Project in 2021 with a total of 104,162 metres (197 holes) completed since Talisker initiated drilling in February 2020. A total of 28,833 samples are currently at the assay laboratory and are expected to be received by the Company shortly.

2021 年,布拉洛恩金矿项目共钻探了 83,847 米,包括 164 个孔,其中计划开采且资金充足 10 万米,自 Talisker 于 2020 年 2 月开始钻探以来,共完成了 104,162 米(197 个洞)。目前,化验实验室共有28,833份样本,预计该公司将很快收到样本。

SB-2021-077A Hole Description

SB-2021-077A 孔洞描述

  • Complete results have been received for this hole.
  • Located in the Bralorne West block and centrally located within the Bralorne Diorite intrusive.
  • Broad zones of mineralization related to a new vein intersected from 222.10 to 240.00m.
  • 55 Footwall vein intersected from 900.28 to 901.82m.
  • 53 vein intersected from 1,007.70 to 1,009.00m with visible gold.
  • Major vein structures intersected are considered classic Bralorne crack-seal quartz-carbonate veins with densely banded sulphide septae hosting fine-grained arsenopyrite and pyrite mineralization with strong silica-sericite alteration halos.
  • Zones of broader mineralization are hosted in both the granitic intrusive and diorite as zones of increased veinlet density associated with intense silica-sericite alteration and disseminated pyrite-arsenopyrite mineralization.
  • 已经收到了这个洞的完整结果。
  • 位于 Bralorne West 街区,位于 Bralorne Diorite Intrusive Intrusive 的中心地带。
  • 与一条新矿脉相关的广阔矿化区域从 222.10 到 240.00m 相交。
  • 55 条足部静脉从 900.28 到 901.82m 相交。
  • 53 条矿脉从 1,007.70 到 1,009.00 米处相交,有可见的金色。
  • 相交的主要矿脉结构被认为是典型的 Bralorne 裂纹封闭式石英碳酸盐矿脉,具有密集的带状硫化物隔层,含有细颗粒的亚硫铁矿和黄铁矿矿化层,带有强烈的二氧化硅-绢云母蚀变光环。
  • 更广泛的矿化区域存在于花岗岩侵入岩和闪长岩中,这些区域是矿脉密度增加的区域,与强烈的二氧化硅-绢云母蚀变和浸染的黄铁矿-亚硫铁矿矿化作用有关。

Table 1: Bralorne Gold Project - Drill Hole SB-2021-077A

Diamond Drill Hole Name

From

(m)

To

(m)

Interval

(m)

Au

(g/t)

