share_log

Turmalina Metals Files NI 43-101 Technical Report for the Chanape Gold-Silver-Copper Project, Peru

Turmalina Metals Files NI 43-101 Technical Report for the Chanape Gold-Silver-Copper Project, Peru

秘鲁Chanape金银铜矿项目TurMalina Metals Files NI 43-101技术报告
GlobeNewswire ·  2022/07/05 08:05

VANCOUVER, British Columbia, July 05, 2022 (GLOBE NEWSWIRE) -- Turmalina Metals Corp. ("Turmalina", or the "Company"; TBX-TSXV, TBXXF-OTCQX) is pleased to announce that the Company has filed a Technical Report (the "Report") in compliance with National Instrument 43-101 ('NI 43-101') on the Company's Chanape gold-silver-copper project (the 'Project'), located in San Damian District, central Peru.

温哥华,不列颠哥伦比亚省,2022年7月5日(环球通讯社)-TurMalina Metals Corp.(特尔马利纳,或“公司“;TBX-TSXV,TBXXF-OTCQX)高兴地宣布,本公司已按照National Instrument 43-101(‘NI 43-101’)的要求提交了一份关于本公司位于秘鲁中部圣达米安区的Chanape金银铜矿项目(以下简称”项目“)的技术报告(”报告“)。

The Report was independently prepared by Caracle Creek SpA of Santiago, Chile.

这份报告是由智利圣地亚哥的卡拉克克里克温泉独立编写的。

The NI 43-101 Technical Report describes the history, permitting, geology and mineralisation of the Project, and makes the following conclusions and recommendations:

NI 43-101技术报告描述了该项目的历史、许可、地质和矿化情况,并提出了以下结论和建议:

  • The Project contains multiple high-grade tourmaline Au-Ag-Cu breccia pipes, with 30 breccia zones identified to date.
  • These breccias and associated mineralised veins are interpreted to have been sourced from an underlying porphyry Cu-Mo-Ag-Au system.
  • The Company should explore the tourmaline breccia targets, and in addition, should evaluate the deeper porphyry potential of the Project.
  • A two-stage exploration program is recommended, with an initial Phase 1 of 10 drill holes testing 3 breccia pipes, followed by a more comprehensive Phase 2 (USD$5.5M over several years) should the results of Phase 1 prove positive.
  • 该项目包含多个高品位电气石Au-Ag-Cu角砾岩管,迄今已查明30个角砾岩带。
  • 这些角砾岩和相关矿化脉被解释为来自下伏斑岩系统的铜-钼-银-金。
  • 该公司应勘探电气石角砾岩目标,此外,应评估该项目的深部斑岩潜力。
  • 建议采用两阶段勘探计划,第一阶段先用10个钻孔测试3根角砾岩管,如果第一阶段的结果证明是积极的,第二阶段将进行更全面的第二阶段(几年内耗资550万美元)。

Dr. Rohan Wolfe, Chief Executive Officer, states:

首席执行官罗汉·沃尔夫博士说:

"Completing the Technical Report on Chanape is an important step forward as we prepare for our inaugural drilling program at the Project. Previous exploration at the Project has already defined multiple high-grade targets, and this independent report highlights the outstanding exploration potential of the Project. The Project is a large and complex system with high-grade Au-Ag-Cu breccia and vein targets already defined, and the potential to host significant porphyry Cu-Mo-Au-Ag mineralisation."

完成Chanape的技术报告是向前迈出的重要一步,因为我们正在为我们在该项目的首个钻探计划做准备。该项目之前的勘探已经确定了多个高品位目标,这份独立报告强调了该项目突出的勘探潜力。该项目是一个大型而复杂的系统,已经确定了高品位Au-Ag-Cu角砾岩和脉状目标,并有可能成为重要的斑岩铜钼金银矿化的发源地。

The NI 43-101 technical Report titled, "National Instrument 43-101 Technical Report on the Chanape Gold-Silver-Copper Project" has been filed on both SEDAR (sedar.com) and the Company's website (turmalinametals.com), and can be downloaded at the following link:

NI 43-101技术报告《国家仪器43-101 Chanape金-银-铜项目技术报告》已在SEDAR(sedar.com)和公司网站(turMalinametals.com)上提交,并可通过以下链接下载:

On Behalf of the Company,

我谨代表本公司,

Dr. Rohan Wolfe, Chief Executive Officer and Director

董事首席执行官罗翰·沃尔夫博士

Website: turmalinametals.com
Address: #488 - 1090 West Georgia St, Vancouver, BC V6E 3V7.
For Investor Relations enquiries, please contact Bryan Slusarchuk at +1 833 923 3334 (toll free) or via info@turmalinametals.com.

