YTD: 42 Ships ordered vs. $4.5B Target.
According to Tradewind, Seaspan has ordered as many as 10 dual-fuel powered container ships from two Chinese shipyards under long-term charters. Specifically, SeaSpan has ordered 6 13,000 TEU liquefied natural gas (LNG) dual-fuel container ships from East China, a subsidiary of China Shipping Group, and 4 9000 TEU methanol dual-fuel powered container ships from Yangzijiang Shipbuilding Group, the largest private shipping company in China, leased by Japan Ocean Connected Shipping (ONE) and Danish shipping giant Maersk, respectively.
According to Tradewind, Seaspan has ordered as many as 10 dual-fuel powered container ships from two Chinese shipyards under long-term charters. Specifically, SeaSpan has ordered 6 13,000 TEU liquefied natural gas (LNG) dual-fuel container ships from East China, a subsidiary of China Shipping Group, and 4 9000 TEU methanol dual-fuel powered container ships from Yangzijiang Shipbuilding Group, the largest private shipping company in China, leased by Japan Ocean Connected Shipping (ONE) and Danish shipping giant Maersk, respectively.
Translated
1
YTD ORDERS WON 38 Ships.
YTD ORDER VALUE US$3.32B vs US$4.5B
YTD SHIPS DELIVERED 28 vs. 63.
YTD ORDER VALUE US$3.32B vs US$4.5B
YTD SHIPS DELIVERED 28 vs. 63.
1
YTD:27/63 Ships Completed.
生产速递】项目收官丨第十艘3500TEU集装箱船“MAERSK YELLOWSTONE”轮交付离厂
扬子江船业 2024-05-25 12:30 听全文
生产速递】项目收官丨第十艘3500TEU集装箱船“MAERSK YELLOWSTONE”轮交付离厂
扬子江船业 2024-05-25 12:30 听全文
1
YTD: 38; US$3.32B/US$4.5B Ship Orders.
Shipowner Navigazione Montanari orders first newbuildings since global financial crisis
Italian owner orders two MR1 tankers in China
21 May 2024
Italian tanker owner Navigazione Montanari has taken to the shipbuilding market after an investigation of almost 18 years.
It has decomposed Singapore-listed Yangzijiang Shipbuilding to Construct Two 41,000-dwt Product
The company is said to be paying close to $45M for each MR1 tan...
Shipowner Navigazione Montanari orders first newbuildings since global financial crisis
Italian owner orders two MR1 tankers in China
21 May 2024
Italian tanker owner Navigazione Montanari has taken to the shipbuilding market after an investigation of almost 18 years.
It has decomposed Singapore-listed Yangzijiang Shipbuilding to Construct Two 41,000-dwt Product
The company is said to be paying close to $45M for each MR1 tan...
Translated
4
YTD:28/63 Ships Completed.
【生产速递】扬子三井为日本船东大河内建造的首制82500DWT散货船交付离厂
扬子江船业 2024-05-17 19:13
【生产速递】扬子三井为日本船东大河内建造的首制82500DWT散货船交付离厂
扬子江船业 2024-05-17 19:13
1
1
YTD: 25 /63 Ships Completed. (2024 Target: 63 ships)
【生产速递】集团首制1260TEU甲醇双燃料集装箱船交付
扬子江船业 2024-05-16 19:54 听全文
【生产速递】集团首制1260TEU甲醇双燃料集装箱船交付
扬子江船业 2024-05-16 19:54 听全文
3
1
YTD: 36 Ship Orders (2024 Target is US$4.5B)
According to trade news, Singapore's Xinpu Chemical (SP Chemicals) Company, which changed from a chemical plant to a shipowner, ordered 3 99,000 cubic meter very large ethane carriers (VLEC) from the Chinese shipyard Yangzijiang Shipbuilding Industry. Yangzijiang Shipbuilding entered the VLEC construction market with this order.
According to trade news, Singapore's Xinpu Chemical (SP Chemicals) Company, which changed from a chemical plant to a shipowner, ordered 3 99,000 cubic meter very large ethane carriers (VLEC) from the Chinese shipyard Yangzijiang Shipbuilding Industry. Yangzijiang Shipbuilding entered the VLEC construction market with this order.
Translated
2
1
BlessedInvestment
commented on
YTD: 33 ship orders won.
According to reports, Greek tanker owner Performance Shipping ordered an LR1 chemical/product tanker from Jiangsu Yangzijiang Shipbuilding. Previously, Shanghai Waigaoqiao Shipbuilding had ordered 3 114,000 DWT LR2 tankers, reserved for LNG. The new ship is expected to be delivered in January 2027.
According to reports, Greek tanker owner Performance Shipping ordered an LR1 chemical/product tanker from Jiangsu Yangzijiang Shipbuilding. Previously, Shanghai Waigaoqiao Shipbuilding had ordered 3 114,000 DWT LR2 tankers, reserved for LNG. The new ship is expected to be delivered in January 2027.
Translated
1
2
YTD: 24/63 Ships Completed.
扬子江集团两船同日交付
龙de船人 龙de船人 2024-05-01 18:51
扬子江集团两船同日交付
龙de船人 龙de船人 2024-05-01 18:51
1
YTD: 23/63 Ships Completed.
生产速递】扬子三井造丨第二艘63200DWT散货船“DARYA NITYA”轮命名交付
扬子江船业 2024-04-30 20:25
生产速递】扬子三井造丨第二艘63200DWT散货船“DARYA NITYA”轮命名交付
扬子江船业 2024-04-30 20:25
1