Zone

Method Reported

SB-2021-077A

221.6

222.1

0.5

0.38

Vein Halo

Au-AA26
SB-2021-077A

222.1

222.6

0.5

3.69

Au-SCR24
SB-2021-077A

222.6

224

1.4

0.01

Au-AA26
SB-2021-077A

224

225

1

0.18

Au-AA26
SB-2021-077A

225

226

1

0.40

Au-AA26
SB-2021-077A

226

226.5

0.5

0.17

Au-AA26
SB-2021-077A

226.5

227

0.5

0.46

Au-AA26
SB-2021-077A

227

227.5

0.5

0.02

Au-AA26
SB-2021-077A

227.5

228

0.5

0.12

Au-AA26
SB-2021-077A

228

228.5

0.5

0.98

Au-AA26
SB-2021-077A

228.5

229

0.5

0.82

Au-AA26
SB-2021-077A

229

229.5

0.5

0.10

Au-AA26
SB-2021-077A

229.5

230

0.5

0.02

Au-AA26
SB-2021-077A

230

230.5

0.5

0.15

Au-AA26
SB-2021-077A

230.5

231.3

0.8

1.65

New Vein

Au-SCR24
SB-2021-077A

231.3

232

0.7

25.10

Au-SCR24
SB-2021-077A

232

232.5

0.5

24.80

Au-SCR24
SB-2021-077A

232.5

233.3

0.8

20.00

Au-SCR24
SB-2021-077A

233.3

233.8

0.5

1.89

Au-SCR24
SB-2021-077A

233.8

234.3

0.5

0.62

Vein Halo

Au-AA26
SB-2021-077A

234.3

234.9

0.6

0.32

Au-AA26
SB-2021-077A

234.9

236

1.1

0.11

Au-AA26
SB-2021-077A

236

237

1

0.03

Au-AA26
SB-2021-077A

237

238

1

0.06

Au-AA26
SB-2021-077A

238

239

1

0.02

Au-AA26
SB-2021-077A

239

240

1

0.22

Au-AA26
SB-2021-077A

662.5

664

1.5

0.24

New Vein

Au-AA26
SB-2021-077A

664

664.5

0.5

3.87

Au-SCR24
SB-2021-077A

664.5

665

0.5

9.08

Au-SCR24
SB-2021-077A

665

666

1

0.29

Au-AA26
SB-2021-077A

666

667

1

0.18

Au-AA26
SB-2021-077A

900.28

901.3

1.02

6.47

55FW Vein

Au-SCR24
SB-2021-077A

901.3

901.82

0.52

1.24

Au-SCR24
SB-2021-077A

1005.7

1006.2

0.5

0.71

53 Vein

Au-AA26
SB-2021-077A

1006.2

1006.7

0.5

0.14

Au-AA26
SB-2021-077A

1006.7

1007.2

0.5

0.04

Au-AA26
SB-2021-077A

1007.2

1007.7

0.5

0.01

Au-AA26
SB-2021-077A

1007.7

1008.2

0.5

35.40

Au-AA26
SB-2021-077A

1008.2

1009

0.8

0.01

Au-AA26
SB-2021-077A

1009

1010.5

1.5

0.01

Au-AA26
SB-2021-077A

1010.5

1011.9

1.4

0.93

Au-AA26
Notes: Diamond drill hole SB-2021-077A has collar orientation of Azimuth 180; Dip -53.5. True widths are estimated at 40 - 90% of intercept lengths and are based on oriented core measurements where available. Method Reported includes the most up to date information as of the date of this press release.

表 1:Bralorne 黄金项目-钻孔 SB-2021-077A

金刚石钻孔名称

来自

(m)

(m)

间隔

(m)

Au

(g/t)

