share_log

Revival Gold Intersects 6.2 G/t Gold Over 14.2 Meters Within 3.6 G/t Gold Over 51.5 Meters at Beartrack-Arnett

Revival Gold Intersects 6.2 G/t Gold Over 14.2 Meters Within 3.6 G/t Gold Over 51.5 Meters at Beartrack-Arnett

Revival Gold在BearTrack-Arnett与超过14.2米的6.2克/吨黄金相交,在超过51.5米的3.6克/吨黄金范围内
GlobeNewswire ·  2022/09/12 07:35

TORONTO, Sept. 12, 2022 (GLOBE NEWSWIRE) -- Revival Gold Inc. (TSXV: RVG, OTCQX: RVLGF) ("Revival Gold" or the "Company"), is pleased to announce initial results from the Company's 2022 drilling program and provide an update on exploration at the Beartrack-Arnett Gold Project ("Beartrack-Arnett") located in Idaho, USA.

多伦多,9月2022年12月(环球通讯社)--复兴l 黄金 Inc. (TSXV: RVG, OTCQX: RVLGF)复兴黄金公司(“Revival Gold”或“公司”)很高兴宣布公司2022年钻探计划的初步结果,并提供位于美国爱达荷州的BearTrack-Arnett黄金项目(“BearTrack-Arnett”)的最新勘探情况。

Highlights:

重点:

  • Three core holes targeting the depth extension of mineralization at Beartrack-Arnett have been completed in the 2022 program; two in the Joss area and one in the South Pit area;
  • BT22-241D in the Joss area intersected 6.2 g/t gold over 14.2 meters within 3.6 g/t gold over 51.5 meters approximately 100 meters below hole BT18-220D, the most southerly intersection at Joss to-date (8.84 g/t gold over 3.0 meters within 1.79 g/t gold over 38.8 meters (see press release dated December 4th, 2018);
  • BT22-242D, also at Joss, intersected what appears to be a similar stockwork to hole BT21-240D in the same Proterozoic Yellowjacket Formation approximately 150 meters deeper than BT21-240D (4.34 g/t gold over 110.6 meters drilled width, including 12 g/t gold over 13.7 meters, and 8.8 g/t gold over 11.8 meters (see Revival Gold press release dated December 2nd, 2021)). Assays results are pending;
  • A third hole, BT22-243D, was completed at the south end of the South Pit. This hole is intended to extend the trend of higher-grade mineralization at Joss north to the South Pit and intersected stockwork mineralization as well as siliceous breccia within the target zone. Assay results are pending;
  • Approximately 2,300 meters of this year's planned 5,000-meter core drilling program have been completed at Beartrack-Arnett since the start of drilling in June; and,
  • Idaho's Moose Fire has passed through the Company's land position. All personnel are safe. Buildings and equipment were undamaged. Drilling has resumed with two rigs at Joss.
    Note: Drilled widths; true widths are estimated to be 30% to 70% of drilled width.
  • 三个芯孔在2022年计划中,已完成了BearTrack-Arnett矿化深度延伸的目标;两个在乔斯地区一个在南坑地区;
  • BT22-241D在Joss地区相交的14.2米以上6.2克/吨黄金黄金3.6克/吨,超过51.5米洞BT18-220d下约100米,Joss迄今最南端的交叉口(3.0米以上8.84克/吨黄金,38.8米以上1.79克/吨黄金(见12月4日的新闻稿这是, 2018);
  • BT22-242D,同样在乔斯,与BT21-240D孔有相似的网状物在同一元古代黄夹克建造中比BT21-240D深约150米(钻宽110.6米以上的黄金4.34g/t,包括13.7m以上的黄金12g/t,11.8m以上的8.8g/t黄金(见12月2日的Revival Gold新闻稿发送, 2021)). 化验结果待定;
  • 第三个洞,BT22-243D,在南坑的南端完工。这个洞的目的是将乔斯北部较高品位矿化的趋势延伸到南矿和交错网状矿化及硅质角砾岩在目标区域内。化验结果尚待公布;
  • 大致今年计划的5000米取心钻探计划中的2300米已经完成自6月份开始钻探以来,在BearTrack-Arnett;以及
  • 爱达荷州的驼鹿之火已经通过了公司的土地位置。所有人员都安全。建筑物和设备均未受损。乔斯的两个钻井平台已恢复钻探.
    注:钻孔宽度;实际宽度估计为钻孔宽度的30%至70%。

"This year's drilling to extend the potential for high-grade mineralization at Beartrack-Arnett has kicked-off with excellent results. We are seeing twice the gold grade and a wider intercept in hole 241D compared with hole 220D, which was located approximately 100 meters above it," said Hugh Agro, Revival Gold, President & CEO. "The results suggest that grade and widths are improving at depth and confirm the open nature of mineralization to the south at Joss. Drilling continues with two rigs with further results expected later this month", added Agro.

