share_log

Galway Metals Expands Clarence Stream's North Zone; New Drill Results Include 4.3 G/t Au Over 9.0m, 6.1 G/t Au Over 5.0m and 2.2 G/t Au Over 6.0m

Galway Metals Expands Clarence Stream's North Zone; New Drill Results Include 4.3 G/t Au Over 9.0m, 6.1 G/t Au Over 5.0m and 2.2 G/t Au Over 6.0m

戈爾韋金屬擴展克拉倫斯溪的北區;新的鑽探結果包括 4.3 克/噸金超過 9.0m,6.1 克/噸金超過 5.0 米和 2.2 克/噸金超過 6.0 米
Accesswire ·  2023/02/28 07:01

TORONTO, ON / ACCESSWIRE / February 28, 2023 / Galway Metals Inc. (TSXV:GWM); (OTCQB:GAYMF) (the "Company" or "Galway") is pleased to report new drill results from the North Zone of its high grade, multi-million-ounce Clarence Stream Gold Project in SW New Brunswick, Canada. The new results expand on known gold mineralization outside the North Zone's pit shell boundaries in two key areas. The pit shells were defined in the N.I. 43-101 Resource Update titled "Technical Report on the Clarence Stream Mineral Resource Project, New Brunswick, Canada" dated March 31, 2022, by SLR Consulting (Canada) Ltd. The new drill results intersected gold mineralization at shallow depths, ranging from just 16 metres to 112 metres below surface. The results show that gold mineralization is present outside the current resource model and pit limits of the three pits planned in the North Zone, which is currently the smallest of the three resource Zones at Clarence Stream. The new drill results are highlighted in Figure 1 and in Figure 2 below.

安大略省多倫多/ACCESSWIRE /2023 年 2 月 28 日/ 高威金屬公司(TSXV:GWM);(OTCQB:GAYMF)(“公司” 或 “高威”)欣然報告其位於加拿大新不倫瑞克省西南部的高品位、數百萬盎司的克拉倫斯溪黃金項目北區的新鑽探結果。新結果擴展了北區坑殼邊界以外的兩個關鍵區域的已知金礦化情況。坑殼是在SLR Consulting(加拿大)有限公司於2022年3月31日發佈的題爲 “加拿大新不倫瑞克省克拉倫斯溪礦產資源項目技術報告” 的N.I. 43-101資源更新中定義的。新的鑽探結果在地表以下僅16米至112米的淺層與金礦化相交。結果表明,金礦化存在於當前資源模型和計劃在北區開採的三個礦坑的礦坑範圍之外,北區目前是克拉倫斯溪三個資源區中最小的一個。下面的圖 1 和圖 2 中突出顯示了新的鑽孔結果。

Robert Hinchcliffe, President and CEO of Galway Metals, states: "All zones at Clarence Stream remain open for significant expansion. In addition to the North Zone, obvious expansion opportunities exist at the much larger SW Zone, its adjacent Triangle Area, the South Zone and at Oak Bay and Lily Hill. Beyond these, there are many undrilled coincident geochemical and geophysical targets on our district-scale property where we expect to make new discoveries, just as we have throughout our history at Clarence Stream. The current respective Indicated and Inferred Clarence Stream Mineral Resource already contains 0.92Moz at 2.3 g/t Au (within 12.4MT) plus 1.33Moz at 2.6 g/t Au (within 16.0MT). In the fullness of time, we believe it will become increasingly clear that Clarence Stream is one of the most important new gold districts in Eastern Canada."

高威金屬公司總裁兼首席執行官羅伯特·欣奇克利夫表示:”克拉倫斯溪的所有區域仍然開放,可以進行大規模擴張。除北區外,更大的西南區、鄰近的三角區、南區以及橡樹灣和莉莉山也存在明顯的擴張機會。除此之外,我們在區域規模的物業上還有許多未鑽探的同步地球化學和地球物理目標,我們希望在這些目標上發現新的發現,就像我們在克拉倫斯溪的歷史上一樣。目前相應的指示和推斷的克拉倫斯溪礦產資源已經含有0.92Moz(2.3 g/t Au)(在12.4萬噸以內),加上2.6克/噸金的1.33Moz(160萬噸以內)。我們相信,隨着時間的推移,克拉倫斯溪是加拿大東部最重要的新黃金區之一,這一點將變得越來越明顯。”

Summary of Drill Results:

鑽探結果摘要:

