share_log

Rover Metals Signs Definitive Option Agreement for Brownfields Critical Minerals Project at 60th Parallel, NT, Canada

Rover Metals Signs Definitive Option Agreement for Brownfields Critical Minerals Project at 60th Parallel, NT, Canada

罗孚金属公司签署位于加拿大北卡罗来纳州第60平行的Brownfield Critical Minerals项目的最终期权协议
GlobeNewswire ·  2022/09/14 14:30

VANCOUVER, British Columbia, Sept. 14, 2022 (GLOBE NEWSWIRE) -- Rover Metals Corp. (TSXV: ROVR) (OTCQB: ROVMF) (FSE:4XO) ("Rover" or the "Company") announces that further to its release of August 16, 2022, the Company has signed a definitive option agreement (the "Option Agreement") with Panarc Resources Ltd. ("Panarc") for the staged acquisition of up to a 90% ownership interest in the Indian Mountain Lake VMS project, NT, Canada (the "Project").

温哥华,不列颠哥伦比亚省,9月2022年14日(环球通讯社)--罗孚金属公司(多伦多证券交易所股票代码:ROVR)(场外交易代码:ROVMF)(FSE:4XO)("罗孚“或”公司)宣布,继其于2022年8月16日发布后,本公司已签署最终期权协议(期权协议“)与PanarcResources Ltd.(”全景圆弧)分期收购加拿大新界印第安山湖VMS项目高达90%的所有权权益(项目").

Indian Mountain Lake VMS Project
The Indian Mountain Lake VMS Project has had exploration dating back to the 1940s and has a historical resource spread across four zones on the project. The BB Zone and Kennedy Lake Zone have a combined historic resource of 1,400,000 tons grading 10% combined zinc and lead with 3.5 OPT (ounces per ton) of silver*. Approximately 900 metres west of the BB Zone, the Kennedy Lake West Zone has a historic resource of 610,000 tons grading 1.15% copper*. About 8 km southeast of the BB Zone, the Susu Lake Zone, has a historical resource consisting of 142,500 tons grading 0.95% copper*.

印度山湖VMS项目
印度山湖VMS项目的勘探可以追溯到20世纪40年代,历史资源分布在该项目的四个区域。BB区和肯尼迪湖区的历史总资源量为1,400,000吨,锌和铅的综合品位为10%,银的品位为3.5欧普特(盎司/吨)*。在BB区以西约900米处,肯尼迪湖西区拥有610,000吨铜品位1.15%的历史资源*。苏苏湖地区位于BB区东南约8公里处,历史资源包括14.25万吨品位0.95%的铜*。

The property is located approximately 195 km east-northeast of Yellowknife, NT, off the eastern arm of Great Slave Lake. Seasonal access relies upon fixed or rotor wing support. A right of way was cleared to the Project from Thompson Landing in the 1970s. If this right of way were to be brushed out, it would provide barge access at Thompson Landing, from Yellowknife, with ground transportation, considerably lowering any logistical costs. Future Government of Canada federally funded hydro-energy infrastructure could come close to the Project if the Taltson Hydro Dam expansion proceeds through the eastern arm of Great Slave Lake into Yellowknife. At the southwest-end of Great Slave Lake, Osisko Metals is gearing up to reopen the Pine Point Zinc-Lead Mine. At nearby Hay River, NT, there is a rail line to the Teck Resources Zinc Refinery in Trail, BC.

该物业位于新界耶洛奈夫东北偏东约195公里处,远离大奴湖的东岸。季节性通道依赖于固定翼或旋翼支撑。20世纪70年代,该项目从汤普森码头获得了通行权。如果这一通行权被取消,它将为从耶洛奈夫出发的汤普森码头提供驳船通道,提供地面运输,大大降低任何物流成本。如果Taltson Hydro大坝扩建工程穿过大奴湖的东支流进入黄刀口,由联邦政府资助的未来加拿大政府水电基础设施可能会接近该项目。在大奴湖的西南端,Osisko Metals正准备重启Pine Point锌铅矿。在附近的Hay River,有一条通往不列颠哥伦比亚省特雷尔的泰克资源锌精炼厂的铁路线。

*These resources are historic in nature. Further drilling is needed to bring them up to CIM Definition Standards. The historic data has not been verified by Rover. The historic information is provided in the 2103 Assessment Report for Indian Mountain Lake which is in public record with the Government of the Northwest Territories.

*这些资源具有历史意义。需要进一步钻探,使其达到CIM定义标准。历史数据尚未得到罗孚的核实。历史资料载于2103年印第安山湖评估报告,该报告已向西北地区政府公开记录。

Technical information has been approved by Gary Vivian, M.Sc., P.Geo., QP for the purposes of NI 43-101.

加里·维维安,M.S.C.,P.Geo,QP为NI 43-101的目的批准了技术信息。

Summary of the First Year Terms of the Indian Mountain Lake Definitive Option Agreement
In accordance with the terms of the Option Agreement, during the first year following the date of the Option Agreement, the Company has committed to incurring $200,000 in exploration expenditures on the Project and making a cash payment of $20,000 to Panarc. In addition, and subject to the approval by the TSX Venture Exchange, Rover will issue Panarc an aggregate of 3,500,000 common shares in the capital of the Company (the "Common Shares") within six months of the signing of the Option Agreement. The Common Shares, if authorized for issuance, will be subject to the standard four-month regulatory hold period.