网址:turMalinametals.com
地址:温哥华西乔治亚街#488-1090,BC V6E 3V7。
投资者关系部的查询,请联系Bryan Slusarchuk,电话:+1 833 923 3334(免费),或电子邮件:info@turMalinametals.com。

Statements

陈述

About Turmalina Metals: Turmalina Metals is a TSXV-listed exploration company focused on developing our portfolio of high-grade gold-copper-silver projects in South America. Our focus is on tourmaline breccias, a deposit style overlooked by many explorers. Turmalina Metals is led by a team responsible for multiple gold-copper-silver discoveries who are highly experienced in this deposit style. Our projects are characterised by open high-grade mineralization on established mining licenses that present compelling drill targets. The most advanced project held by Turmalina is the San Francisco project in San Juan, Argentina. For further information on the San Francisco Project, refer to the technical report entitled "NI43-101 Technical Report San Francisco Copper Gold Project, San Juan Province, Argentina" dated November 17, 2019, under the Corporation's profile at .

特尔马利纳金属公司简介:特玛利纳金属公司是一家在多伦多证券交易所上市的勘探公司,专注于开发我们在南美的高品位金-铜-银项目组合。我们的重点是电气石角砾岩,这是一种被许多探险家忽视的矿床风格。Turmarina Metals由一个团队领导,该团队负责多个金-铜-银的发现,他们在这种矿床风格方面经验丰富。我们的项目的特点是在现有采矿许可证上开放高品位矿化,提供引人注目的钻探目标。特尔马利纳持有的最先进的项目是阿根廷圣胡安的旧金山项目。欲了解有关旧金山项目的更多信息,请参阅2019年11月17日的技术报告《NI43-101阿根廷圣胡安省旧金山铜金项目》,该报告位于公司简介下。

Qualified Person: The scientific and technical data contained in this news release pertaining to the San Francisco and Turmalina projects has been reviewed and approved by Dr. Rohan Wolfe, Chief Executive Officer, MAIG, who serves as the Qualified Person (QP) under the definition of National Instrument 43-101.

合格人员:本新闻稿中包含的与旧金山和特尔马利纳项目有关的科学和技术数据已由MAIG首席执行官Rohan Wolfe博士审查和批准,他是National Instrument 43-101定义下的合格人员(QP)。

Forward Looking Statement: This news release contains certain "forward-looking statements" within the meaning of such statements under applicable securities law. Forward-looking statements are frequently characterized by words such as "anticipates", "plan", "continue", "expect", "project", "intend", "believe", "anticipate", "estimate", "may", "will", "potential", "proposed", "positioned" and other similar words, or statements that certain events or conditions "may" or "will" occur. These statements are only predictions. Various assumptions were used in drawing the conclusions or making the projections contained in the forward-looking statements throughout this news release. Forward-looking statements are based on the opinions and estimates of management at the date the statements are made and are subject to a variety of risks (including those risk factors identified in the Corporation's prospectus dated November 21, 2019) and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. The Corporation is under no obligation, and expressly disclaims any intention or obligation, to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by applicable law.

前瞻性陈述:根据适用的证券法,本新闻稿包含某些符合此类声明含义的“前瞻性声明”。前瞻性表述经常使用“预期”、“计划”、“继续”、“预期”、“项目”、“打算”、“相信”、“预期”、“估计”、“可能”、“将”、“潜在”、“建议”、“定位”等类似词语,或某些事件或条件“可能”或“将”发生的陈述。这些声明只是预测。在整个新闻稿中,前瞻性陈述中所包含的结论或预测都使用了各种假设。前瞻性表述基于管理层在作出表述之日的意见和估计,可能会受到各种风险(包括公司日期为2019年11月21日的招股说明书中确定的风险因素)以及可能导致实际事件或结果与前瞻性表述中预测的大不相同的不确定因素和其他因素的影响。除非适用法律明确要求,否则公司没有义务更新或修改任何前瞻性陈述,无论是由于新信息、未来事件或其他原因,也明确表示不打算或承担任何义务。

There is no assurance when the government-imposed measures related to COVID-19 in Argentina will be lifted. There is uncertainty over the form and duration of government measures and multiple policy changes may occur with regards to these measures over time. The Company may not provide updates on various government measures and changes to these measures as they occur. Protocols related to COVID-19, and the effects of the pandemic on service providers located throughout South America, may lead to delays in the future reporting of results.

目前尚不能保证政府在阿根廷实施的与新冠肺炎相关的措施何时会取消。政府措施的形式和期限存在不确定性,随着时间的推移,这些措施可能会发生多项政策变化。本公司可能不会提供各种政府措施的最新情况以及这些措施发生的变化。与新冠肺炎相关的协议,以及大流行对南美洲各地服务提供商的影响,可能会导致未来结果报告的延迟。


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发