Extensions Between the North and Middle Pits

北坑和中坑之間的延伸部分

  • Hole GWM22CS-390: 4.3 g/t Au over 9.0m, including 57.3 g/t Au over 0.5m (Visible Gold - (VG)), starting at 35m from surface
  • Hole GWM22CS-378: 6.1 g/t Au over 5.0m, including 16.6 g/t Au over 1.0m, starting at 54m from surface is just on the edge of the resource
  • Hole GWM22CS-388: 12.4 g/t Au over 1.5m, including 32.4 g/t Au over 0.5m, starting at 43m from surface
  • Hole GWM22CS-391: 18.0 g/t Au over 0.5m (VG), starting at 35m from surface
  • Hole GWM22CS-387: 6.4 g/t Au over 1.1m (VG), starting at 74m from surface
  • Hole GWM22CS-382: 0.7 g/t Au over 11.5m, including 2.6 g/t Au over 0.7m, plus 0.8 g/t Au over 4.0m, starting at 88m and 112m, respectively, from surface
  • GWM22CS-390 洞: 9.0 米以上的金幣爲 4.3 g/t,包括距離地表 35 米以上的超過 0.5 米(Visible Gold-(VG))的 57.3 g/t Au
  • GWM22CS-378 洞: 6.1 g/t Au 超過 5.0 米,包括超過 1.0 米的 16.6 g/t Au,起點距離地表 54 米,就在資源的邊緣
  • GWM22CS-388 洞: 12.4 g/t Au 超過 1.5 米,包括超過 0.5 米的 32.4 g/t Au,從距離地表 43 米處開始
  • GWM22CS-391 洞: 0.5 米以上的金幣爲 18.0 g/t (VG),從距離地面 35 米處開始
  • GWM22CS-387 洞: 1.1 米以上的金幣爲 6.4 克/噸 (VG),從距離地面 74 米處開始
  • GWM22CS-382 洞: 11.5 米以上 0.7 g/t Au,包括距離地表 88 米和 112 米以上的超過 0.8 g/t Au,分別從 88 米和 112 米處開始

Extensions to the East of the SE Pit

SE Pit 以東的擴建部分

  • Hole GWM22CS-392: 2.2 g/t Au over 6.0m, including 8.1 g/t Au over 0.6m, plus 1.1 g/t Au over 3.6m, starting at 25m and 36m, respectively, from surface
  • Hole GWM22CS-386: 1.8 g/t Au over 6.0m, plus 1.7 g/t Au over 0.5m, starting at 25m and 58m, respectively, from surface
  • Hole GWM22CS-384: 1.4 g/t Au over 3.0m, including 3.1 g/t Au over 0.9m, starting at 16m from surface
  • GWM22CS-392 洞: 6.0 米以上 2.2 克/噸 Au,包括距離地表 25 米和 36 米以上的超過 0.6 米的 8.1 g/t Au,分別從地表 25 米和 36 米處開始
  • GWM22CS-386 洞: 1.8 g/t Au 超過 6.0 米,在距離地表 25 米和 58 米處分別加上 0.5 米以上的 1.7 g/t Au
  • GWM22CS-384 洞:3.0 米以上的 1.4 g/t Au,包括超過 0.9 米的 3.1 g/t Au,起點距離地表 16m

Figure 1: North Zone, Clarence Stream Gold Project Map and Drill Hole Locations

圖 1:北區、克拉倫斯溪黃金項目地圖和鑽孔位置

Detailed Discussion and Analysis:

詳細討論和分析:

Expansions Between the North Zone's North and Middle Pits

北區北部和中部礦坑之間的擴建工程

The North Zone resource is made up of 3 pits separated by gaps of 90 and 230m in width. The purpose of drilling between the North and Middle pits was to determine whether potential exists to combine them into one. The intercepts received are encouraging and additional drilling is now warranted in order to confirm if the pits could be combined.

北區資源由3個礦坑組成,礦坑之間由寬度分別爲90和230米的間隙隔開。在北部和中部礦坑之間鑽探的目的是確定是否有可能將它們合而爲一。收到的截獲令人鼓舞,現在有必要進行更多鑽探,以確認是否可以合併這些礦坑。

North Zone gold mineralization is characterized by flat dipping veins, dipping generally at shallow angles to the east but can vary locally. The intersections of 4.3 g/t Au over 9.0m, 12.4 g/t Au over 1.5m, and 18.0 g/t Au over 0.5m in holes 390, 388 and 391, respectively, are located in the 230m gap between the North and Middle Pit resource areas.

北區金礦化的特徵是沉積礦脈平坦,通常向東傾斜,但可能在局部有所不同。的十字路口 9.0 米以上 4.3 g/t Au,1.5 米以上 12.4 g/t Au,0.5 米以上 18.0 g/t Au 分別在390、388和391號洞中, 位於北部和中部礦坑資源區之間的 230 米間隙中

The intersection of 4.3 g/t Au over 9.0m in hole 390 is located 159 metres south of the closest hole in the resource from the northern-most (bowl-shaped) pit. It is located 68 metres NE of a previously reported intercept that contained 2.8 g/t Au over 14.0 metres, including 56.2 g/t Au over 0.6 metres (March 28, 2017), that is also not in the resource. The closest intersection in the Middle Pit resource in that area is 54 metres away. The intersection of 0.7 g/t Au over 1.0m in hole 389 is 36m downdip of the intercept in hole 390.

