COQUITLAM, BC / ACCESSWIRE / February 15, 2023 / Fuse Battery Metals Inc. ("the Company "or "Fuse") (TSXV:FUSE)(OTCQB:FUSEF)(FRA:43W3) is pleased to announce the expansion of our exploration land holdings with the inclusion of a new lithium exploration project in Nevada, the Lithium Springs Project.
The Company has entered into a Purchase and Sale Agreement dated February 14, 2023, to acquire a 100% interest in 108 placer claims (BRD1 - BRD108) from Malcolm J. Bell (the "Vendor"). The claims cover approximately 858 hectares of playa and alluvial fan located at the south end of the Black Rock Desert outside of the hamlet of Gerlach in Washoe County, Nevada, known as the Lithium Springs Property (the "Transaction").
Terms of the Transaction:
- The Company agrees to the following:
- (a) reimburse the staking and recording costs to the Vendor in the amount of US$33,982 upon signing the Agreement; and
- (b) issuing to the Vendor 500,000 fully paid and non-assessable common shares in the capital of the Company upon TSX Venture Exchange acceptance of the Transaction.
All securities issued in connection with the Transaction are subject to a four month and a day hold period in accordance with Canadian Securities Laws.
About the Lithium Springs Property
The project is located at the southern end of Black Rock Desert, Nevada, about 132 air-line km north-northeast of Reno, Nevada in Sections 1, 2, 11, and 12 Township 32 North, Range 23. The center of the property is about 40.676° North Latitude, 119.331° West Longitude, (40° 40' 33" N, 119° 19' 52"): UTM X 302,900 UTMY 4,505,400 NAD 27; Zone 11 N.
Black Rock Desert basin is about 110 km long and up to 25 km wide at the widest point. The central playa measures about 50 km northeast - southwest and 10 km southeast - northwest. The western arm of the Black Rock Desert covers an area of about 2,000 square kilometers and contains 5 of the 30 currently listed Known Geothermal Resource Areas in Nevada.
The property covers an area of playa underlain by a moderately deep basin interpreted from gravity and seismic surveys indicating a maximum thickness of valley-fill deposits of about 1,200 m/ 3,600 ft. A high salt content prevents any significant vegetation from growing on the playa surface. Locally, the basin is being fed in part by boiling springs and siliceous sinter containing strongly anomalous Lithium values (up to 3.5 ppm) that flank the property on the west side. (U.S. GEOLOGICAL SURVEY Open-File Report 81-918.) While these lithium values are well below those of producing lithium bines, they do represent a significant source of metal available for evaporative concentration within the playa basin.
Past Exploration Work and Proposed Exploration Plan
Prior work completed on this property included a grid soil sampling program in 2016 where samples were collected on 200-meter intervals on lines spaced 400 meters apart for a total of 170 sites. Values ranged from 82.8 to 520 ppm lithium with a median value of 182 ppm. These values are significantly above the background in the adjoining ranges and indicate concentration of lithium in the playa silts and salt crust. Following the completion of this work, a shallow sampling program was completed followed by high resolution geophysical program to define potential drill targets.
The local geologic setting combined with the presence of lithium in both active geothermal fluids and surface salts within the Black Rock Desert property position match characteristics of lithium brine deposits at Clayton Valley, Nevada and in South America. The nearby geothermal fluids draining into the claims contain lithium in the 3 to 5 mg per liter range and most likely contributed to surface sampling values up to 520 ppm lithium. These preliminary results warrant continued exploration for a Clayton Valley type brine and/or clay deposit.
A reasonable expectation for a First Phase exploration program by the Company would be to re-sample the area, complete a geophysical survey and undertake a phased exploration program of surface sampling, auger or push drill water sampling, and geophysical work to choose drill sites for an initial drill test of the property. A subsequent Phase two exploration program could involve additional surface and sub-surface sampling and test drilling the property for lithium bearing brine and/or lithium bearing clay deposits.
Mr. Tim Fernback, Fuse Interim President & CEO comments "The Black Rock Desert holds substantial lithium exploration potential due to the proximity of geothermal activity in the immediate area. It is the Company's intention to rapidly evaluate the lithium brine and lithium clay potential of this well-located property. Fuse is in the process of completing the initial NI #43-101 Technical Report on the property."