印度山湖最终期权协议第一年条款摘要
根据期权协议的条款,于期权协议日期后的第一年内,本公司已承诺就该项目产生200,000美元的勘探开支,并向PanArc支付20,000美元的现金。此外,如果获得多伦多证券交易所创业板交易所的批准,罗孚将发行Panarc3,500,000股普通股,作为公司的资本(“普通股“)在期权协议签署后六个月内。普通股如获授权发行,将受标准的四个月监管持有期所规限。

Upcoming Conference
Rover Metals will be presenting at the Redefining Electric Metals Conference in Calgary, AB, on September 19th and 20th. Registration is at

即将召开的会议
罗孚金属公司将于9月19日在阿肯色州卡尔加里举行的重新定义电气金属大会上发表演讲这是和20这是。注册地址为

New WebsiteAn updated Corporate Fact Sheet is now available on our new website.

新网站现已在我们的新网站上提供了最新的公司概况介绍。

Judson Culter, CEO at Rover Metals, states "We see tremendous growth coming for critical minerals fueled by domestic EV demand in the U.S. and Canada. 97% of the Indian Mountain Lake greenstone belt, or approximately 30,000 acres, remains largely unexplored with the drill bit, so we are very excited about this project's future."

罗孚金属公司首席执行官贾德森·卡尔特表示:“我们预计,在美国和加拿大国内电动汽车需求的推动下,关键矿产将出现巨大增长。97%的印度山湖绿岩带(约30,000英亩)大部分仍未被钻头开采,因此我们对该项目的未来感到非常兴奋。”

Corporate Update
A Q&A interview with Rover's CEO, Judson Culter, is now also available for viewing here.

企业动态
路虎首席执行官贾德森·库尔特的问答采访现在也可以在这里观看。

About Rover MetalsRover is a publicly traded junior mining company that trades on the TSXV under symbol ROVR, on the OTCQB under symbol ROVMF, and on the FSE under symbol 4XO. The Company is now developing both: (1) critical minerals projects; as well as (2) precious metals projects. The Company is exclusive to the mining jurisdictions of Canada and the U.S. Five of the Company's mineral resource development projects are located near to the city of Yellowknife, 60th parallel, Canada.

关于罗孚MetalsRover是一家上市的初级矿业公司,在多伦多证券交易所交易,代码为ROVR,在OTCQB交易,代码为ROVMF,在FSE交易,代码为4XO。该公司目前正在开发两个项目:(1)关键矿产项目;以及(2)贵金属项目。该公司是加拿大和美国专有的矿业司法管辖区。该公司的五个矿产资源开发项目位于60岁的耶洛奈夫市附近这是与之平行的是加拿大。

You can follow Rover on its social media channels:
Twitter: daily company updates and industry news, and
YouTube: corporate videos.
Website:

你可以在罗孚的社交媒体频道上关注它:
推特:每天公司更新和行业新闻,以及
YouTube:企业视频。
网站:

ON BEHALF OF THE BOARD OF DIRECTORS
"Judson Culter"
Chief Executive Officer and Director

我代表董事会
《贾德森·库尔特》
董事首席执行官兼首席执行官

For further information, please contact:
Email: info@rovermetals.com
Phone: +1 (778) 754-2617

如需更多信息,请联系:
电子邮件:info@rovermetals.com
电话:+1(778)754-2617

Statement Regarding Forward-Looking Information
This news release contains statements that constitute "forward-looking statements." Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Rover's actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur. There can be no assurance that such statements prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements, and readers are cautioned not to place undue reliance on these forward-looking statements. Any factor could cause actual results to differ materially from Rover's expectations. Rover undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

关于前瞻性信息的声明
本新闻稿包含构成“前瞻性陈述”的陈述。此类前瞻性陈述涉及已知和未知的风险、不确定性和其他因素,可能会导致罗孚的实际结果、业绩或成就或行业发展与此类前瞻性陈述明示或暗示的预期结果、业绩或成就大不相同。前瞻性陈述是指不是历史事实的陈述,通常但并非总是由“预期”、“计划”、“预期”、“相信”、“打算”、“估计”、“项目”、“潜在”和类似的表述,或事件或条件“将”、“将”、“可能”、“可能”或“应该”发生。不能保证这样的说法被证明是准确的。实际结果和未来事件可能与此类陈述中预期的大不相同,敬请读者不要过度依赖这些前瞻性陈述。任何因素都可能导致实际结果与罗孚的预期大不相同。罗孚没有义务在管理层的信念、估计或意见或其他因素发生变化时更新这些前瞻性陈述。

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE EXPECTATIONS OF THE COMPANY AS OF THE DATE OF THIS NEWS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE THE COMPANY MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

本新闻稿中包含的前瞻性信息代表了公司在本新闻稿发布之日的预期,因此,在该日期之后可能会发生变化。读者不应过分重视前瞻性信息,也不应依赖截至任何其他日期的这些信息。虽然公司可以选择这样做,但IT不承诺在任何特定时间更新此信息,除非根据适用法律的要求。

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OF THIS RELEASE.

多伦多证券交易所创业板交易所及其监管提供商(该术语在多伦多证券交易所创业板交易所的政策中定义)均不对本新闻稿的充分性承担责任。


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发