在 390 號洞中,4.3 g/t Au 在 9.0 米處的交點是 位於資源中最近的洞以南 159 米處 從最北端(碗狀)的坑裏出來。 它位於東北 68 米 之前報道的截獲內容包含 2.8 g/t Au 超過 14.0 米,包括 56.2 g/t Au 超過 0.6 米 (2017 年 3 月 28 日), 那也不在資源中。該區域 Middle Pit 資源中最近的交叉路口在 54 米外。在389號洞中,0.7 g/t Au在1.0米以上的交點是390洞中截距向下傾斜36米。

The intersection of 6.1 g/t Au over 5.0m in hole 378 is located just on the edge of the resource, 40 metres NW of a previously-reported intersection of 14.6 g/t Au over 10.2m (hole AD 17-127). The intersections in holes 379, 382, 380, and 381 in Table 1 are located 55m, 91m, 127m, and 218m downdip, respectively, of the intercept in hole 378.

的交叉點 6.1 g/t Au 超過 5.0 米 第 378 洞位於資源邊緣,位於先前報告的十字路口西北 40 米處 14.6 g/t Au 超過 10.2 米 (AD 17-127 號洞)。表 1 中 379、382、380 和 381 號孔的交叉點分別位於第 378 孔截距的 55 米、91 米、127 米和 218m 的下傾角。

The intersection of 6.4 g/t Au over 1.1m in hole 387 is located 113 metres NE from the 4.3 g/t Au over 9.0m in hole 390, and both of these are outside the current resource area. Hole 385, which did not return significant values, is 115m downdip of the intercept in hole 387.

的交叉點 1.1 米以上的金幣爲 6.4 克/噸 在洞裏 387位於 390 號洞 9.0 米處 4.3 g/t Au 向東 113 米, 而且這兩個都不在當前的資源區域之內。未返回有效值的385洞位於387洞中截距向下傾115米。

Expansions to the NE of the North Zone's Southeast Pit

向北區東南坑東北部的擴建工程

The intersection of 2.2 g/t Au over 6.0m, including 8.1 g/t Au over 0.6m in hole 392, constitutes the furthest northeast intersection to date for the North Zone resource area. It is 271m NE of the closest hole in the resource, extending well beyond the SE-most pit. This intersection is also 108m down-dip to the NNW of an intersection of 0.5 g/t Au over 4.75m that is also not in the resource. The North Zone is interpreted to dip NW in this area. A second mineralized zone also exists in hole 392, returning 1.1 g/t Au over 3.6m.

的交叉點 2.2 克/噸 Au 超過 6.0 米, 包括392號洞中超過0.6米的8.1克/噸金礦,構成了迄今爲止北區資源區最遠的東北交叉點。它是 資源中最近的洞的東北 271 米,遠遠超出了 Se-most 的礦坑。這個十字路口也向下傾斜了 108 米,與 0.5 交叉路口的西北偏北g/t Au 超過 475 萬,資源中也沒有。北區被解釋爲向西北傾斜。第 392 號洞中也存在第二個礦化帶,在 3.6 米處返回 1.1 g/t Au。

The intersections of 1.8 g/t Au over 6.0m in hole 386 and 1.4 g/t Au over 3.0m in hole 384 are located 75m and 161m NE, respectively, of the resource envelope. Holes 383 and 377, which did not return significant values, were drilled 43m SW and 53m NE, respectively, from the 1.8 g/t Au over 6.0m and appear to be out of the plunge of the mineralization.

的十字路口 1.8 g/t Au 超過 6.0 米 在 386 號洞和在 384 號洞中,超過 3.0 米的 1.4 g/t 金分別位於資源包絡的東北 75 米和 161 米處。未返回顯著值的383號和377號孔分別從超過6.0米的1.8克/噸金礦中鑽出西南43米和東北53米,似乎已經脫離了礦化區的暴跌。

Six wildcat exploration holes were drilled NW (generally 700m from the north boundary of the resource) and 5 were drilled SE (~600m) of the North Zone, and 8 holes were drilled on the up-dip of the zone near where it comes to surface. Only low gold values less than 0.25 g/t were intersected to the NW; it is thought the holes are too far west or may have been drilled parallel to any possible mineralization due to folding. To the SE, 4 intersections of 0.4 and 0.5 g/t were returned. Follow-up drilling is warranted. The up-dip holes were mainly just past where the zone hits surface, but 2 holes had intersections - as high as 1.8 g/t Au over 3.9m.

在西北鑽了六個野貓勘探洞(通常距離資源的北部邊界700米),在北區的東南(約600米)鑽了5個洞,在該區域浮出水面的上傾角處鑽了8個洞。只有低於0.25 g/t的低金值才與西北相交;人們認爲這些洞向西太遠,或者可能與摺疊導致的任何可能的礦化作用平行地鑽探。向東南方向返回了 4 個 0.4 和 0.5 g/t 的交叉點。後續鑽探是有道理的。上傾孔主要剛好超過該區域撞擊地表的位置,但有2個洞有交叉點——在3.9米處高達1.8 g/t Au。

Figure 2: North Zone, Clarence Stream Gold Project Map with Gold-in-Soil Anomalies

圖 2:北區,克拉倫斯溪黃金項目地圖,其中包含土壤中的金異常

Table 1. Assay Results

表 1。化驗結果

Hole ID

From

(m)

To

(m)

Intercept

(m)

TW

(m)

Au

g/t

AD17-127

56.80

67.00

10.20

8.80

**14.6

incl.

56.80

57.80

1.00

0.90

**31.7

incl.

57.80

58.90

1.00

0.90

**37.3

incl.

66.00

67.00

1.00

0.90

**36.1

AD17-136

24.00

28.75

4.75

0.5

incl.

27.55

28.15

0.60

1.2

GWM22CS-378

78.00

83.00

5.00

6.1

incl.

78.00

79.00

1.00

16.6

GWM22CS-379

85.50

86.00

0.50

1.2

93.00

94.00

1.00

0.6

97.00

97.80

0.80

0.5

106.00

107.00

1.00

0.5

110.00

111.00

1.00

0.8

GWM22CS-380

84.50

85.00

0.50

0.5

91.00

92.00

1.00

0.4

GWM22CS-381

114.50

115.00

0.50

1.3

126.50

127.00

0.50

0.4

128.00

129.50

1.50

1.0

161.40

162.00

0.60

0.5

167.50

168.00

0.50

0.4

180.50

183.00

2.50

1.3

GWM22CS-382

97.50

109.00

11.50

0.7

incl.

103.00

103.50

0.50

1.5

incl.

106.50

107.20

0.70

2.6

124.50

128.50

4.00

0.8

GWM22CS-384

19.00

20.00

1.00

0.8

22.90

25.90

3.00

1.4

incl.

25.00

25.90

0.90

3.1

GWM22CS-386

36.00

42.00

6.00

1.8

incl.

39.50

40.00

0.50

4.6

82.50

83.00

0.50

1.7

GWM22CS-387

103.50

104.60

1.10

6.4 V.G.

122.50

123.00

0.50

0.6

GWM22CS-388

31.00

32.00

1.00

0.8

42.00

43.50

1.50

12.4

incl.

42.50

43.00

0.50

32.4

GWM22CS-389

77.00

78.00

1.00

0.7

GWM22CS-390

39.50

54.00

9.00

4.3 V.G.

incl.

53.50

54.00

0.50

57.3

GWM22CS-391

48.80

49.30

0.50

18.0 V.G.

49.80

51.00

1.20

0.4

GWM22CS-392

35.00

41.00

6.00

2.2

incl.

38.65

39.25

0.60

8.1

incl.

39.25

40.00

0.75

4.6

50.40

54.00

3.60

1.1

GWM21CB-10

7.85

10.00

2.15

0.8

GWM21CB-13

23.00

24.00

1.00

0.4

GWM21CB-14

31.10

35.00

3.90

1.8

incl.

33.95

35.00

1.05

4.7

GWM19TS-02

143.80

144.30

0.50

0.5

GWM19TS-04

83.05

83.80

0.75

0.5

GWM19TS-05

61.10

61.95

0.85

0.4

99.75

100.25

0.50

0.4

Hole ID

來自

(m)

(m)

攔截

(m)

TW

(m)