Qualified Person as Defined Under National Instrument 43-101
Alan J. Morris, CPG of Spring Creek, Nevada, a Qualified Person as defined under Nation Instrument 43-101 has reviewed and approved the technical aspects of this news release.
About Fuse Battery Metals Inc.
Fuse Battery Metals Inc. is a Canadian based exploration company that trades under the symbol FUSE on the TSX Venture Exchange. The Company's focus is on exploration for high value metals required for the manufacturing of batteries.
Ontario Cobalt Properties
Fuse owns a 100% interest its Glencore Bucke Property, situated in Bucke Township, 6 km east-northeast of Cobalt, Ontario, subject to a back-in provision, production royalty and off-take agreement. The Glencore Bucke Property consists of 16.2 hectares and sits along the west boundary of Fuse's Teledyne Cobalt Project. The Company also owns a 100% interest, subject to a royalty, in the Teledyne Project located near Cobalt, Ontario. The Teledyne Property adjoins the south and west boundaries of claims that hosted the Agnico Mine.
Glencore Bucke/Teledyne Property
Situated in Bucke Township, 6 km east-northeast of Cobalt, Ontario the Glencore Bucke Property adjoins, on its northeast corner, the former cobalt producing Agaunico Mine. From 1905 through to 1961, the Agaunico Mine produced a total of 4,350,000 lbs. of cobalt ("Co"), and 980,000 oz of silver ("Ag") (Cunningham-Dunlop, 1979). The amount of cobalt produced from the Agaunico Mine is greater than that of any other mine in the Cobalt Mining Camp. Production ceased in 1961 due to depressed Co prices and over-supply (Thomson, 1964). The Glencore property is 100% owned by Fuse Battery subject to a back-in provision, production royalty and off-take agreement.
The associated Teledyne Property, located in Bucke and Lorrain Townships, consists of five patented mining claims totaling 79.1 ha, and 46 unpatented mining claim cells totaling approximately 700 ha. The Property is easily accessible by highway 567 and a well-maintained secondary road.
Cumulatively, over $25 million has been spent on exploration thus far, (2020 dollars inflation-adjusted) on the Teledyne Property resulting in valuable infrastructure including a development ramp and a modern decline going down 500 ft parallel to the main cobalt mineralized vein. The Teledyne Property is subject to a production royalty in favor of New Found Gold and an off-take agreement in favor of Glencore Canada Corp., while the Glencore Bucke Property is subject to a back-in provision, production royalty, and an off-take agreement in favor of Glencore Canada Corp. Glencore PLC is the world's largest producer of cobalt. A sizable portion of the cobalt produced at the Agaunico Mine was located along structures (Vein #15) that extended southward towards the northern boundary of the Teledyne Cobalt Property, currently 100% owned by FUSE. Mineralization was located within 125 ft (38.1 m) above the Huronian/Archean unconformity. Stoping widths of up to 50 ft (15.2 m) were not unusual at the Agaunico Mine (Cunningham-Dunlop, 1979).
On Behalf of the Board of Directors
"Tim Fernback"
Tim Fernback, Interim President & CEO
Contact Information:
Email: info@fusecobalt.com
Phone: 236-521-0207
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements which include, but are not limited to, comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward-looking statements.