区域

方法已报告

SB-2021-077A

221.6

222.1

0.5

0.38

静脉光环

au-aa26
SB-2021-077A

222.1

222.6

0.5

3.69

au-scr24
SB-2021-077A

222.6

224

1.4

0.01

au-aa26
SB-2021-077A

224

225

1

0.18

au-aa26
SB-2021-077A

225

226

1

0.40

au-aa26
SB-2021-077A

226

226.5

0.5

0.17

au-aa26
SB-2021-077A

226.5

227

0.5

0.46

au-aa26
SB-2021-077A

227

227.5

0.5

0.02

au-aa26
SB-2021-077A

227.5

228

0.5

0.12

au-aa26
SB-2021-077A

228

228.5

0.5

0.98

au-aa26
SB-2021-077A

228.5

229

0.5

0.82

au-aa26
SB-2021-077A

229

229.5

0.5

0.10

au-aa26
SB-2021-077A

229.5

230

0.5

0.02

au-aa26
SB-2021-077A

230

230.5

0.5

0.15

au-aa26
SB-2021-077A

230.5

231.3

0.8

1.65

新静脉

au-scr24
SB-2021-077A

231.3

232

0.7

25.10

au-scr24
SB-2021-077A

232

232.5

0.5

24.80

au-scr24
SB-2021-077A

232.5

233.3

0.8

20.00

au-scr24
SB-2021-077A

233.3

233.8

0.5

1.89

au-scr24
SB-2021-077A

233.8

234.3

0.5

0.62

静脉光环

au-aa26
SB-2021-077A

234.3

234.9

0.6

0.32

au-aa26
SB-2021-077A

234.9

236

1.1

0.11

au-aa26
SB-2021-077A

236

237

1

0.03

au-aa26
SB-2021-077A

237

238

1

0.06

au-aa26
SB-2021-077A

238

239

1

0.02

au-aa26
SB-2021-077A

239

240

1

0.22

au-aa26
SB-2021-077A

662.5

664

1.5

0.24

新静脉

au-aa26
SB-2021-077A

664

664.5

0.5

3.87

au-scr24
SB-2021-077A

664.5

665

0.5

9.08

au-scr24
SB-2021-077A

665

666

1

0.29

au-aa26
SB-2021-077A

666

667

1

0.18

au-aa26
SB-2021-077A

900.28

901.3

1.02

6.47

55FW 静脉

au-scr24
SB-2021-077A

901.3

901.82

0.52

1.24

au-scr24
SB-2021-077A

1005.7

1006.2

0.5

0.71

53 静脉

au-aa26
SB-2021-077A

1006.2

1006.7

0.5

0.14

au-aa26
SB-2021-077A

1006.7

1007.2

0.5

0.04

au-aa26
SB-2021-077A

1007.2

1007.7

0.5

0.01

au-aa26
SB-2021-077A

1007.7

1008.2

0.5

35.40

au-aa26
SB-2021-077A

1008.2

1009

0.8

0.01

au-aa26
SB-2021-077A

1009

1010.5

1.5

0.01

au-aa26
SB-2021-077A

1010.5

1011.9

1.4

0.93

au-aa26
注意:金刚石钻孔 SB-2021-077A 的环方向为方位角 180;Dip -53.5。实际宽度估计为截距长度的40-90%,并以定向核心测量为基础(如果有)。报告方法包括截至本新闻稿发布之日的最新信息。

Qualified Person

合格人员

The technical information contained in this news release relating to the drill results at the Bralorne Gold Project has been approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker's Vice President, Exploration and Resource Development, who is a "qualified person" within the meaning of National Instrument 43-101, Standards of Disclosure for Mineral Projects.

本新闻稿中包含的与Bralorne黄金项目钻探结果有关的技术信息已获得Talisker勘探和资源开发副总裁莱昂纳多·德索萨(BSc,Ausimm(CP)会员 224827)的批准,他是国家仪器43-101《矿产项目披露标准》所指的 “合格人员”。

About Talisker Resources Ltd.

关于 Talisker Resources Ltd

Talisker (taliskerresources.com) is a junior resource company involved in the exploration of gold projects in British Columbia, Canada. Talisker's projects include two advanced-stage projects, the Bralorne Gold Complex and the Ladner Gold Project, both advanced-stage projects with significant exploration potential from historical high-grade producing gold mines, as well as its Spences Bridge Project where the Company holds ~85% of the emerging Spences Bridge Gold Belt and several other early-stage Greenfields projects. With its properties comprising 296,983 hectares over 346 claims, three leases and 198 crown grant claims, Talisker is a dominant exploration player in south-central British Columbia. The Company is well funded to advance its aggressive systematic exploration program at its projects.

Talisker (taliskerresources.com)) 是一家参与加拿大不列颠哥伦比亚省黄金项目勘探的初级资源公司。Talisker的项目包括两个后期项目,即Bralorne黄金综合体和拉德纳黄金项目,这两个项目均为后期项目,具有从历史上高品位生产金矿中开采的巨大勘探潜力,以及其Spences Bridge项目,该公司持有新兴Spences Bridge金带约85%的股份和其他几个早期绿地项目。Talisker的房产占地296,983公顷,超过346份索赔,三份租约和198份官方拨款申请,是不列颠哥伦比亚省中南部的主要勘探公司。该公司资金充足,可以在其项目中推进其积极的系统勘探计划。

For further information, please contact:

欲了解更多信息,请联系:

Terry Harbort
President and CEO
Terry.harbort@taliskerresources.com
+1 416 361 2808

特里·哈伯特
总裁兼首席执行官
Terry.harbort@taliskerresources.com
+1 416 361 2808

Sample Preparation and QAQC

样品制备和质量控制

Drill core at the Bralorne project is drilled in HQ to NQ size ranges (63.5mm and 47.6mm respectively). Drill core samples are minimum 50 cm and maximum 160 cm long along the core axis. Samples are focused on an interval of interest such as a vein or zone of mineralization. Shoulder samples bracket the interval of interest such that a total sampled core length of not less than 3m both above and below the interval of interest must be assigned. Sample QAQC measures of unmarked certified reference materials (CRMs), blanks, and duplicates are inserted into the sample sequence and make up 9% of the samples submitted to the lab for holes reported in this release. Sample preparation and analyses is carried out by ALS Global in North Vancouver, British Columbia, Canada and SGS Canada in Burnaby, British Columbia, Canada. Drill core sample preparation includes drying in an oven at a maximum temperature of 60°C, fine crushing of the sample to at least 70% passing less than 2 mm, sample splitting using a riffle splitter, and pulverizing a 250 g split to at least 85% passing 75 microns (ALS code PREP-31 / SGS code PRP89). Gold in diamond drill core is analysed by fire assay and atomic absorption spectroscopy (AAS) of a 50g sample (ALS code Au-AA26 / SGS code GO_FAA50V10), while multi-element chemistry is analysed by 4- Acid digestion of a 0.25 g sample split with detection by inductively coupled plasma mass spectrometer (ICP-MS) for 48 elements (Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In, K, La, Li, Mg, Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr, Ta, Te, Th, Ti, Tl, U, V, W, Y, Zn, Zr). Gold assay technique (ALS code Au-AA26 / SGS code FAA50V10) has an upper detection limit of 100 ppm. Any sample that produces an over-limit gold value via the gold assay technique is sent for gravimetric finish (ALS method Au-GRA22 / SGS method GO_FAG50V) which has an upper detection limit of 1,000 ppm Au. Samples where visible gold was observed are sent directly to screen metallics analysis and all samples that fire assay above 1 ppm Au are re-analysed with method (ALS code Au-SCR24 / SGS code - 6 - GO_FAS50M) which employs a 1kg pulp screened to 100 microns with assay of the entire oversize fraction and duplicate 50g assays on the undersize fraction. Where possible all samples initially sent to screen metallics processing will also be re-run through the fire assay with gravimetric finish provided there is enough material left for further processing.

Bralorne项目的钻芯是在总部钻探的,钻孔大小范围为NQ(分别为63.5毫米和47.6毫米)。沿岩心轴线的钻芯样品最小长度为 50 厘米,最大长度为 160 厘米。样本集中在感兴趣的区间上,例如矿脉或矿化区域。肩部样本围住感兴趣间隔,因此必须将高于和小于目标间隔的总采样核心长度分配不小于 3m。将未标记的认证参考材料 (CRM)、空白和副本的 QAQC 测量结果样本插入样本序列中,占提交给实验室的本新闻稿中报告的漏洞样本的 9%。样品制备和分析由加拿大不列颠哥伦比亚省北温哥华的ALS Global和加拿大不列颠哥伦比亚省本那比的SGS加拿大分公司进行。钻芯样品制备包括在最高温度为60°C的烤箱中干燥,将样品精细粉碎至少 70%,通过小于 2 mm,使用裂纹分离器进行样品分割,以及通过75微米将250 g的分裂物粉碎至至少 85%(ALS 代码 PREP-31 /SGS 代码 PRP89)。通过 50 克样品(ALS 代码 Au-AA26 /SGS 代码 GO_FAA50V10)的火法和原子吸收光谱 (AAS) 对金刚石钻芯中的金进行分析,而多元素化学则通过对分裂的 0.25 g 样品进行四酸消解,电感耦合等离子体质谱仪 (ICP-MS) 检测 48 种元素(Ag、As、Ba、Be、Bi、Ca)、镉、镉、钴、铬、镉、铜、铁、镓、锗、氦气、镍、钾、锂、镁、锰、钼、钠、镍、磷、铅、铑、硫、铅、铑、硫、锑、锡、锡、锡、锡、锡、钛、钛、钛、铀、V、W、Y、Zn、Zn、Zr)。金测定技术(ALS 代码 au-AA26 /SGS 代码 FAA50V10)的检出上限为 100 ppm。任何通过金分析技术产生超限金值的样品都将被送去进行重量法精加工(ALS方法Au-gra22/SGS方法GO_FAG50V),其上限为1,000ppm Au。观测到可见金的样本将直接送到筛查金属化合物分析,所有对金含量超过1 ppm的样品进行重新分析(ALS代码Au-scr24/SGS代码-6-GO_FAS50M),该方法使用筛选至100微米的1千克纸浆,对整个超大馏分进行测定,并对小尺寸部分进行重复50g检测。在可能的情况下,只要有足够的材料可供进一步处理,最初送往金属化合物筛选处理的所有样品也将通过重量法重新进行火试验。