Au

g/t

AD17-127

56.80

67.00

10.20

8.80

**14.6

包括。

56.80

57.80

1.00

0.90

**31.7

包括。

57.80

58.90

1.00

0.90

**37.3

包括。

66.00

67.00

1.00

0.90

**36.1

AD17-136

24.00

28.75

4.75

0.5

包括。

27.55

28.15

0.60

1.2

GWM22CS-378

78.00

83.00

5.00

6.1

包括。

78.00

79.00

1.00

16.6

GWM22CS-379

85.50

86.00

0.50

1.2

93.00

94.00

1.00

0.6

97.00

97.80

0.80

0.5

106.00

107.00

1.00

0.5

110.00

111.00

1.00

0.8

GWM22CS-380

84.50

85.00

0.50

0.5

91.00

92.00

1.00

0.4

GWM22CS-381

114.50

115.00

0.50

1.3

126.50

127.00

0.50

0.4

128.00

129.50

1.50

1.0

161.40

162.00

0.60

0.5

167.50

168.00

0.50

0.4

180.50

183.00

2.50

1.3

GWM22CS-382

97.50

109.00

11.50

0.7

包括。

103.00

103.50

0.50

1.5

包括。

106.50

107.20

0.70

2.6

124.50

128.50

4.00

0.8

GWM22CS-384

19.00

20.00

1.00

0.8

22.90

25.90

3.00

1.4

包括。

25.00

25.90

0.90

3.1

GWM22CS-386

36.00

42.00

6.00

1.8

包括。

39.50

40.00

0.50

4.6

82.50

83.00

0.50

1.7

GWM22CS-387

103.50

104.60

1.10

6.4 V.G.

122.50

123.00

0.50

0.6

GWM22CS-388

31.00

32.00

1.00

0.8

42.00

43.50

1.50

12.4

包括。

42.50

43.00

0.50

32.4

GWM22CS-389

77.00

78.00

1.00

0.7

GWM22CS-390

39.50

54.00

9.00

4.3 V.G.

包括。

53.50

54.00

0.50

57.3

GWM22CS-391

48.80

49.30

0.50

18.0 V.G.

49.80

51.00

1.20

0.4

GWM22CS-392

35.00

41.00

6.00

2.2

包括。

38.65

39.25

0.60

8.1

包括。

39.25

40.00

0.75

4.6

50.40

54.00

3.60

1.1

GWM21CB-10

7.85

10.00

2.15

0.8

GWM21CB-13

23.00

24.00

1.00

0.4

GWM21CB-14

31.10

35.00

3.90

1.8

包括。

33.95

35.00

1.05

4.7

GWM19TS-02

143.80

144.30

0.50

0.5

GWM19TS-04

83.05

83.80

0.75

0.5

GWM19TS-05

61.10

61.95

0.85

0.4

99.75

100.25

0.50

0.4

** previously reported; used 0.38 g/t Au for the bottom cut-off as per pit constrained for all new results; 0.42 g/t Au was used for previously-released pit constrained results. (TW=True Widths, which are calculated - sectional measuring may give slightly different numbers); True widths are unknown if not noted; VG=Visible Gold; Drill holes CS-377, 383, 385, and CB-01-09, 11-12, and TS-01, 03 did not produce significant assays.

** 此前已報告;根據所有新結果,使用0.38 g/t Au作爲底部臨界值;先前發佈的礦坑限制結果使用0.42 g/t Au。(tw=True Widths,這是計算得出的——截面測量可能給出的數字略有不同);如果未註明,則真實寬度未知;vg=Visible Gold;鑽孔 CS-377、383、385 和 CB-01-09、11-12 和 TS-01、03 沒有產生顯著的檢測結果。

Table 2: Drill Hole Coordinates

表 2:鑽孔座標

Hole ID Easting Northing Elevation (m) Azimuth Dip Final Depth

AD 17-127

655847

5025827

113

143

-45

156

AD 17-136

656775

5026189

113

145

-45

171

GWM22CS-377

656728

5026027

149

125

-45

150

GWM22CS-378

655840

5025870

116.3

170

-45

140

GWM22CS-379

655840

5025870

116.3

120

-65

150

GWM22CS-380

655935

5025898

113

142

-55

351

GWM22CS-381

655935

5025898

113

100

-55

201

GWM22CS-382

655935

5025898

113

200

-65

189

GWM22CS-383

656691

5025994

113

153

-45

150

GWM22CS-384

656715

5026115

153

120

-45

150

GWM22CS-385

655935

5026042

113

320

-45

201

GWM22CS-386

656665

5026140

154

120

-45

150

GWM22CS-387

655727

5026131

116

142

-45

198

GWM22CS-388

655730

5025965

113

n/a

-90

186

GWM22CS-389

655730

5025965

113

95

-45

167

GWM22CS-390

655730

5025965

113

95

-62

165

GWM22CS-391

655730

5025965

113

250

-45

168

GWM22CS-392

656686

5026240

113

120

-45

180

WILDCAT HOLES

GWMCB-01

654258

5026117

137

340

-45

387.0

GWMCB-02

654339

5026003

135

20

-45

183.0

GWMCB-03

654225

5026244

137

300

-45

359.0

GWMCB-04

654383

5026273

134

330

-45

297.3

GWMCB-05

654383

5026273

134

150

-45

401.0

GWMCB-06

655019

5026632

117

150

-45

392.6

GWMCB-07

655473

5025972

109

360

-90

123.0

GWMCB-08

655474

5025970

109

150

-45

125.0

GWMCB-09

655305

5025931

115

150

-45

107.0

GWMCB-10

655304

5025932

115

360

-90

155.0

GWMCB-11

655198

5025971

118

360

-90

77.0

GWMCB-12

655199

5025970

119

150

-45

101.0

GWMCB-13

655163

5026042

116

360

-90

83.0

GWMCB-14

655144

5026128

115

330

-45

101.0

GWMTS-01

656923

5025268

123

25

-45

243.0

GWMTS-02

656985

5025370

130

200

-45

234.0

GWMTS-03

657062

5025329

132

160

-45

213.0

GWMTS-04

657192

5025276

134

195

-45

99.0

GWMTS-05

657197

5025279

134

195

-45

279.0

Hole ID 向東 北方 海拔 (m) Azimuth 最終深度

AD 17-127

655847

5025827

113

143

-45

156

廣告 17-136

656775

5026189

113

145

-45

171

GWM22CS-377

656728

5026027

149

125

-45

150

GWM22CS-378

655840

5025870

116.3

170

-45

140

GWM22CS-379

655840

5025870

116.3

120

-65

150

GWM22CS-380

655935

5025898

113

142

-55

351

GWM22CS-381

655935

5025898

113

100

-55

201

GWM22CS-382

655935

5025898

113

200

-65

189

GWM22CS-383

656691

5025994

113

153

-45

150

GWM22CS-384

656715

5026115

153

120

-45

150

GWM22CS-385

655935

5026042

113

320

-45

201

GWM22CS-386

656665

5026140

154

120

-45

150

GWM22CS-387

655727

5026131

116

142

-45

198

GWM22CS-388

655730

5025965

113

不適用

-90

186

GWM22CS-389

655730

5025965

113

95

-45

167

GWM22CS-390

655730

5025965

113

95

-62

165

GWM22CS-391

655730

5025965

113

250

-45

168

GWM22CS-392

656686

5026240

113

120

-45

180

野貓洞

GWMCB-01

654258

5026117

137

340

-45

387.0

GWMCB-02

654339

5026003

135

20

-45

183.0

GWMCB-03

654225

5026244

137

300

-45

359.0

GWMCB-04

654383

5026273

134

330

-45

297.3

GWMCB-05

654383

5026273

134

150

-45

401.0

GWMCB-06

655019

5026632

117

150

-45

392.6

GWMCB-07

655473

5025972

109

360

-90

123.0

GWMCB-08

655474

5025970

109

150

-45

125.0

GWMCB-09

655305

5025931

115

150

-45

107.0

GWMCB-10

655304

5025932

115

360

-90

155.0

GWMCB-11

655198

5025971

118

360

-90

77.0

GWMCB-12

655199

5025970

119

150

-45

101.0

GWMCB-13

655163

5026042

116

360

-90

83.0

GWMCB-14

655144

5026128

115

330

-45

101.0

GWMTS-01

656923

5025268

123

25

-45

243.0

GWMTS-02

656985

5025370

130

200

-45

234.0

GWMTS-03

657062

5025329

132

160

-45

213.0

GWMTS-04

657192

5025276

134

195

-45

99.0

GWMTS-05

657197

5025279

134

195

-45

279.0

New Brunswick Junior Mining Assistance Program

新不倫瑞克省青少年採礦援助計劃

Galway would like to acknowledge financial support from the New Brunswick Junior Mining Assistance Program, which partially funded drilling of the SW Deposit.

高威想感謝新不倫瑞克省青少年採礦援助計劃的財政支持,該計劃爲西南礦牀的鑽探提供了部分資金。

Clarence Stream Geology and Mineralization

克拉倫斯溪地質與礦化

Clarence Stream deposits can be characterized as intrusion-related, quartz-vein hosted gold deposits. They contain elevated levels of bismuth and arsenopyrite in multiple quartz veins, with significant antimony in the South and North Zones and tungsten in the vicinity. The Zones contain multiple zones of quartz veining with sulfides and sericite alteration. In general, mineralization at Clarence Stream consists of 10-70% quartz stockworks and veins with 1-5% fine pyrite plus pyrrhotite plus arsenopyrite in sericite altered sediments. The South and North Zones also contain stibnite. Locally there is up to 10% sphalerite and semi-massive galena veinlets. The 3.1 km trend that hosts the SW Deposit is associated with a mineralized mafic intrusive locally - similar to the South Zone. A more complete description of Clarence Stream's geology and mineralization can be found at .

克拉倫斯溪礦牀可以說是與侵入有關的、以石英脈爲主的金礦牀。它們在多個石英礦脈中含有較高的鉍和砷黃鐵礦含量,在南區和北區有大量銻,附近有鎢。這些區域包含多個帶有硫化物和蠶絲巖蝕變的石英脈狀區域。一般而言,克拉倫斯溪的礦化由 10-70% 的石英岩塊和礦脈組成,其中 1-5% 的細黃鐵礦加黃鐵礦加黃鐵礦加黃鐵礦,再加上雲母蝕變沉積物中的砷黃鐵礦。南部和北部區域還包含尖晶石。當地有高達 10% 的閃鋅礦和半塊狀方鉛礦脈。西南礦牀所在的3.1公里趨勢與當地的礦化鎂質侵入有關,類似於南區。有關克拉倫斯溪地質和礦化的更完整描述可在以下網址找到。

Review by Qualified Person, Quality Control and Reports - Clarence Stream

合格人員審查、質量控制和報告-Clarence Stream

The Mineral Resource estimates for the North and South Zones were prepared by Mr. Reno Pressacco, P.Geo, SLR Principal Geologist. The Mineral Resource estimate for the Southwest Deposit was prepared under the supervision of Ms. Valerie Wilson, M.Sc., P.Geo., SLR Managing Principal Geologist. Mr. Pressacco and Ms. Wilson are Independent Qualified Persons as defined by NI 43-101 and have read and approved the scientific and technical content of this news release as it relates to the updated Mineral Resource estimates. Michael Sutton, P.Geo., Director and VP of Exploration for Galway Metals, is the Qualified Person who supervised the preparation of the scientific and technical disclosure of the Clarence Stream portion of this news release on behalf of Galway Metals Inc. All core, chip/boulder samples, and soil samples are assayed by Activation Laboratories, located at 41 Bittern Street, Ancaster, Ontario, Canada, Agat Laboratories, located at 5623 McAdam Road, Mississauga Ontario, Canada L4Z 1N9 and 35 General Aviation Road, Timmins, ON P4P 7C3, and/or Swastika Laboratories situated in Swastika, ON. All four labs have ISO/IEC 17025 accreditation. All core is under watch from the drill site to the core processing facility. All samples are assayed for gold by Fire Assay, with gravimetric finish, and other elements assayed using ICP. The Company's QA/QC program includes the regular insertion of blanks and standards into the sample shipments, as well as instructions for duplication. Standards, blanks and duplicates are inserted at one per 20 samples. Approximately five percent (5%) of the pulps and rejects are sent for check assaying at a second lab with the results averaged and intersections updated when received. Core recovery in the mineralized zones has averaged 99%.

北區和南區的礦產資源估算是由SLR首席地質學家P.Geo的Reno Pressacco先生編制的。西南礦牀的礦產資源估算是在SLR管理首席地質學家瓦萊麗·威爾遜女士(理學碩士、P.Geo.)的監督下編制的。普雷薩科先生和威爾遜女士是NI 43-101定義的獨立合格人士,他們已閱讀並批准了本新聞稿中與最新礦產資源估算相關的科學和技術內容。高威金屬勘探總監兼副總裁邁克爾·薩頓是代表高威金屬公司監督本新聞稿克拉倫斯溪部分科學和技術披露準備工作的合格人士。所有核心、芯片/巨石樣本和土壤樣本均由位於加拿大安大略省安卡斯特比特恩街 41 號 Agat Laboratories 的 Agat Laboratories 進行檢測加拿大安大略省密西沙加路 L4Z 1N9 和 35 通用航空路,安大略省蒂明斯 P4P 7C3 和/或 Swastika Laboratories位於安大略省的斯瓦斯蒂卡。所有四個實驗室都獲得了 ISO/IEC 17025 認證。從鑽探現場到岩心處理設施,所有岩心都處於監視之下。所有樣品均通過Fire Assay進行金質檢測,採用重量法檢測,其他元素則使用ICP進行檢測。該公司的質量保證/質量控制計劃包括定期在樣品中插入空白和標準,以及重複說明。每20個樣本插入一個標準、空白和副本。大約百分之五(5%)的紙漿和廢品被送到第二個實驗室進行檢查化驗,結果平均值並在收到後更新交叉點。礦化區的核心回收率平均爲99%。

About the Company

關於本公司

Galway Metals is focused on creating significant per share value through the exploration and sustainable development of its two 100%-owned projects in Canada. Galway's flagship, Clarence Stream, is one of the most important gold districts in Atlantic Canada as it hosts a large, high-grade gold resource in SW New Brunswick. Also important is Estrades, the former-producing, high-grade, gold- and zinc-rich polymetallic VMS mine in the northern Abitibi of western Quebec as it hosts significant resources in the middle of a major 10-million-ounce gold camp, based on production, reserves and resources. Galway's activities will be conducted while respecting the environment and communities in which it operates. Galway is well capitalized. The Company began trading on January 4, 2013, after its successful spinout to existing shareholders from Galway Resources following the completion of the US$340 million sale of that company. With substantially the same management team and Board of Directors, Galway Metals is keenly intent on creating similar value as it had with Galway Resources.

