share_log

Eskay Mining Discovers More VMS Targets and Commences Drilling at Scarlet Ridge

Eskay Mining Discovers More VMS Targets and Commences Drilling at Scarlet Ridge

Eskay矿业发现更多VMS目标并开始在Sred Ridge钻探
Accesswire ·  2022/07/27 08:05

TORONTO, ON / ACCESSWIRE / July 27, 2022 / Eskay Mining Corp. ("Eskay" or the "Company") (TSXV:ESK)(OTCQX:ESKYF)(Frankfurt:KN7)(WKN:A0YDPM) is pleased to announce discovery of multiple new volcanogenic massive sulfide ("VMS") targets across the Scarlet Ridge region, part of its 100% controlled Consolidated Eskay project, British Columbia. Diamond drilling recently commenced at the first of the Scarlet Ridge targets. To date, the Company has completed 12,093m of diamond core drilling, approximately 40% of the 30,000m planned to be completed in 2022. Drill production is currently on target to reach this aggressive goal with four drills fully operational.

多伦多,on/ACCESSWIRE/2022年7月27日/艾斯凯矿业公司(“艾斯凯”或“公司”)(TSXV:ESK)(OTCQX:ESKYF)(Frankfurt:KN7)(WKN:A0YDPM)我们高兴地宣布,在不列颠哥伦比亚省Scarlet Ridge地区发现了多个新的火山成因块状硫化物(“VMS”)目标,这是其100%控制的综合Eskay项目的一部分。钻石钻探最近在斯卡里奇目标的第一个开始。到目前为止,公司已经完成了12,093米的钻石岩心钻探,约占计划于2022年完成的30,000米钻探的40%。钻探生产目前正在按目标进行,以实现这一雄心勃勃的目标,四个钻探全面投入使用。

"Our team's scientific approach to exploration and comprehensive understanding of VMS is really unlocking the potential of the Consolidated Eskay property", commented Dr. John DeDecker, Eskay Mining's VP of Exploration. "In the vicinity of Scarlet Ridge situated at the northern end of the Eastern Anticline, we are finding intensely mineralized VMS systems within sight of the Eskay Creek Mine located approximately seven km to the west. More and more sulfide mineralization turns up where predicted by our geological models. Newly discovered VMS targets along the Scarlet Ridge-Tarn Lake trend lead us to believe that this VMS district is much larger than previously envisioned."

Eskay矿业勘探副总裁John DeDecker博士评论道:“我们团队对VMS的科学勘探方法和对VMS的全面了解真正释放了Eskay综合矿藏的潜力。在位于东部背斜北端的Scarlet Ridge附近,我们发现了强烈矿化的VMS系统,位于以西约7公里处的Eskay Creek矿山附近。越来越多的硫化物矿化出现在我们的地质模型预测的地方。沿着Scarlet Ridge-Tarn Lake趋势新发现的VMS目标使我们相信VMS区比之前预测的要大得多。

Multiple New VMS Targets Discovered

发现多个新的VMS目标

  • Recent field investigations of the Scarlet Ridge vicinity have confirmed the presence of a trend of multiple VMS systems extending a minimum of 5 km along strike (Figure 1). VMS mineralization occurs in four distinct feeder zones, Scarlet Ridge North, Scarlet Ridge South, Scarlet Valley, and Scarlet Knob, each spaced approximately 1 km apart.
  • These feeder zones are all hosted by highly prospective upper and lower Hazelton Group stratigraphy at the north end of the Eastern Anticline approximately 7 km east of the Eskay Creek Mine which is situated at the north end of the Eskay Anticline.
  • Preliminary investigations suggest this trend of VMS mineralization continues southwestwards to the Tarn Lake target which, if confirmed, defines a 8.5 km trend of VMS systems.
  • Planned 2022 drilling in the Scarlet Ridge area targets feeder and sulfide replacement horizons at Scarlet Ridge South, Scarlet Valley, and Scarlet Knob. Extensive ongoing geologic mapping and rock chip sampling of sulfide mineralization is enabling evaluation of precious metal endowment of as yet undrilled targets discovered during the 2022 program.
  • 最近对Scarlet Ridge附近的实地调查证实,存在着多个VMS系统沿Strike延伸至少5公里的趋势(图1)。VMS矿化赋存于四个不同的馈送带中,即红岭北部、红岭南部、红谷和红节,每个相距约1公里。
  • 这些馈送带均位于东部背斜北端、Eskay Creek矿以东约7公里处、位于Eskay背斜北端的极具远景的上、下黑兹尔顿群地层中。
  • 初步调查表明,VMS矿化趋势继续向西南方向延伸至塔恩湖目标,如果得到证实,将定义VMS系统8.5公里的趋势。
  • 计划于2022年在Scarlet Ridge地区钻探的目标是Scarlet Ridge南部、Scarlet Valley和Scarlet Knob的喂料器和硫化物置换层。正在进行的广泛地质测绘和硫化物矿化的岩屑采样使2022年计划期间发现的尚未钻探的目标的贵金属资源得以评估。