SOURCE: Fuse Battery Metals Inc
View source version on accesswire.com:
ブリティッシュコロンビア州高貴林/ACCESSWIRE/2023年2月15日/ヒューズ電池金属会社(“会社”や“引き金”)(TSXV:FUSE)(OTCQB:FUSEF)(FRA:43 W 3)ネバダ州の新しいリチウム探査プロジェクト、すなわちリチウム泉プロジェクトを含む、私たちの探査土地保有量を拡大することを発表しました。
当社は2023年2月14日に売買協定を締結し、Malcolm J.Bell(“売り手”)に108項目の砂鉱請求(BRD 1-BRD 108)の100%権益を買収した。クレームは黒岩砂漠の南端ネバダ州ワショー県Gerlach村外に位置する約858ヘクタールのPlacaと沖積扇に関連し、Lithium Springs財産(“取引”)と呼ばれている。
取引条項:
- 当社は以下の事項に同意します
- (A)“協定”に署名したとき、標杭および記録費用33,982ドルを売り手に返済する
- (B)トロント証券取引所創業ボードで取引を受けた後、売り手に500,000株の自社株中の払込配当金及び非評価税普通株を発行する。
カナダ証券法によると、取引関連に発行されたすべての証券は4カ月零一日の保有期間がある。
Lithium Springsの属性について
このプロジェクトはネバダ州黒岩砂漠の南端に位置し、ネバダ州リノ北東約132キロのところにあり、区域は1、2、11と12郷32北、範囲は23である。この物件の中心は北緯119.331°,北緯40.676°,西経11952“(北緯40°40‘33”,北緯119°19’52“):UTM X 302,900 UTMY 4,505,400 NAD 27;11 N区である。
黒岩砂漠盆地の長さは約110キロ、最も広いところの幅は25キロに達する。中央広場は北東-南西方向に約50キロ、南東-北西方向に約10キロある。黒岩砂漠の西側面積は約2000平方キロメートルであり、ネバダ州に現在リストされている30個の既知の地熱資源区のうち5つを含む。
この土地は中程度の深さの盆地で覆われたPlaca領域を被覆しており,重力と地震調査から,谷充填堆積物の最大厚さは約1,200 m/3,600フィートであることが分かった。高含塩量は果樹表面に重要な植生の生育を阻止する。現地では,この盆地の一部に沸騰由来の湧水と強い異常リチウム値(3.5 ppmまで)を含む珪質焼結鉱が供給されており,これらの焼結鉱は同油田の西側に位置している。(米地質調査局公開アーカイブ報告書81-918。)これらのリチウムの値はリチウム鉱を生産する値よりはるかに低いが,プラヤ盆地内での蒸発濃縮に利用可能な重要な金属源を表している。
過去の探査作業と進行しようとした探査計画
この不動産の前に完成した仕事には、2016年のメッシュ土壌サンプリング計画が含まれており、合計170地点の200メートル間隔で、400メートル離れたラインでサンプルを収集している。リチウム濃度範囲は82.8から520 ppm,中央値は182 ppmであった。これらの値は隣接する範囲で背景よりも有意に高く,プラヤ粉砂と塩殻中のリチウム濃度を示した。この仕事が完了した後、浅層サンプリング計画を完成し、その後高解像度地球物理計画を完成し、潜在的な掘削目標を決定した。
現地の地質環境に加え,黒岩砂漠内で活発な地熱流体と地表塩類中のリチウムの存在は,ネバダ州クライトン谷と南アメリカリチウムハロゲン鉱床の特徴に合致している。これらの主張に排出される近傍地熱流体には1リットル当たり3~5 mgのリチウムが含まれており,地表サンプリング値が520 ppmと高いリチウムである可能性が高い。これらの初歩的な結果は、クライトン谷型ハロゲン水および/または粘土鉱床の探査を継続する必要があることを示している。
会社の第一段階探査計画に対して、合理的な予想はこの地区に対して再サンプリングを行い、地球物理測定を完成し、そして段階的探査方案を行い、地面サンプリング、螺旋或いは推進式掘削井戸水のサンプリング及び掘削地点を選択する地球物理仕事を含み、この物件に対して初歩的な掘削テストを行う。その後の第2段階探査計画は、追加の地上および地下サンプリングを含む可能性があり、リチウム含有ハロゲン水および/またはリチウム含有粘土鉱床の性質を試験することができる。
ヒューズ臨時会長兼最高経営責任者ティム·フェインバックさんコメント近隣地域の地熱活動が近いため、黒岩砂漠は巨大なリチウム探査の潜在力を持っている。会社はこの位置の良い資産のリチウムハロゲン水とリチウム粘土の潜在力を迅速に評価しようとしている。FUSEはこの資産に関する初歩的なNI#43-101技術報告を完成している
