share_log

Quebec Precious Metals drills La Pointe Extension: 0.84 g/t Au Over 63 m Downhole, Higher-Grade Core Extended +200 m at Depth, Open in All Directions

Quebec Precious Metals drills La Pointe Extension: 0.84 g/t Au Over 63 m Downhole, Higher-Grade Core Extended +200 m at Depth, Open in All Directions

魁北克贵金属钻探La Pointe延伸:井下超过63米,高品位岩心延伸+200米,全方位开放
Accesswire ·  2022/05/26 07:05

MONTREAL, QC / ACCESSWIRE / May 26, 2022 / Quebec Precious Metals Corporation ("QPM" or the "Company") (TSXV:QPM)(OTCQB:CJCFF)(FSE:YXEP) is pleased to announce drill hole assay results from drill hole 189 and the six (6) drill holes from the 2022 winter program (7 holes, totalling 2,982 m). The results demonstrate the depth and strike extension of higher gold mineralization for an additional 200 m at the La Pointe Extension gold deposit, on the Company's 100% owned Sakami project in the Eeyou Istchee James Bay territory of Quebec.

蒙特利尔,QC/ACCESSWIRE/2022年5月26日/魁北克贵金属公司(“QPM”或“公司”)(多伦多证券交易所股票代码:QPM)(OTCQB:CJCFF)(证券交易所:YXEP)很高兴宣布189号钻孔和2022年冬季计划的六(6)个钻孔(7个孔,总计2982米)的钻孔测试结果。结果显示,在公司在魁北克省Eeyou Istchee James Bay地区100%拥有的Sakami项目的La Pointe延伸金矿床,较高金矿化的深度和走向延伸了额外的200米。

Highlights (Table 1, Figures 1, 2 and 3)

亮点(表1,图1、图2和图3)

  • All seven (7) holes have intersected extensive mineralization over wide intervals.
  • The three most significant drill intersections are:
    • Hole PT-21-190: 1.61 g/t Au over 19.5 m including 4.91 g/t Au over 1.5 m
    • Hole PT-21-191: 0.84 g/t Au over 63.0 m including 1.25 g/t Au over 18.0 m
    • Hole PT-21-194: 0.94 g/t Au over 26.9 m including 1.77 g/t Au over 9.0 m
  • These holes confirm the continuity of the sub-vertically dipping higher-grade core of the deposit (500 m strike length, a depth of 600 m with an estimated average true thickness of
    40 m, up to 75 m in the central part of the deposit, and plunging about 45 degrees to the northeast) which could be amenable to open pit mining.
  • 所有七(7)个洞都在很大的间隔内与广泛的矿化相交。
  • 三个最重要的钻探交叉点是:
    • 孔PT-21-190:超过19.5米的1.61克/吨Au包括超过1.5米的4.91克/吨Au
    • 孔PT-21-191:超过63.0米的0.84克/吨Au包括超过18.0米的1.25克/吨Au
    • 孔PT-21-194:26.9米以上为0.94克/吨Au包括超过9.0米的1.77克/吨Au
  • 这些孔证实了矿床近垂直倾斜的较高品位岩心的连续性(走向长度500米,深度600米,估计平均真实厚度为
    矿藏中部最高可达75米,向东北倾斜约45度),适合露天开采。

Normand Champigny, QPM's Chief Executive Officer, stated: "These results show that the
La Pointe Extension deposit keeps expanding at depth and remains open in all directions. The drill results will add an important mineralized volume. In addition, we have numerous undrilled targets in interpreted large intrusive bodies near the deposit and over a strike length of 2.5 km to the south of the deposit. Additional drilling will be required to better define the mineralized zones and to optimize open pit geometries."

QPM首席执行官诺曼德·钱皮尼表示:这些结果表明,
拉庞特伸展矿床继续向深处扩张,并保持四面八方开放。钻探结果将增加重要的矿化量。此外,在矿床附近和矿床以南2.5公里的走向长度以上的解释大型侵入体中,我们还有许多未钻探的目标。将需要额外的钻探,以更好地界定矿化带,并优化露天矿的几何形状。"

The 2021 fall and 2022 winter drilling aimed to expand the La Pointe Extension deposit that could be amenable to open pit mining. To date, a total of 47 holes (14,535 m) have intersected the
La Pointe Extension deposit.

2021年秋季和2022年冬季钻探旨在扩大La Pointe延伸矿藏,该矿藏可能适合露天开采。到目前为止,总共有47个洞(14,535米)与
拉波因特延期存款。

The La Pointe Extension deposit and the La Pointe deposit are part of the Sakami project located along a 23-kilometre-long favourable geological contact that hosts gold mineralization. Both deposits are of similar geological character and a sub-vertically dipping higher-grade portion. They show a generally good spatial correlation between the gold mineralization and the abundance of disseminated arsenopyrite, pyrite and pyrrhotite hosted in a silicified paragneiss that is observed in drill holes. At the La Pointe deposit, the mineralized zone has a strike length 950 m, a depth of 450 m with an estimated average true thickness of 35 m, up to 63 m in the central part of the deposit.

La Pointe延伸矿藏和La Pointe矿藏是Sakami项目的一部分,位于23公里长的有利地质接触处,蕴藏着金矿。这两个矿床具有相似的地质特征,属于近垂直倾斜的较高品位部分。它们表明,金矿化与赋存于钻孔中硅化副片麻岩中的浸染性毒砂、黄铁矿和磁黄铁矿的丰度之间具有良好的空间相关性。在La Pointe矿床,矿化带走向长度为950米,深度为450米,估计平均真厚度为35米,在矿床中部可达63米。

Complete assay results and calculated composite grades released to date are available on QPM's website ( For previously disclosed results in connection with the La Pointe and La Pointe Extension deposits, see press releases of June 9, 2021, November 2, 2021, February 24, 2022 and March 10, 2022.

到目前为止公布的完整分析结果和计算的综合等级可在QPM的网站上获得(有关之前披露的与La Pointe和La Pointe延伸矿藏有关的结果,请参阅2021年6月9日, 2021年11月2日, 2022年2月24日2022年3月10日.

Quality Assurance/Quality Control

质量保证/质量控制

The drilling contract was awarded to Orbit Garant Drilling Inc., based in Val-d'Or, Quebec. The hole diameter is NQ. Quality assurance and quality control procedures have been implemented to ensure best practices in sampling and analysis of the core samples. The drill core was logged and then split, with one-half sent for assay and the other retained in the core box as a witness sample. Duplicates, standards and blanks were regularly inserted into the sample stream. The samples were delivered, in secure tagged bags, directly to the ALS Minerals laboratory facility in Val-d'Or, Quebec. The samples are weighed and identified prior to sample preparation. All samples are analyzed by fire assay with AA finish on a 30 g sample (0.005-10 ppm Au), with a gravimetric finish for assays over 10 ppm Au.

钻井合同授予了总部位于魁北克省Val-d‘Or的Orbit Garant Drilling Inc.。孔直径为NQ。已经实施了质量保证和质量控制程序,以确保核心样品的抽样和分析方面的最佳做法。钻芯被记录下来,然后裂开,一半送去化验,另一半保留在芯盒中作为见证样本。在样品流中定期插入复制品、标准和空白。样品被装在安全的标签袋中,直接送到魁北克省Val-d‘Or的ALS Minerals实验室设施。在样品制备之前,对样品进行称重和鉴定。所有样品都是在30克样品(0.005-10ppm Au)上用AA涂饰剂进行火试金分析,对于超过10ppm Au的分析,用重量分析涂饰剂。

The Sakami Project

Sakami项目

The Sakami Project provides the Company with a controlling position over a 23-km long segment of a favourable geological contact and comprises 281 claims (142 km2). It is located 570 km north of Val d'Or, Quebec, 120 km east of the municipality of Wemindji, 90 km from the Éléonore gold mine and 47 km northeast of the paved James Bay Road. Good infrastructure, including major access roads, a hydro-powered electric grid and airports, are present in the region. Drilling can be carried out throughout the year.

Sakami项目为公司提供了对23公里长的有利地质接触区段的控制地位,包括281项索赔(142公里2)。它位于魁北克Val d‘Or以北570公里处,Wemindji市以东120公里处,距离埃莱奥诺尔金矿90公里,已铺设的詹姆斯湾公路东北47公里处。该地区有良好的基础设施,包括主要通道、水电电网和机场。全年都可以进行钻探。

Qualified Persons

合格人员

Normand Champigny, Eng., Chief Executive Officer of the Company, and Qualified Person under NI 43-101 on standards of disclosure for mineral projects, has prepared and reviewed the content of this press release. François Gagnon, P. Geo., Senior Exploration Geologist with Consul-Teck Exploration Minière Inc. has also reviewed the content of this release.

本公司首席执行官Normand Champigny和NI 43-101关于矿产项目披露标准的合格人员已准备并审阅了本新闻稿的内容。领事-泰克勘探迷你公司的高级勘探地质学家François Gagnon,P.Geo也审阅了本新闻稿的内容。

About Quebec Precious Metals Corporation

关于魁北克贵金属公司

QPM is a gold explorer with a large land position in the highly prospective Eeyou Istchee James Bay territory, Quebec, near Newmont Corporation's Éléonore gold mine. QPM's flagship project is the Sakami project with significant grades and well-defined drill-ready targets. QPM's goal is to rapidly explore the Sakami project and advance to the mineral resource estimate stage.

QPM是一家金矿勘探商,在魁北克极具前景的Eeyou Istchee James Bay地区拥有大量土地,靠近Newmont Corporation的Herléonore金矿。QPM的旗舰项目是Sakami项目,具有重要的等级和明确的钻探目标。QPM的目标是快速勘探Sakami项目,并进入矿产资源评估阶段。

For more information, please contact:

如需更多信息,请联系:

Normand Champigny
Chief Executive Officer
Tel.: 514 979-4746
Email: nchampigny@qpmcorp.ca

诺曼德·香槟
首席执行官
电话:514979-4746
电子邮件:nChamigny@qpmcorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.

多伦多证券交易所风险交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Forward-Looking Statements

前瞻性陈述

This release includes forward looking statements. Often, but not always, forward-looking statements can generally be identified by the use of forward-looking words such as "may", "will", "expect", "intend", "plan", "estimate", "anticipate", "continue", and "guidance", or other similar words and may include, without limitation statements regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and expected costs or production output.

本新闻稿包括前瞻性陈述。前瞻性表述通常但不总是可以通过使用“可能”、“将”、“预期”、“打算”、“计划”、“估计”、“预期”、“继续”和“指导”或其他类似词语来识别,可能包括但不限于关于计划、战略和管理目标、预期生产或建设开工日期以及预期成本或产量的表述。

Forward-looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause actual results, performance and achievements to differ materially from any future results, performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades of resources or reserves, political and social risks, changes to the regulatory framework within which the entity operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation.

前瞻性陈述本身就涉及已知和未知的风险、不确定性和其他因素,这些风险、不确定性和其他因素可能导致实际结果、业绩和成就与未来的任何结果、业绩或成就大不相同。相关因素可能包括但不限于商品价格的变化、外汇波动和总体经济状况、生产投入成本和需求的增加、勘探和项目开发的投机性,包括获得必要的许可证和许可以及资源或储备数量或等级减少的风险、政治和社会风险、实体经营或未来可能经营的监管框架的变化、包括极端天气条件在内的环境条件、人员的招聘和保留、劳资关系问题和诉讼。

Forward-looking statements are based on the entity and its management's good faith assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect business and operations in the future. There are no assurances that the assumptions on which forward-looking statements are based will prove to be correct, or that the business or operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by the entity or management or beyond the entity's control.

前瞻性陈述基于该实体及其管理层对未来将存在并影响业务和运营的金融、市场、监管和其他相关环境的诚意假设。不能保证前瞻性陈述所依据的假设将被证明是正确的,也不能保证业务或运营不会受到实体或管理层无法预见或无法控制的这些或其他因素的任何实质性影响。

Although there have been attempts to identify factors that would cause actual actions, events or results to differ materially from those disclosed in forward-looking statements, there may be other factors that could cause actual results, performance, achievements or events not to be anticipated, estimated or intended, and many events are beyond the reasonable control of the entity. Accordingly, readers are cautioned not to place undue reliance on forward-looking statements.

尽管有人试图找出可能导致实际行动、事件或结果与前瞻性陈述中披露的大不相同的因素,但可能还有其他因素可能导致实际结果、业绩、成就或事件不在预期、估计或预期之中,许多事件超出实体的合理控制范围。因此,提醒读者不要过度依赖前瞻性陈述。

Forward-looking statements in this release are given as at the date of issue only. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information the entity does not undertake any obligation to publicly update or revise any of the forward-looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.