Galway Metals致力於通過勘探和可持續發展其在加拿大的兩個100%持股的項目來創造可觀的每股價值。高威的旗艦克拉倫斯溪是加拿大大西洋地區最重要的黃金區之一,因爲它在新不倫瑞克省西南部擁有大量的高品位黃金資源。同樣重要的是Estrades,這是位於魁北克西部阿比提比北部的前產量、高品位、富含金和鋅的多金屬礦山VMS礦,因爲該礦位於一個以生產、儲量和資源爲基礎的大型1000萬盎司金礦中部,擁有大量資源。高威的活動將在尊重其運營所在的環境和社區的前提下進行。高威資本充足。該公司於2013年1月4日開始交易,此前該公司在完成對高威資源公司的3.4億美元出售後,成功將其分拆給現有股東。由於管理團隊和董事會基本相同,高威金屬熱切地致力於創造與高威資源公司相似的價值。

Should you have any questions and for further information, please contact (toll free):

如果您有任何疑問或想了解更多信息,請聯繫(免費電話):

Galway Metals Inc.
Robert Hinchcliffe
President & Chief Executive Officer
1-800-771-0680

高威金屬公司
羅伯特·欣奇克利夫
總裁兼首席執行官
1-800-771-0680

Website:

網站:

Email: info@galwaymetalsinc.com

電子郵件:info@galwaymetalsinc.com

Look us up on Facebook, Twitter or LinkedIn

在臉書、推特或領英上關注我們

CAUTIONARY STATEMENT: Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

警示聲明:多倫多證券交易所風險交易所及其監管服務提供商(該術語在多倫多證券交易所風險交易所的政策中定義)均不對本新聞稿的充分性承擔責任。證券交易所、證券委員會或其他監管機構均未批准或不批准此處包含的信息。

This news release contains forward-looking information, which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes statements made herein with respect to, among other things, the Company's objectives, goals or future plans, potential corporate and/or property acquisitions, exploration results, potential mineralization, exploration and mine development plans, timing of the commencement of operations, and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, exploration results being less favourable than anticipated, capital and operating costs varying significantly from estimates, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, risks associated with the defence of legal proceedings and other risks involved in the mineral exploration and development industry, as well as those risks set out in the Company's public disclosure documents filed on SEDAR. Although the Company believes that management's assumptions used to develop the forward-looking information in this news release are reasonable, including that, among other things, the Company will be able to identify and execute on opportunities to acquire mineral properties, exploration results will be consistent with management's expectations, financing will be available to the Company on favourable terms when required, commodity prices and foreign exchange rates will remain relatively stable, and the Company will be successful in the outcome of legal proceedings, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information contained herein, whether as a result of new information, future events or otherwise, except as required by applicable securities laws.

本新聞稿包含前瞻性信息,這些信息不包含歷史事實。前瞻性信息涉及風險、不確定性和其他因素,這些因素可能導致實際事件、結果、業績、前景和機會與此類前瞻性信息所表達或暗示的存在重大差異。本新聞稿中的前瞻性信息包括此處就公司的目標、目標或未來計劃、潛在的公司和/或財產收購、勘探結果、潛在的礦化、勘探和礦山開發計劃、開始運營的時間以及市場狀況估計等內容所做的陳述。可能導致實際結果與此類前瞻性信息存在重大差異的因素包括但不限於勘探結果不如預期、資本和運營成本與估計值相差很大、延遲獲得或未能獲得所需的政府、環境或其他項目批准、政治風險、與未來所需融資的可用性和成本相關的不確定性、股票市場的變化、通貨膨脹、匯率變化、大宗商品價格的波動,項目開發的延遲、與法律訴訟辯護相關的風險以及礦產勘探和開發行業涉及的其他風險,以及公司在SEDAR上提交的公開披露文件中列出的風險。儘管公司認爲管理層用於開發本新聞稿中前瞻性信息的假設是合理的,包括除其他外,公司將能夠發現並抓住收購礦產的機會,但勘探結果將符合管理層的預期,公司將在需要時以優惠條件獲得融資,大宗商品價格和外匯匯率將保持相對穩定,公司將成功獲得法律結果訴訟,不應過分依賴此類信息,這些信息僅適用於本新聞稿發佈之日,並且無法保證此類事件將在披露的時間範圍內發生,或者根本無法保證。除非適用的證券法另有要求,否則公司不打算或沒有義務更新或修改此處包含的任何前瞻性信息,無論是由於新信息、未來事件還是其他原因。

SOURCE: Galway Metals Inc.

來源: 高威金屬公司


View source version on accesswire.com:
在 accesswire.com 上查看源代碼版本:

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論