“国家機器43-101”で定義された合格者
ネバダ州スプリンクリークCPGエレン·J·モリスはNation Instrument 43-101定義の合格者であり、本プレスリリースの技術的側面を審査し、承認した。
Fuse Battery Metalsについて
FUSE電池金属会社はカナダに本部を置く探査会社であり、トロント証券取引所創業ボード上でFUSEをコードとして取引を行っている。同社の重点は電池製造に必要な高価値金属の探査だ。
オンタリオ州コバルト業
FuseはそのGlencore Bucke物件の100%の権益を持っており、この物件はオンタリオ省Cobalt東北やや東6キロのBucke Townshipに位置し、買い戻し条項、生産特許権使用料及び購入協議規則の制限を受けている。Glencore Bucke物件の敷地は16.2ヘクタールで、FuseのTeledyne Cobaltプロジェクトの西に位置しています。同社はオンタリオ州Cobalt付近にあるTeledyneプロジェクトの100%の権益も持っているが、特許権使用料を払わなければならない。Teledyne地所はAgnico鉱山のある地域の南界と西界に隣接している。
Glencore Bucke/Teledeyne Property
Glencore Bucke物件はオンタリオ省Cobalt北東6キロのBucke町に位置し,その北東角に以前コバルトを生産していたAgaunico鉱に隣接している。1905年から1961年までAgaunico鉱は合計4,350,000ポンド生産された。コバルト(“コバルト”)と98,000オンス銀(“銀”)(カンニングアン−ダンロープ,1979)Agaunico鉱で生産されたコバルト量はコバルト鉱営のどの他の鉱よりも多かった。コバルト価格の低迷と供給過剰のため、1961年に生産停止となった(トムソン、1964)。Glencore物件はFuse Batteryが100%所有しているが、買い戻し条項、生産特許権使用料及び引受契約を遵守しなければならない。
関連するTeledyne財産は,BuckeとLorrain町に位置し,5つの特許を取得した採鉱主張,合計79.1ヘクタール,および46個の未特許の採鉱主張ユニットを含み,合計約700ヘクタールである。ショッキング金属加工567とメンテナンスの良い副次道路に乗ることで容易に物件に到着することができます.
これまで、探査は累計2500万ドル(インフレ調整後の2020ドル)を超えてTeledyne不動産で、開発坂道と主要コバルト鉱化鉱脈に平行な500フィートの深さの現代坂道を含む貴重なインフラをもたらした。Teledyne資産はNew Found Goldの生産特許権使用料及びGlencore Canada Corp.に与える引受プロトコルを納付しなければならないが、Glencore Bucke物件は買い戻し準備、生産特許権使用料及びGlencore Canada Corp.に与える引受契約を払わなければならないAgaunico鉱で生産されたコバルトの大部分は、Teledeyneコバルト鉱北部境界まで南に延びる構造(15号鉱脈)に位置している現在FUSEは株式100%を所有している。鉱化はフロン/太古不整合の上125フィート(38.1メートル)の範囲にある。Agaunico鉱(カンニングアン-ダンロップ,1979)では,採取場幅が50フィート(15.2メートル)と高くなることは珍しくない。
取締役会を代表して
“ティム·ファンバック”
ティム·ファインバック社長臨時最高経営責任者
連絡先:
メール:info@fusecobalt.com
電話番号:236-521-0207
トロント証券取引所創業ボード取引所およびその監督サービス提供者(この用語はトロント証券取引所の政策において定義されている)は、本プレスリリースの十分性または正確性に責任を負わない。本プレスリリースは、様々なリスクおよび不確定要因の影響を受ける未来のイベントおよび条件に関するコメントを含むが、これらに限定されない前向きな陳述を含むことができる。歴史事実の陳述以外に、資源の潜在力、これから展開する仕事計画、地質解釈、鉱業権の受け入れと保証、資金獲得性などの方面に関連する評論はすべて前向きである。前向きな陳述は未来の業績の保証ではなく、実際の結果はそれらの陳述とは大きく異なるかもしれない。一般的な業務条件は実際の結果が前向き陳述と大きく異なる要素を招く可能性がある。
資料源:ヒューズ電池金属会社
Accesswire.comでソースコードバージョンを表示する: