  • New Plan Indicates Reduced GHG Emissions, Improved Sustainability and Enhanced Expansion Potential

  • Move Supports Northern's Strategy to be a Competitive Supplier to Battery Anode Material ("BAM") Markets

  • 新计划表明减少温室气体排放,提高可持续性和增强扩张潜力

  • Move支持北方公司成为电池负极材料(“BAM”)市场有竞争力的供应商的战略

Ottawa, Ontario--(Newsfile Corp. - August 28, 2023) - Northern Graphite Corporation (TSXV: NGC) (OTCQB: NGPHF) (FSE: 0NG) (XSTU: 0NG) (the "Company" or "Northern) is pleased to announce the results of a new preliminary economic assessment ("PEA") that evaluated  moving the processing plant for its Namibian operations located at Okorusu to the Okanjande mine rather than rehabilitating the mill in its current location.

渥太华,安大略省-(Newsfile Corp.-2023年8月28日)-北方石墨公司(TSXV:NGC)(OTCQB:NGPHF)(FSE:0 NG)(XSTU:0 NG)(“公司“或”北部)欣然宣布新的初步经济评估结果(“豌豆“)将其位于Okorusu的纳米比亚业务的加工厂移至Okanjande矿,而不是将工厂恢复到目前的位置。

The PEA indicates that economics remain attractive under the new plan, with higher capital costs but lower operating costs. In addition, greenhouse gas ("GHG") emissions are reduced, sustainability is improved, and the expansion potential of the project is substantially enhanced.  

PEA表示,在新计划下,经济仍然具有吸引力,资本成本更高,但运营成本更低。此外,温室气体(“温室气体)减少排放,提高可持续性,项目的扩张潜力大幅增强。

The PEA, issued July 31, 2023, was prepared by CREO Engineering Solutions and confirms the viability of moving milling operations directly to the Okanjande mine site, which eliminates the cost of trucking mineralized material 70km to Okorusu. This allows for a more sustainable operation that also includes the use of solar power and lower water consumption.

2023年7月31日发布的PEA由CREO Engineering Solutions编制,确认了将磨矿作业直接转移到Okanjande矿场的可行性,从而消除了用卡车将矿化材料运输到Okorusu 70公里的成本。这允许更可持续的运营,还包括使用太阳能和更低的用水量。

"Moving the mill also provides room for potential future expansion from the perspective of both processing and tailings capacity, which is something we do not have at the current location," said Northern Chief Operating Officer Kirsty Liddicoat.  "The new approach also incorporates dry tailings into an integrated waste landform which means less water use and a more sustainable operation in support of the green transition," she added.

北方公司首席运营官基尔斯蒂·利迪科特表示:“从加工能力和尾矿产能的角度来看,搬迁工厂还为未来的潜在扩张提供了空间,这是我们目前所没有的。”她补充说:“新的方法还将干尾矿纳入综合废物地貌,这意味着更少的用水量和更可持续的运营,以支持绿色过渡。”

The Company is also looking at other ways to reduce its carbon footprint after the plant move, including the use of electric pit equipment and purchasing biofuel offsets on shipping concentrates from Namibia.  The Okanjande/Okorusu operation is currently on care and maintenance and the goal remains to restart production in late 2024, subject to financing.

该公司还在寻找其他方法来减少工厂搬迁后的碳足迹,包括使用电动矿坑设备,以及从纳米比亚运输精矿时购买生物燃料补偿。*Okanjande/Okorusu的运营目前正在进行维护和维护,目标仍然是在2024年底恢复生产,但需要融资。

The Okanjande graphite mine is a key catalyst in Northern's strategy to become an integrated and sustainable mine-to-battery company, supplying markets in North America and Europe as they embrace the energy transition and widescale electrification. Graphite from Okanjande will also supply traditional markets, from refractory bricks for steelmaking, to heat management in consumer electronics, to friction and lubrication products for the global automobile industry.

Okanjande石墨矿是Northern成为一家从矿山到电池的一体化和可持续发展公司战略的关键催化剂,向北美和欧洲市场供应能源过渡和大规模电气化。Okanjande的石墨还将供应传统市场,从炼钢用耐火砖到消费电子产品的热管理,再到全球汽车工业的摩擦和润滑产品。

"This PEA supports our strategy to develop Okanjande as a competitive asset that can be available to meet the demands of our customers in years to come," said Northern Chief Executive Officer Hugues Jacquemin. "Our new mining plan at Okanjande will allow us to move quickly to serve the fast-growing market for battery anode materials and increase our ability to expand the facilities over time."

北方公司首席执行官休格·雅克明说:“这项PEA支持我们的战略,即将Okanjande发展为一项具有竞争力的资产,可以在未来几年满足我们客户的需求。我们在Okanjande的新开采计划将使我们能够迅速采取行动,为快速增长的电池负极材料市场提供服务,并随着时间的推移提高我们扩大设施的能力。“

The Okanjande deposit hosts a weathered resource of 5.9Mt containing 248kt of graphite in the measured and indicated category and 0.5Mt of inferred resources containing 17kt graphite, a transitional resource of 1.2Mt containing 53kt of graphite in the measured and indicated categories and 0.1Mt of inferred resources containing 2kt of graphite (@2.6% TCG cut-off grade and $1,250/t graphite price for weathered and transitional) and a fresh rock resource of 24.2Mt containing 1.3Mt of graphite in the measured and indicated categories and 7.2Mt of inferred resources with 0.4Mt of contained graphite (@3.1%TGC cut-off grade and $1,250/t graphite price). The PEA is based on only processing 6.1MT of measured and indicated resources (.34Mt of contained graphite), producing an average of 31,000 tonnes per year of concentrate over a 10-year mine life.

Okanjande矿床的风化资源为5.9Mt,其中测量和指示类别的石墨为248kt,推断的资源为17kt的石墨,过渡性资源1.2公吨,含53千吨测量和指示类别的石墨,推断资源含2千吨石墨(含2.6%TCG界限品位,风化和过渡性石墨价格为每吨1,250美元),原岩资源24.2公吨,含有测量和指示类别的石墨1.3公吨,推断资源7.2公吨,含石墨0.4公吨(TGC界限品位@3.1%,石墨价格每吨1,250美元)。PEA的基础是仅处理6.1公吨的已测量和指示资源(.34公吨含石墨),在10年的矿山寿命内平均每年生产31,000吨精矿。

"The substantial measured and indicated hard rock resource at Okanjande, which is not yet closed off by drilling, presents a clear opportunity to substantially increase production in the future and the Company intends to complete additional work and prepare a new PEA with respect to an expansion scenario," said Ms. Liddicoat.

Liddicoat女士说:“Okanjande的大量已测量和指示的硬岩资源尚未被钻探关闭,这为未来大幅提高产量提供了一个明确的机会,公司打算完成额外的工作,并就扩张方案准备新的PEA。”

"The ability to add 31,000tpy of production at a very reasonable capital cost creates a compelling case for the development of Okanjande," said Mr. Jacquemin. "Okanjande has a very large resource located in one of the most politically stable countries in Africa, with easy access to a deep-water port which provides substantial competitive advantages over most other African projects."

“以非常合理的资本成本增加3.1万吨年产量的能力,为奥卡扬德的发展创造了一个令人信服的理由,”雅克明说。Okanjande拥有非常大的资源,位于非洲政治最稳定的国家之一,很容易到达深水港,与大多数其他非洲项目相比,这提供了实质性的竞争优势。


Unit Of
Measure
(UOM)

Updated PEA

Measured and Indicated Resource - Weathered



and Transitional

Mt, %TGC

2.54Mt @ 5.03% TGC

Measured and Indicated Resource - Fresh

Mt, %TGC

3.56Mt @ 5.44% TGC

Total Measured and Indicated tonnes

Tonnes

6,096,950

Before Tax / 8% discount rate



NPV

USD

120,396,195

IRR

%

46.5%

After Tax / 8% discount rate



NPV

USD

70,218,979

IRR

%

36%

Capital Expenditures (excl. Sustaining capital)

USD

34,250,368

Average annual concentrate production

Tonnes

31,315

C1 production costs

USD/tonne

666

Average grade

%

5.3%

Average recovery

%

92%

Graphite Flake price

USD/t TCG

1,550


单位
量测
(计量单位)

更新的PEA

经过测量和指示的资源--风化



和过渡期

MT,%TGC

2.54Mt@5.03%TGC

测量和指示的资源-新鲜

MT,%TGC

3.56Mt@5.44%TGC

测量公吨和指示公吨总数

公吨

6096,950

税前/8%的折扣率



净现值

美元

120,396,195

IRR

百分比

46.5%

税后/8%的折扣率



净现值

美元

70,218,979

IRR

百分比

36%

资本支出(不包括可持续资本)

美元

34,250,368

年均精矿产量

公吨

31,315

C1生产成本

美元/吨

666

平均年级

百分比

5.3%

平均回收率

百分比

百分之九十二

石墨片价格

美元/吨TCG

1,550

Mineral resources that are not mineral reserves do not have demonstrated economic viability. While the PEA does not include inferred resources, the PEA is preliminary in nature and there is no certainty that the results of the PEA will be realized.

不属于矿产储备的矿产资源没有显示出经济可行性。虽然PEA不包括推断的资源,但PEA是初步的,不确定PEA的结果是否会实现。

Technical Report and Qualified Persons

技术报告和合格人员

Northern has filed a technical report relating to the PEA. The technical report, entitled "Okanjande Graphite Project - Preliminary Economic Assessment Study Update Report" - is effective June 30, 2023, issued July 31, 2023, and has been prepared for Northern in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") by CREO Engineering Solutions (Namibia) with contributions from The MSA Group (South Africa) and certain other independent consultants, and is available on SEDAR () under Northern's issuer profile as well as the Company's website.

Northern已经提交了一份与PEA相关的技术报告。这份题为《Okanjande石墨项目-初步经济评估研究更新报告》的技术报告于2023年6月30日生效,于2023年7月31日发布,并已根据National Instrument 43-101为Northern编写-《矿产项目信息披露标准》(“NI 43-101由CREO Engineering Solutions(纳米比亚)、MSA Group(南非)和某些其他独立顾问提供,并可在SEDAR()上的Northern发行人简介下以及公司网站上获得。

CREO Engineering Solutions (Namibia) was responsible for the compilation of information and preparation of the overall PEA and the following Qualified Persons (as defined under NI 43-101), all of whom are independent of the Company, prepared or reviewed the preparation of the scientific and technical information in this press release regarding the Company's Okanjande Project with respect to their respective disciplines:

Creo Engineering Solutions(纳米比亚)负责信息的汇编和整个PEA的准备工作,以下合格人员(根据NI 43-101的定义)都是独立于公司的,他们准备或审查了本新闻稿中有关公司Okanjande项目的科学和技术信息的准备工作,涉及他们各自的学科:

  • Etienne Roux, B.Eng (Chem), SME Registered Member, Lead Consultant, CREO Engineering Solutions was responsible for the technical information pertaining to the Okanjande Report

  • Ipelo Golang Rebecca Gasela, Pr. Sci. Nat., MGSSA, Senior Mineral Resource Consultant, The MSA Group was responsible for the Okanjande Resource Estimate

  • Mark Mohring, PrEng MSAIMM, Consultant Mining Engineer, The MSA Group was responsible for the mining methods

  • Robert Barnett, Pr. Sci. Nat., FGSSA Consulting Geologist, Independent Consultant was responsible for the technical information and co-responsible for the mineral resource.

  • Etienne Roux,B.Eng(化学),中小企业注册会员,CREO工程解决方案首席顾问负责与Okanjande报告有关的技术信息

  • 作者Rebecca Gasela,Pr.SCI。、MGSSA,MSA集团高级矿产资源顾问负责Okanjande资源评估

  • 马克·莫林,Preng MSAIMM,MSA集团矿业工程师顾问负责采矿方法

  • 罗伯特·巴尼特,公关SCI。NAT,FGSSA咨询地质学家,独立顾问负责技术信息,共同负责矿产资源。

About Northern Graphite

关于北方石墨

Northern is a Canadian, TSX Venture Exchange listed company that is focused on becoming a world leader in producing natural graphite and upgrading it into high value products critical to the green economy including anode material for lithium-ion batteries/EVs, fuel cells and graphene, as well as advanced industrial technologies.

Northern是一家加拿大多伦多证券交易所创业板上市公司,专注于成为天然石墨生产的世界领先者,并将其升级为对绿色经济至关重要的高价值产品,包括锂离子电池/电动汽车的负极材料、燃料电池和石墨烯以及先进的工业技术。

Northern is the only significant graphite producing company in North America and will become the third largest producer outside of China when its Namibian operations come back online. The Company also has two large scale development projects, Bissett Creek in Ontario, and Okanjande in Namibia, that will be a source of continued production growth in the future.  All projects have "battery quality" graphite and are located close to infrastructure in politically stable jurisdictions.

Northern是北美唯一一家重要的石墨生产公司,当其纳米比亚业务恢复运营后,该公司将成为除中国之外的第三大石墨生产商。该公司还有两个大型开发项目,安大略省的Bissett Creek和纳米比亚的Okanjande,这两个项目将成为未来产量持续增长的来源。*所有项目都有“电池质量”的石墨,并位于政治稳定司法管辖区的基础设施附近。

For media inquiries contact
Pav Jordan, VP of Communications
Email:  pjordan@northerngraphite.com

对于媒体查询,请联系
巴夫·乔丹,通信副总裁
电子邮件:www.pjordan@northerngraph ite.com

For other inquiries contact
Guillaume Jacq, CFO
Telephone: (613) 271-2124
Email: info@northerngraphite.com

如有其他问题,请联系
纪尧姆·雅克,首席财务官
电话:(613)271-2124
电子邮件:info@northerngraph ite.com

For additional information

有关更多信息,请访问

Please visit the Company's website at , the Company's profile on , our Social Channels listed below or contact the Company at (613) 271-2124.

请访问公司网站,公司简介,我们的社交渠道下面列出或请致电(613)271-2124与公司联系。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发