Caution Regarding Forward-Looking Information

关于前瞻性信息的注意事项

Certain statements contained in this press release constitute forward-looking information. These statements relate to future events or future performance. The use of any of the words "could", "intend", "expect", "believe", "will", "projected", "estimated" and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on Talisker's current belief or assumptions as to the outcome and timing of such future events. Actual future results may differ materially. Those assumptions and factors are based on information currently available to Talisker. Although such statements are based on reasonable assumptions of Talisker's management, there can be no assurance that any conclusions or forecasts will prove to be accurate.

本新闻稿中包含的某些陈述构成前瞻性信息。这些陈述与未来事件或未来表现有关。使用任何 “可能”、“打算”、“期望”、“相信”、“将”、“预测”、“估计” 等词语以及与非历史事实相关的类似表述和陈述均旨在识别前瞻性信息,并基于塔利斯克目前对此类未来事件的结果和时间所持的看法或假设。未来的实际结果可能存在重大差异。这些假设和因素基于塔利斯克目前获得的信息。尽管此类陈述基于塔利斯克管理层的合理假设,但无法保证任何结论或预测都会被证明是准确的。

While Talisker considers these statements to be reasonable based on information currently available, they may prove to be incorrect. Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include market risks and the demand for securities of the Company, risks inherent in the exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined, risks relating to variations in grade or recovery rates, risks relating to changes in mineral prices and the worldwide demand for and supply of minerals, risks related to increased competition and current global financial conditions and the COVID-19 pandemic, access and supply risks, reliance on key personnel, operational risks, and regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks.

尽管根据目前可用的信息,Talisker认为这些陈述是合理的,但它们可能被证明是不正确的。前瞻性信息涉及已知和未知的风险、不确定性和其他因素,这些因素可能导致实际业绩、业绩或成就与前瞻性信息所表达或暗示的任何未来业绩、业绩或成就存在重大差异。这些因素包括市场风险和公司对证券的需求、矿床勘探和开发所固有的风险,包括与计划不断重新定义时项目参数变化有关的风险、与品位或回收率变化相关的风险、与矿产价格变化和全球矿产需求和供应相关的风险、与竞争加剧和当前全球金融状况以及 COVID-19 疫情相关的风险、准入和供应风险、对关键人员的依赖、运营风险和监管风险,包括与获得必要的执照和许可证有关的风险、融资、资本化和流动性风险。

The forward-looking information contained in this news release is made as of the date hereof, and Talisker is not obligated to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable securities laws. Because of the risks, uncertainties and assumptions contained herein, investors should not place undue reliance on forward-looking information. The foregoing statements expressly qualify any forward-looking information contained herein.

本新闻稿中包含的前瞻性信息截至本文发布之日发布,除非适用的证券法要求,否则Talisker没有义务更新或修改任何前瞻性信息,无论是由于新信息、未来事件还是其他原因造成的。由于此处包含的风险、不确定性和假设,投资者不应过分依赖前瞻性信息。上述陈述明确限定了此处包含的任何前瞻性信息。

Figure 1: SB-2021-077A hole location within the Bralorne West Block.

图 1:布拉洛恩西区内的 SB-2021-077A 洞位置。

Figure 2: SB-2021-077A cross section with vein intersections and grade.

图 2:带有静脉交叉点和等级的 SB-2021-077A 横截面。

SOURCE: Talisker Resources Ltd.

来源:Talisker Resources Ltd.


View source version on accesswire.com:
在 accesswire.com 上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发