share_log

Reported Earlier, Southern California Edison And Lotus Infrastructure Partners Selected By CAISO To Build Major Transmission Project Between San Diego And Orange Counties

Reported Earlier, Southern California Edison And Lotus Infrastructure Partners Selected By CAISO To Build Major Transmission Project Between San Diego And Orange Counties

早些时候报道,CAISO选择南加州爱迪生和莲花基础设施合作伙伴在圣地亚哥和奥兰治县之间建设大型输电项目
Benzinga ·  05/21 03:22

Southern California Edison and Lotus Infrastructure Partners today announced they were chosen by the California Independent System Operator (CAISO) to develop, permit, own, operate and maintain new transmission infrastructure that will deliver energy from renewable sources, such as utility-scale solar, wind and battery installations, to Southern California. The companies will build a high-voltage transmission line from Serrano Substation in north-central Orange County to a substation in the vicinity of the retired San Onofre Nuclear Generating Station (SONGS), largely utilizing existing rights of way for the line.

南加州爱迪生和莲花基础设施合作伙伴今天宣布,他们被加州独立系统运营商(CAISO)选中负责开发、许可、拥有、运营和维护新的输电基础设施,这些基础设施将从公用事业规模的太阳能、风能和电池装置等可再生能源向南加州输送能源。两家公司将修建一条从奥兰治县中北部的塞拉诺变电站到已退役的圣奥诺弗雷核电站(SONGS)附近的变电站的高压输电线路,主要利用该线路的现有通行权。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发