Maiden Drilling at Scarlet Ridge

红岭钻探处女作

Drilling has commenced at Scarlet Ridge South. Drill hole SR22-1 targets the core of an intensely mineralized and altered VMS feeder zone outcropping at the surface over an approximately 800x500 m area (Figures 2 and 3). Replacement-style sulfide mineralization occurs in at least two horizons extending several hundred meters along strike from the feeder zone. Recent and historic rock chip samples and handheld XRF investigations of sulfide minerals in outcrop show very strong pathfinder element support for Au and Ag mineralization.

红岭南部的钻探工作已经开始。SR22-1钻孔针对的是地表露出的强烈矿化和蚀变的VMS供给带的核心,面积约为800x500米(图2和图3)。交代式硫化物矿化发生在至少两个层位中,沿供矿带走向延伸数百米。现代和历史岩屑样品和露头硫化物矿物的手持XRF研究表明,探路元素对金银成矿作用具有很强的支持作用。

Scarlet Valley and Scarlet Knob VMS Discoveries

猩红山谷和猩红Knob VMS的发现

Two new VMS targets have been identified southwest of Scarlet Ridge. Scarlet Valley, situated approximately one km southwest of Scarlet Ridge, is characterized by dacite and andesite breccia and peperite displaying extensive sulfide stockwork and associated silicification (Figures 4-9). The Scarlet Valley VMS feeder zone is approximately 750 m wide at least one km long with numerous unexplored gossans extending to the west as well as along strike thus defining laterally extensive subseafloor replacement horizons. Recent and historic rock chip samples and handheld XRF investigations of sulfide minerals in outcrop show very strong pathfinder element support for Au and Ag mineralization at Scarlet Valley. A maiden drill program is planned for Scarlet Valley during 2022.

在红岭西南部发现了两个新的VMS目标。猩红谷位于Scarlet Ridge西南约一公里处,以英安岩、安山岩角砾岩和珍珠岩为特征,显示出广泛的硫化物网状结构和相关的硅化作用(图4-9)。红谷VMS支线带宽约750米,至少1公里长,有许多未勘探的珊瑚向西延伸,并沿走向延伸,从而确定了横向广阔的海底置换层位。现代和历史岩屑样品和露头硫化物矿物的手持XRF研究表明,红色河谷的Au和Ag矿化具有很强的引路元素支持。红谷计划在2022年进行首次演习。

Scarlet Knob is 1 km further southwest of Scarlet Valley and displays similar size and attributes to Scarlet Valley. Extensive geologic mapping and sampling is currently underway at Scarlet Knob and Tarn Lake, yet further south, to more fully explore this area. Eskay thinks it is possible that there is up to 8.5 km of VMS mineralization along the full Scarlet Ridge trend.

猩红Knob位于猩红山谷西南1公里处,其大小和属性与猩红山谷相似。在更南边的Scarlet Knob和Tarn Lake,目前正在进行广泛的地质测绘和取样,以更全面地勘探这一地区。Eskay认为,沿着完整的Scarlet Ridge趋势,可能有多达8.5公里的VMS矿化。

To date, Eskay Mining has completed 12,093m of diamond core drilling, approximately 40% of the 30,000m planned for 2022. Thus far, drilling has occurred around the area called Jeff North. The Company has now commenced drilling at Scarlet Ridge and TV. At present, four drills are fully operational and drill production is on track to reach Eskay's aggressive goal of 30,000 m.

到目前为止,Eskay矿业已经完成了12,093米的钻石岩心钻探,约占2022年计划钻探30,000米的40%。到目前为止,在名为杰夫·诺斯的地区进行了钻探。该公司现已开始在Scarlet Ridge和TV钻探。目前,四个钻探已全面投入使用,钻探生产有望达到Eskay提出的3万米的积极目标。

Dr. Quinton Hennigh, P. Geo., a Director of the Company and its technical adviser, a qualified person as defined by National Instrument 43-101, has reviewed and approved the technical contents of this news release.

公司董事及其技术顾问Quinton Hennigh博士已审核并批准了本新闻稿的技术内容。Quinton Hennigh博士是National Instrument 43-101定义的合格人员。

About Eskay Mining Corp:

关于Eskay矿业公司:

Eskay Mining Corp (TSX-V:ESK) is a TSX Venture Exchange listed company, headquartered in Toronto, Ontario. Eskay is an exploration company focused on the exploration and development of precious and base metals along the Eskay rift in a highly prolific region of northwest British Columbia known as the "Golden Triangle," 70km northwest of Stewart, BC. The Company currently holds mineral tenures in this area comprised of 177 claims (52,600 hectares).

Eskay矿业公司(多伦多证券交易所股票代码:ESK)是一家在多伦多证券交易所上市的公司,总部设在安大略省多伦多。Eskay是一家勘探公司,专注于沿着不列颠哥伦比亚省西北部Eskay裂谷勘探和开发贵金属和贱金属。Eskay裂谷位于不列颠哥伦比亚省西北部,位于不列颠哥伦比亚省斯图尔特西北70公里处,被称为“金三角”。本公司目前持有该地区的矿产所有权,包括177项权利主张(52,600公顷)。

All material information on the Company may be found on its website at and on SEDAR at .

有关公司的所有重要信息均可在公司网站和SEDAR网站上找到。

For further information, please contact:

如需更多信息,请联系:

Mac Balkam
President & Chief Executive Officer
T: 416 907 4020
E: Mac@eskaymining.com

Mac Balkam
总裁&首席执行官
T: 416 907 4020
邮箱:mac@eskaymining.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

都不是多伦多证券交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)对本新闻稿的充分性或准确性承担责任。

Forward-Looking Statements: This Press Release contains forward-looking statements that involve risks and uncertainties, which may cause actual results to differ materially from the statements made. When used in this document, the words "may", "would", "could", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" and similar expressions are intended to identify forward-looking statements. Such statements reflect our current views with respect to future events and are subject to risks and uncertainties. Many factors could cause our actual results to differ materially from the statements made, including those factors discussed in filings made by us with the Canadian securities regulatory authorities. Should one or more of these risks and uncertainties, such as actual results of current exploration programs, the general risks associated with the mining industry, the price of gold and other metals, currency and interest rate fluctuations, increased competition and general economic and market factors, occur or should assumptions underlying the forward looking statements prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, or expected. We do not intend and do not assume any obligation to update these forward-looking statements, except as required by law. Shareholders are cautioned not to put undue reliance on such forward-looking statements.

转发-外观声明:本新闻稿包含涉及风险和不确定因素的前瞻性陈述,可能会导致实际结果与所作陈述大相径庭。在本文件中使用的“可能”、“将”、“可能”、“将”、“打算”、“计划”、“预期”、“相信”、“估计”、“预期”等词语以及类似的表述都是为了识别前瞻性陈述。这些陈述反映了我们目前对未来事件的看法,受到风险和不确定因素的影响。许多因素可能会导致我们的实际结果与声明大不相同,包括我们向加拿大证券监管机构提交的文件中讨论的那些因素。如果这些风险和不确定性中的一个或多个发生,例如当前勘探计划的实际结果、与采矿业相关的一般风险、黄金和其他金属的价格、货币和利率波动、竞争加剧以及一般经济和市场因素,或者前瞻性陈述所依据的假设被证明是不正确的,实际结果可能与本文中描述的预期、计划、预期或预期的结果大不相同。我们不打算也不承担任何义务更新这些前瞻性陈述,除非法律要求。告诫股东不要过度依赖此类前瞻性陈述。.

(Figure 1: Property-wide SkyTEM and BLEG maps with locations of VMS showings.)