复兴黄金总裁首席执行官休·阿格罗表示:“今年为扩大贝尔斯塔-阿内特高品位矿化潜力而进行的钻探已经开始,取得了出色的结果。与位于其上方约100米的220D号孔相比,我们在241D号孔看到的黄金品位是前者的两倍,截距也更大。AGRO补充道:“结果表明,深度的品位和宽度正在改善,证实了乔斯以南矿化的开阔性质。钻探仍在继续,两个钻井平台预计将在本月晚些时候取得进一步结果。”

Details:

详细信息:

Detailed results for the drill hole released today are presented in the table below:

今天公布的钻孔的详细结果如下表所示:

Hole Number
Area
Azimuth
(deg.)
Dip
(deg.)
From
(m)

To
(m)

Drilled
Width
1
(m)
Fire Assay
Gold Grade
(g/t)

BT22-241 Joss 299 -58 404.0 405.4 1.4 4.95
        413.9 423.1 9.1 1.22
        532.4 533.8 1.4 6.17
        555.7 607.5 51.8 3.602
Incl.       566.5 581.6 15.2 3.81
Incl.       587.1 601.4 14.2 6.172
Incl.       588.7 589.7 1.0 10.65
Incl.       593.3 594.7 1.4 11.80
Incl.       598.2 599.8 1.5 8.28
孔数
面积
方位角
(度)
浸渍
(度)
从…
(m)


(m)

钻透
宽度
1
(m)
火灾检测
黄金等级
(克/吨)

BT22-241 乔斯 299 -58 404.0 405.4 1.4 4.95
413.9 423.1 9.1 1.22
532.4 533.8 1.4 6.17
555.7 607.5 51.8 3.602
包括 566.5 581.6 15.2 3.81
包括 587.1 601.4 14.2 6.172
包括 588.7 589.7 1.0 10.65
包括 593.3 594.7 1.4 11.80
包括 598.2 599.8 1.5 8.28

1 True width estimated to be approximately 30% to 70% of drilled width. Numbers may not add up due to rounding.
2 The interval 591.0 m to 591.7 m had 0% recovery and was included in the interval calculation as 0.7 m at 0 g/t gold.

1实际宽度估计约为钻井宽度的30%至70%。由于四舍五入的原因,数字可能不会相加。
2591.0米至591.7米的区段回收率为0%,计入区段计算为0.7m,含金量为0克/吨。

QA/QC Program

QA/QC计划

Quality Assurance/Quality Control consists of the regular insertion of certified reference materials, duplicate samples, and blanks into the sample stream. Check samples are submitted to an umpire laboratory at the end of the drilling program. Sample results are analyzed immediately upon receipt and all discrepancies are investigated. Samples are submitted to the ALS Geochemistry sample preparation facility in Twin Falls, Idaho. Gold analyses are performed at the ALS Geochemistry laboratory in Reno, Nevada or Vancouver, British Columbia, and multi-element geochemical analyses are completed at the ALS Minerals laboratory in Vancouver, British Columbia. ALS Minerals is an ISO/IEC 17025:2017 accredited lab.

质量保证/质量控制包括定期向样品流中插入经认证的标准物质、重复样品和空白。检查样本在钻井程序结束时提交给裁判实验室。样品结果在收到后立即进行分析,并调查所有差异。样品被提交给爱达荷州双子瀑布的ALS地球化学样品制备设施。金分析在内华达州雷诺或不列颠哥伦比亚省温哥华的ALS地球化学实验室进行,多元素地球化学分析在不列颠哥伦比亚省温哥华的ALS Minerals实验室完成。ALS Minerals是国际标准化组织/国际电工委员会17025:2017年认证的实验室。

Gold assays are determined on samples consisting of half drill core by fire assay and AAS on a 30-gram nominal sample weight (Au-AA23) for Beartrack, and Fire Assay and AAS on a 50-gram nominal sample weight (Au-AA24) for Arnett. For shallow holes, targeting leachable mineralization, gold is also determined by cyanide leach with an AAS finish on a nominal 30-gram sample weight (Au-AA13). Multi element geochemical analyses are completed on selected drill holes using the ME-MS 61M method.

对于BearTrack,金分析是通过火法和原子吸收法在30克标称样品重量(Au-aa23)上进行的,对于Arnett来说,火分析和原子吸收法是在50克标称样品重量(Au-AA24)上进行的。对于以可浸出矿化为目标的浅孔,金也是通过氰化物浸出并以标称30克样品重量(Au-AA13)完成原子吸收光谱分析来测定的。用ME-MS 61M方法对选定的钻孔进行了多元素地球化学分析。

Qualified Person

有资格的人

Steven T. Priesmeyer, C.P.G., Vice President Exploration, Revival Gold Inc., is the Company's designated Qualified Person for this news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects and has reviewed and approved its scientific and technical content.

史蒂文·T·普里斯迈尔,C.P.G.,总裁勘探副总裁,复兴黄金公司,是公司指定的符合国家仪器43-101矿产项目披露标准的本新闻稿的合格人员,并已审查和批准了其科学技术含量。

Revival Gold Inc. is a growth-focused gold exploration and development company. The Company is advancing the Beartrack-Arnett Gold Project located in Idaho, USA.

Revival Gold Inc.是一家专注于增长的黄金勘探和开发公司。该公司正在推进位于美国爱达荷州的BearTrack-Arnett黄金项目。

Beartrack-Arnett is the largest past-producing gold mine in Idaho. Engineering work has been initiated on a Preliminary Feasibility Study ("PFS") for the potential restart of heap leach operations. Meanwhile, exploration continues, focused on expanding the 2022 Indicated Mineral Resource of 65.0 million tonnes at 1.01 g/t gold containing 2.11 million ounces of gold and Inferred Mineral Resource of 46.2 million tonnes at 1.31 g/t gold containing 1.94 million ounces of gold (see Revival Gold independent NI-43-101 Technical Report by Wood plc dated July 13th, 2022, for further details). The mineralized trend at Beartrack extends for over five kilometers and is open on strike and at depth. Mineralization at Arnett is open in all directions.

BearTrack-Arnett是爱达荷州最大的过去生产的金矿。关于可能重新启动堆浸操作的初步可行性研究(PFS)的工程工作已经开始。与此同时,勘探仍在继续,重点是扩大2022年指示矿产资源量6500万吨,含金量1.01克/吨,含黄金211万盎司;推断矿产资源量4620万吨,含金量1.31克/吨,含金量194万盎司(见Wood plc于7月13日发布的独立技术报告NI-43-101这是,2022,以了解更多详细信息)。BearTrack的矿化趋势绵延5公里以上,在走向和深度上都是开放的。阿内特的矿化是四面八方的。

Revival Gold has approximately 86.9 million shares outstanding and an estimated cash balance of C$7.1 million as of June 30th, 2022. All figures in this news release are in metric units and in $US unless stated otherwise. Additional disclosure including the Company's financial statements, technical reports, news releases and other information can be obtained at  or on SEDAR at .

截至6月30日,Revival Gold约有8,690万股流通股,现金余额估计为710万加元这是,2022年。除非另有说明,本新闻稿中的所有数字均以公制单位和美元为单位。其他披露信息,包括公司的财务报表、技术报告、新闻稿和其他信息,可在SEDAR或在SEDAR获得,网址:。

For further information, please contact:

如需更多信息,请联系:

Hugh Agro, President & CEO or Melisa Armand, Manager, Investor Relations
Telephone: (416) 366-4100 or Email: info@revival-gold.com

休·阿格罗,总裁首席执行官或梅丽莎·阿尔曼德,投资者关系部经理
电话:(416)366-4100或电子邮件:info@revival-Goldd.com

Cautionary Statement

警示声明

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

多伦多证券交易所创业板交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

This News Release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties, and other factors involved with forward-looking information could cause actual events, results, performance, prospects, and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital, operating and reclamation costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, an inability to predict and counteract the effects of COVID-19 on the business of the Company, including but not limited to the effects of COVID-19 on the price of commodities, capital market conditions, restriction on labour and international travel and supply chains, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

本新闻稿包括一些不包含历史事实的“前瞻性陈述”。前瞻性陈述包括描述公司未来计划、目标或目标的估计和陈述,包括公司或管理层预期将出现的情况或结果的表述。前瞻性陈述可以用“相信”、“预期”、“预期”、“估计”、“可能”、“将”或“计划”等术语来识别。由于前瞻性陈述以假设为基础,涉及未来的事件和情况,因此它们本身就具有内在的风险和不确定性。虽然这些陈述是基于公司目前掌握的信息,但公司不能保证实际结果将符合管理层的期望。前瞻性信息涉及的风险、不确定性和其他因素可能会导致实际事件、结果、业绩、前景和机会与此类前瞻性信息明示或暗示的内容大不相同。本新闻稿中的前瞻性信息包括但不限于公司的目标、目标或未来计划、声明、勘探结果、潜在矿化、矿产资源的估计、勘探和矿山开发计划、开始运营的时间和对市场状况的估计。可能导致实际结果与前瞻性信息大相径庭的因素包括但不限于未能查明矿产资源、未能将估计的矿产资源转换为储量、无法完成建议生产决定的可行性研究、冶金测试结果的初步性质、延迟获得或未能获得所需的政府、环境或其他项目批准、政治风险。, 与未来所需融资的可获得性和成本有关的不确定性,股票市场的变化,通货膨胀,汇率的变化,大宗商品价格的波动,项目开发的延迟,资本,运营和回收成本与估计值大不相同,以及矿产勘探和开发行业涉及的其他风险,无法预测和抵消新冠肺炎对公司业务的影响,包括但不限于新冠肺炎对商品价格的影响,资本市场状况,对劳动力和国际旅行与供应链的限制。以及该公司在SEDAR上提交的公开文件中列出的那些风险。尽管本公司认为在准备本新闻稿中的前瞻性信息时使用的假设和因素是合理的,但不应过度依赖这些信息,因为这些信息仅适用于本新闻稿发布之日,并且不能保证此类事件将在披露的时间框架内发生或根本不会发生。除法律要求外,公司没有任何更新或修改任何前瞻性信息的意图或义务,无论是由于新信息、未来事件或其他原因。


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发