本新闻稿中的前瞻性陈述仅限于发布之日。在遵守适用法律或任何相关证券交易所上市规则规定的任何持续义务的情况下,在提供该等信息时,本实体不承担任何义务公开更新或修订任何前瞻性陈述,或就任何该等陈述所依据的事件、条件或情况的任何变化提供意见。

Table 1: Summary of significant drill hole assay results from the winter 2022 program,
Sakami project - Press release of May 26, 2022

表1:2022年冬季计划的重要钻孔分析结果摘要,
Sakami项目-2022年5月26日新闻稿

Notes:

备注:

  1. All widths are drill-indicated core length.
  2. Drill holes are generally planned to intersect mineralization as close to perpendicular to strike as possible.
  3. All gold values presented are not capped.
  1. 所有宽度均为钻头指示的岩心长度。
  2. 钻孔通常计划与矿化尽可能垂直地相交,以便尽可能地走向。
  3. 所有提供的黄金价值都没有上限。

La Pointe Extension deposit

拉庞特延伸矿藏

Hole #

UTM E

UTM N

Length (m)

Azimuth

(°)

Dip

(°)

Number of samples

From
(m)

To

(m)

Interval (m)

Au
(g/t)

PT-21-189

374117

5893902

369

125

-65

303

205.50

223.00

17.50

0.52

258.50

261.50

3.00

0.83

270.00

274.00

4.00

0.51

PT-21-190

374117

5893902

501

125

-79.7

427

327.00

342.00

15.00

0.77

Including

330.00

331.50

1.50

1.94

390.00

409.50

19.50

1.61

including

402.00

403.50

1.50

4.91

PT-22-191

374117

5893902

693

150

-85

557

496.70

507.00

10.30

0.59

520.50

583.50

63.00

0.84

including

535.50

553.50

18.00

1.25

PT-22-192

374117

5893902

303

139.55

-62.3

249

198.00

207.00

9.00

0.96

including

199.10

202.90

3.80

1.56

241.50

273.00

31.50

0.77

including

244.50

259.50

15.00

1.16

PT-22-193

374117

5893902

375

155

-60

311

196.50

207.00

10.50

1.72

including

202.50

205.50

3.00

4.99

264.00

271.50

7.50

0.81

PT-22-194

374012

5893887

441

145

-60

359

267.00

293.90

26.90

0.94

including

271.50

280.50

9.00

1.77

PT-22-195

373873

5893541

300

145

-70

238

144.00

160.20

16.20

0.94

including

150.00

156.00

6.00

1.47

孔编号

UTM E

UTM N

长度(米)

方位角

(°)

浸渍

(°)

样本数

从…
(m)

(m)

间隔(M)

Au
(克/吨)

PT-21-189

374117

5893902

369

125

-65

303

205.50

223.00

17.50

0.52

258.50

261.50

3.00

0.83

270.00

274.00

4.00

0.51

PT-21-190

374117

5893902

501

125

-79.7

427

327.00

342.00

15.00

0.77

包括

330.00

331.50

1.50

1.94

390.00

409.50

19.50

1.61

包括

402.00

403.50

1.50

4.91

PT-22-191

374117

5893902

693

150

-85

557

496.70

507.00

10.30

0.59

520.50

583.50

63.00

0.84

包括

535.50

553.50

18.00

1.25

PT-22-192

374117

5893902

303

139.55

-62.3

249

198.00

207.00

9.00

0.96

包括

199.10

202.90

3.80

1.56

241.50

273.00

31.50

0.77

包括

244.50

259.50

15.00

1.16

PT-22-193

374117

5893902

375

155

-60

311

196.50

207.00

10.50

1.72

包括

202.50

205.50

3.00

4.99

264.00

271.50

7.50

0.81

PT-22-194

374012

5893887

441

145

-60

359

267.00

293.90

26.90

0.94

包括

271.50

280.50

9.00

1.77

PT-22-195

373873

5893541

300

145

-70

238

144.00

160.20

16.20

0.94

包括

150.00

156.00

6.00

1.47

Figure 1

图1

Figure 2

图2

Figure 3

图3

SOURCE: Quebec Precious Metals Corporation

资料来源:魁北克贵金属公司


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发