(图1:带有VMS放映位置的全酒店SkyTEM和Bleg地图。)

(Figure 2: A map of Scarlet Ridge showing mineralized zones, and the surface traces of planned drill holes.)

(图2:红岭地图,显示矿化带和计划中的钻孔的表面痕迹。)

(Figure 3: SR22-1 20.5 m showing sulfide stockwork and pervasive replacement-style mineralization of an intensely hydrothermally altered andesite breccia.)

(图3:SR22-120.5m,显示强烈热液蚀变安山岩角砾岩的硫化物网状和普遍的交替式矿化。)

(Figure 4: Schematic map of Scarlet Valley showing areas that have field confirmed sulfide mineralization, and the surface traces of planned drill holes. Gossans extend beyond these areas to the east and west, and are a focus of continuing prospecting and geological mapping.)

(图4:红色山谷示意图,显示已证实硫化物矿化的地区,以及计划中的钻孔的表面痕迹。戈萨斯山脉从这些地区延伸到东部和西部,是继续勘探和地质测绘的重点。)

(Figure 5: A view of Scarlet Valley looking southwest showing the extent of the East-West trending VMS feeder zone, as well as numerous occurrences of gossanous outcrops associated with semi-massive replacement-style sulfide mineralization. The feeder zone cuts across stratigraphy, and extends at least 1 km from east to west and 750 meters along strike. Handheld XRF analyses of sulfide mineralization in outcrop shows widespread high pathfinder element values, consistent with precious metal-bearing historic rock chip samples from the area. Eskay Creek mine is located 7 km due west of Scarlet Valley.)

(图5:向西南望的红谷图,显示了东西走向的VMS馈送带的范围,以及与半块状交代式硫化物矿化有关的大量天鹅绒露头。支线带横穿地层,东西长至少1公里,走向至少750米。露头硫化物矿化的手持XRF分析表明,普遍存在较高的探路元素值,这与该地区含有贵金属的历史岩屑样品相一致。Eskay Creek矿位于Scarlet山谷正西7公里处。)

(Figure 6: A portion of the Scarlet Valley Feeder zone looking east. Intensely gossanous rocks have abundant sulfide and sulfosalt mineralization, with handheld XRF indicating very high concentrations of the pathfinder elements Ag, As, and Sb. Handheld XRF cannot reliably measure Au concentrations.)

(图6:红谷支线带的一部分朝东。强烈的硅质岩具有丰富的硫化物和硫酸盐矿化,手持XRF表明探矿元素Ag、As和Sb的浓度非常高。手持XRF不能可靠地测量Au浓度。)

(Figure 7: An outcrop of semi-massive sulfide replacing dacite breccia at Scarlet Valley. This outcrop is visible below center in Figure 5. The rock hammer is 74 cm long for scale.)

(图7:红谷英安岩角砾岩的半块状硫化物露头。在图5的中心下方可以看到这个露出地面的地方。按比例计算,这个石锤有74厘米长。)

(Figure 8: A close-up of the semi-massive replacement-style sulfide mineralization shown in Figure 7, note the 13.5 cm long pen scratcher for scale. The host rock is an intensely silicified dacite breccia.)

(图8:图7所示的半块状置换式硫化物矿化的特写,请注意13.5厘米长的刻度笔。主岩是强烈硅化的英安岩角砾岩。)

(Figure 9: This sample from Scarlet Valley shows typical stockwork mineralization hosted by an intensely clay and silica altered dacite breccia. Handheld XRF investigations of several points on this sample show consistently strong concentrations of the Au pathfinder elements Ag, As, and Sb. Handheld XRF cannot reliably measure Au concentrations. The stockwork mineralization is dominated by pyrite overgrown by tetrahedrite, the same mineral assemblage associated with precious metals at the other VMS systems across the property.)

(图9:这个来自红谷的样本显示了典型的网状矿化,赋存于强烈的粘土和硅质蚀变英安岩角砾岩中。对该样品上几个点的手持XRF研究表明,Au探路者元素Ag、As和Sb的浓度一直很高。手持XRF不能可靠地测量Au的浓度。网状矿化以黄铁矿为主,其矿物组合与其他VMS系统中的贵金属有关。)

SOURCE: Eskay Mining Corp.

资料来源:埃斯凯矿业公司


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发